| HORAIRES DES VOLS |
|---|
| Vols directs: |
| Tous les jours
07:40
Belgrade (BEG) 2
09:10
Vienna (VIE) 1 Air Serbia JU 310 Non-stop ATR 72 (AT7) 1:30 Effective 2026-03-29 through 2026-05-27 |
| Jeu
07:40
Belgrade (BEG) 2
08:55
Vienna (VIE) 1 Air Serbia JU 310 Non-stop Embraer EMB 195 (E95) 1:15 Operates only on 2026-05-28 |
| Tous les jours
07:40
Belgrade (BEG) 2
09:10
Vienna (VIE) 1 Air Serbia JU 310 Non-stop ATR 72 (AT7) 1:30 Effective 2026-05-29 through 2026-06-04 |
| Ven
07:40
Belgrade (BEG) 2
08:55
Vienna (VIE) 1 Air Serbia JU 310 Non-stop Embraer EMB 195 (E95) 1:15 Operates only on 2026-06-05 |
| Tous les jours
07:40
Belgrade (BEG) 2
09:10
Vienna (VIE) 1 Air Serbia JU 310 Non-stop ATR 72 (AT7) 1:30 Effective 2026-06-06 through 2026-09-16 |
| Jeu
07:40
Belgrade (BEG) 2
08:55
Vienna (VIE) 1 Air Serbia JU 310 Non-stop Embraer EMB 195 (E95) 1:15 Effective 2026-09-17 through 2026-09-24 |
| Lun-Mer,Ven-Dim
07:40
Belgrade (BEG) 2
09:10
Vienna (VIE) 1 Air Serbia JU 310 Non-stop ATR 72 (AT7) 1:30 Effective 2026-09-18 through 2026-09-30 |
| Tous les jours
07:40
Belgrade (BEG) 2
09:10
Vienna (VIE) 1 Air Serbia JU 310 Non-stop ATR 72 (AT7) 1:30 Effective from 2026-10-01 |
| Tous les jours
07:45
Belgrade (BEG) 2
09:15
Vienna (VIE) 1 Air Serbia JU 310 Non-stop ATR 72 (AT7) 1:30 Valid until 2026-03-28 |
| Lun,Ven,Dim
12:40
Belgrade (BEG) 2
14:10
Vienna (VIE) 1 Air Serbia JU 312 Non-stop ATR 72 (AT7) 1:30 Effective from 2026-03-29 |
| Ven,Dim
12:55
Belgrade (BEG) 2
14:25
Vienna (VIE) 1 Air Serbia JU 312 Non-stop ATR 72 (AT7) 1:30 Valid until 2026-01-11 |
| Lun,Mar,Jeu-Dim
18:35
Belgrade (BEG) 2
20:05
Vienna (VIE) 1 Air Serbia JU 314 Non-stop ATR 72 (AT7) 1:30 Valid until 2026-01-06 |
| Tous les jours
18:35
Belgrade (BEG) 2
20:05
Vienna (VIE) 1 Air Serbia JU 314 Non-stop ATR 72 (AT7) 1:30 Effective from 2026-01-07 |
| Mer
11:00
Belgrade (BEG) 2
12:30
Vienna (VIE) 3 Austrian OS 722 Non-stop ATR 72 (AT7) 1:30 Effective 2026-01-21 through 2026-01-28 |
| Tous les jours
11:05
Belgrade (BEG) 2
12:15
Vienna (VIE) 3 Austrian OS 722 Non-stop Embraer EMB 195 (E95) 1:10 Effective 2026-03-29 through 2026-10-24 |
| Tous les jours
11:05
Belgrade (BEG) 2
12:35
Vienna (VIE) 3 Austrian OS 722 Non-stop ATR 72 (AT7) 1:30 Effective from 2026-10-25 |
| Tous les jours
11:10
Belgrade (BEG) 2
12:20
Vienna (VIE) 3 Austrian OS 722 Non-stop Embraer EMB 195 (E95) 1:10 Valid until 2026-01-05 |
| Lun,Mer-Dim
11:10
Belgrade (BEG) 2
12:20
Vienna (VIE) 3 Austrian OS 722 Non-stop Embraer EMB 195 (E95) 1:10 Effective 2026-01-07 through 2026-01-19 |
| Lun,Jeu-Dim
11:10
Belgrade (BEG) 2
12:20
Vienna (VIE) 3 Austrian OS 722 Non-stop Embraer EMB 195 (E95) 1:10 Effective 2026-01-22 through 2026-02-02 |
| Tous les jours
11:10
Belgrade (BEG) 2
12:20
Vienna (VIE) 3 Austrian OS 722 Non-stop Embraer EMB 195 (E95) 1:10 Effective 2026-02-03 through 2026-03-28 |
| Dim
18:10
Belgrade (BEG) 2
19:40
Vienna (VIE) 3 Austrian OS 724 Non-stop ATR 72 (AT7) 1:30 Valid until 2026-03-22 |
| Jeu
18:15
Belgrade (BEG) 2
19:45
Vienna (VIE) 3 Austrian OS 724 Non-stop Embraer EMB 195 (E95) 1:30 Valid until 2026-01-01 |
| Mar,Mer,Ven
18:15
Belgrade (BEG) 2
19:45
Vienna (VIE) 3 Austrian OS 724 Non-stop ATR 72 (AT7) 1:30 Valid until 2026-01-20 |
| Mar,Mer,Ven
18:15
Belgrade (BEG) 2
19:45
Vienna (VIE) 3 Austrian OS 724 Non-stop ATR 72 (AT7) 1:30 Effective 2026-01-27 through 2026-03-04 |
| Mar-Ven
18:15
Belgrade (BEG) 2
19:45
Vienna (VIE) 3 Austrian OS 724 Non-stop ATR 72 (AT7) 1:30 Effective 2026-03-05 through 2026-03-27 |
| Mar-Ven,Dim
18:15
Belgrade (BEG) 2
19:45
Vienna (VIE) 3 Austrian OS 724 Non-stop ATR 72 (AT7) 1:30 Effective from 2026-10-25 |
| Ven
18:30
Belgrade (BEG) 2
20:00
Vienna (VIE) 3 Austrian OS 724 Non-stop ATR 72 (AT7) 1:30 Operates only on 2026-01-23 |
| Tous les jours
18:30
Belgrade (BEG) 2
20:00
Vienna (VIE) 3 Austrian OS 724 Non-stop ATR 72 (AT7) 1:30 Effective 2026-03-29 through 2026-10-24 |
| Lun-Sam
06:50
Belgrade (BEG) 2
08:05
Vienna (VIE) 3 Austrian OS 726 Non-stop Airbus A320 (320) 1:15 Effective 2026-01-02 through 2026-01-13 |
| Mer,Sam
06:50
Belgrade (BEG) 2
08:05
Vienna (VIE) 3 Austrian OS 726 Non-stop Embraer EMB 195 (E95) 1:15 Effective 2026-01-14 through 2026-01-17 |
| Lun-Ven
06:50
Belgrade (BEG) 2
08:05
Vienna (VIE) 3 Austrian OS 726 Non-stop Airbus A320 (320) 1:15 Effective 2026-01-15 through 2026-01-22 |
| Lun,Jeu,Ven
06:50
Belgrade (BEG) 2
08:05
Vienna (VIE) 3 Austrian OS 726 Non-stop Embraer EMB 195 (E95) 1:15 Effective 2026-01-23 through 2026-01-29 |
| Mar,Mer,Ven,Sam
06:50
Belgrade (BEG) 2
08:05
Vienna (VIE) 3 Austrian OS 726 Non-stop Airbus A320 (320) 1:15 Effective 2026-01-24 through 2026-01-31 |
| Lun-Sam
06:50
Belgrade (BEG) 2
08:05
Vienna (VIE) 3 Austrian OS 726 Non-stop Airbus A320 (320) 1:15 Effective 2026-02-02 through 2026-02-28 |
| Lun-Sam
06:50
Belgrade (BEG) 2
08:05
Vienna (VIE) 3 Austrian OS 726 Non-stop Embraer EMB 195 (E95) 1:15 Effective 2026-03-02 through 2026-03-07 |
| Lun,Mer
06:50
Belgrade (BEG) 2
08:05
Vienna (VIE) 3 Austrian OS 726 Non-stop Airbus A320 (320) 1:15 Effective 2026-03-09 through 2026-03-11 |
| Lun,Mar,Jeu-Sam
06:50
Belgrade (BEG) 2
08:05
Vienna (VIE) 3 Austrian OS 726 Non-stop Embraer EMB 195 (E95) 1:15 Effective 2026-03-10 through 2026-03-17 |
| Mar-Sam
06:50
Belgrade (BEG) 2
08:05
Vienna (VIE) 3 Austrian OS 726 Non-stop Embraer EMB 195 (E95) 1:15 Effective 2026-03-18 through 2026-03-28 |
| Lun
06:50
Belgrade (BEG) 2
08:05
Vienna (VIE) 3 Austrian OS 726 Non-stop Airbus A320 (320) 1:15 Operates only on 2026-03-23 |
| Lun-Sam
06:50
Belgrade (BEG) 2
08:05
Vienna (VIE) 3 Austrian OS 726 Non-stop Airbus A320 (320) 1:15 Effective from 2026-10-26 |
| Lun
07:00
Belgrade (BEG) 2
08:10
Vienna (VIE) 3 Austrian OS 726 Non-stop Embraer EMB 195 (E95) 1:10 Operates only on 2026-03-30 |
| Tous les jours
07:00
Belgrade (BEG) 2
08:10
Vienna (VIE) 3 Austrian OS 726 Non-stop Airbus A320 (320) 1:10 Effective 2026-03-31 through 2026-07-03 |
| Sam
07:00
Belgrade (BEG) 2
08:10
Vienna (VIE) 3 Austrian OS 726 Non-stop Embraer EMB 195 (E95) 1:10 Effective 2026-07-04 through 2026-09-12 |
| Lun-Ven,Dim
07:00
Belgrade (BEG) 2
08:10
Vienna (VIE) 3 Austrian OS 726 Non-stop Airbus A320 (320) 1:10 Effective 2026-07-05 through 2026-09-18 |
| Tous les jours
07:00
Belgrade (BEG) 2
08:10
Vienna (VIE) 3 Austrian OS 726 Non-stop Airbus A320 (320) 1:10 Effective 2026-09-19 through 2026-10-24 |
| Vols directs en partage de code: |
| Lun,Ven,Dim
12:40
Belgrade (BEG) 2
14:10
Vienna (VIE) 1 ITA Airways AZ 2509 Non-stop ATR 72 (AT7) 1:30 Effective 2026-03-29 through 2026-10-23 Codeshare flight, operated by Air Serbia.(JU 312) |
| Mer,Ven,Dim
12:55
Belgrade (BEG) 2
14:25
Vienna (VIE) 1 ITA Airways AZ 2509 Non-stop ATR 72 (AT7) 1:30 Valid until 2026-01-04 Codeshare flight, operated by Air Serbia.(JU 312) |
| Ven,Dim
12:55
Belgrade (BEG) 2
14:25
Vienna (VIE) 1 ITA Airways AZ 2509 Non-stop ATR 72 (AT7) 1:30 Effective 2026-01-09 through 2026-01-11 Codeshare flight, operated by Air Serbia.(JU 312) |
| Tous les jours
07:45
Belgrade (BEG) 2
09:15
Vienna (VIE) 1 Air China CA 5592 Non-stop ATR 72 (AT7) 1:30 Valid until 2026-03-28 Codeshare flight, operated by Air Serbia.(JU 310) |
| Mar,Ven
06:50
Belgrade (BEG) 2
08:05
Vienna (VIE) 3 ANA NH 5649 Non-stop Airbus A320 (320) 1:15 Effective 2026-01-02 through 2026-01-20 Codeshare flight, operated by Austrian.(OS 726) |