WestJet vols de Vancouver (YVR) à Toronto Pearson (YYZ).

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Jeu 10:00 Vancouver (YVR) M 17:41 Toronto Pearson (YYZ) 3
WestJet WS 712 Non-stop Boeing 737-700 (73W) 4:41 Operates only on 2026-03-26
Lun,Mar,Jeu,Dim 10:00 Vancouver (YVR) M 17:41 Toronto Pearson (YYZ) 3
WestJet WS 712 Non-stop Boeing 737 MAX 8 (7M8) 4:41 Effective 2026-04-02 through 2026-04-12
Mer,Ven 10:00 Vancouver (YVR) M 17:41 Toronto Pearson (YYZ) 3
WestJet WS 712 Non-stop Boeing 737-800 (73H) 4:41 Effective 2026-04-03 through 2026-04-10
Lun,Jeu 10:00 Vancouver (YVR) M 17:41 Toronto Pearson (YYZ) 3
WestJet WS 712 Non-stop Boeing 737-800 (73H) 4:41 Effective 2026-04-13 through 2026-04-16
Lun-Mer,Ven,Dim 10:00 Vancouver (YVR) M 17:41 Toronto Pearson (YYZ) 3
WestJet WS 712 Non-stop Boeing 737 MAX 8 (7M8) 4:41 Effective 2026-04-14 through 2026-04-21
Mer 10:00 Vancouver (YVR) M 17:41 Toronto Pearson (YYZ) 3
WestJet WS 712 Non-stop Boeing 737-700 (73W) 4:41 Operates only on 2026-04-22
Jeu 10:00 Vancouver (YVR) M 17:41 Toronto Pearson (YYZ) 3
WestJet WS 712 Non-stop Boeing 737 MAX 8 (7M8) 4:41 Operates only on 2026-04-23
Ven 10:00 Vancouver (YVR) M 17:41 Toronto Pearson (YYZ) 3
WestJet WS 712 Non-stop Boeing 737-800 (73H) 4:41 Operates only on 2026-04-24
Lun-Ven,Dim 10:00 Vancouver (YVR) M 17:38 Toronto Pearson (YYZ) 3
WestJet WS 712 Non-stop Boeing 737 MAX 8 (7M8) 4:38 Effective 2026-04-26 through 2026-06-26
Mar-Dim 10:00 Vancouver (YVR) M 17:38 Toronto Pearson (YYZ) 3
WestJet WS 712 Non-stop Boeing 737 MAX 8 (7M8) 4:38 Effective 2026-06-27 through 2026-07-05
Tous les jours 10:00 Vancouver (YVR) M 17:38 Toronto Pearson (YYZ) 3
WestJet WS 712 Non-stop Boeing 737 MAX 8 (7M8) 4:38 Effective 2026-07-06 through 2026-09-04
Lun-Ven,Dim 10:00 Vancouver (YVR) M 17:38 Toronto Pearson (YYZ) 3
WestJet WS 712 Non-stop Boeing 737 MAX 8 (7M8) 4:38 Effective 2026-09-06 through 2026-10-02
Tous les jours 10:00 Vancouver (YVR) M 17:38 Toronto Pearson (YYZ) 3
WestJet WS 712 Non-stop Boeing 737 MAX 8 (7M8) 4:38 Effective 2026-10-03 through 2026-10-16
Lun-Ven,Dim 10:00 Vancouver (YVR) M 17:38 Toronto Pearson (YYZ) 3
WestJet WS 712 Non-stop Boeing 737 MAX 8 (7M8) 4:38 Effective 2026-10-18 through 2026-10-23
Lun-Ven,Dim 10:00 Vancouver (YVR) M 17:40 Toronto Pearson (YYZ) 3
WestJet WS 712 Non-stop Boeing 737-800 (73H) 4:40 Effective from 2026-10-25
Tous les jours 11:30 Vancouver (YVR) M 19:08 Toronto Pearson (YYZ) 3
WestJet WS 714 Non-stop Boeing 737 MAX 8 (7M8) 4:38 Effective 2026-06-29 through 2026-10-12
Dim 13:15 Vancouver (YVR) M 20:53 Toronto Pearson (YYZ) 3
WestJet WS 714 Non-stop Boeing 737 MAX 8 (7M8) 4:38 Operates only on 2026-04-26
Lun,Dim 14:15 Vancouver (YVR) M 21:53 Toronto Pearson (YYZ) 3
WestJet WS 714 Non-stop Boeing 737 MAX 8 (7M8) 4:38 Valid until 2026-01-04
Jeu,Ven 14:15 Vancouver (YVR) M 21:53 Toronto Pearson (YYZ) 3
WestJet WS 714 Non-stop Boeing 737-700 (73W) 4:38 Valid until 2026-01-02
Lun,Jeu-Sam 14:15 Vancouver (YVR) M 21:53 Toronto Pearson (YYZ) 3
WestJet WS 714 Non-stop Boeing 737-800 (73H) 4:38 Effective 2026-01-03 through 2026-01-10
Lun,Jeu,Sam,Dim 14:15 Vancouver (YVR) M 21:53 Toronto Pearson (YYZ) 3
WestJet WS 714 Non-stop Boeing 737 MAX 8 (7M8) 4:38 Effective 2026-01-11 through 2026-01-25
Ven 14:15 Vancouver (YVR) M 21:53 Toronto Pearson (YYZ) 3
WestJet WS 714 Non-stop Boeing 737-800 (73H) 4:38 Effective 2026-01-16 through 2026-01-23
Lun,Ven,Sam 14:15 Vancouver (YVR) M 21:53 Toronto Pearson (YYZ) 3
WestJet WS 714 Non-stop Boeing 737-800 (73H) 4:38 Effective 2026-01-26 through 2026-01-31
Jeu 14:15 Vancouver (YVR) M 21:53 Toronto Pearson (YYZ) 3
WestJet WS 714 Non-stop Boeing 737 MAX 8 (7M8) 4:38 Operates only on 2026-01-29
Jeu,Dim 14:15 Vancouver (YVR) M 21:55 Toronto Pearson (YYZ) 3
WestJet WS 714 Non-stop Boeing 737 MAX 8 (7M8) 4:40 Effective 2026-02-01 through 2026-02-15
Lun,Ven,Sam 14:15 Vancouver (YVR) M 21:55 Toronto Pearson (YYZ) 3
WestJet WS 714 Non-stop Boeing 737-800 (73H) 4:40 Effective 2026-02-02 through 2026-02-14
Lun,Jeu,Dim 14:15 Vancouver (YVR) M 21:55 Toronto Pearson (YYZ) 3
WestJet WS 714 Non-stop Boeing 737 MAX 8 (7M8) 4:40 Effective 2026-02-16 through 2026-02-22
Lun,Ven,Sam 14:15 Vancouver (YVR) M 21:55 Toronto Pearson (YYZ) 3
WestJet WS 714 Non-stop Boeing 737-800 (73H) 4:40 Effective 2026-02-20 through 2026-02-28
Lun,Jeu,Dim 14:15 Vancouver (YVR) M 21:55 Toronto Pearson (YYZ) 3
WestJet WS 714 Non-stop Boeing 737 MAX 8 (7M8) 4:40 Effective 2026-02-26 through 2026-03-05
Ven-Dim 14:15 Vancouver (YVR) M 21:55 Toronto Pearson (YYZ) 3
WestJet WS 714 Non-stop Boeing 737 MAX 8 (7M8) 4:40 Effective 2026-03-06 through 2026-03-08
Lun,Jeu-Dim 14:15 Vancouver (YVR) M 21:55 Toronto Pearson (YYZ) 3
WestJet WS 714 Non-stop Boeing 737-800 (73H) 4:40 Effective 2026-03-09 through 2026-03-15
Lun,Jeu,Dim 14:15 Vancouver (YVR) M 21:55 Toronto Pearson (YYZ) 3
WestJet WS 714 Non-stop Boeing 737 MAX 8 (7M8) 4:40 Effective 2026-03-16 through 2026-03-26
Ven,Sam 14:15 Vancouver (YVR) M 21:55 Toronto Pearson (YYZ) 3
WestJet WS 714 Non-stop Boeing 737-800 (73H) 4:40 Effective 2026-03-20 through 2026-04-04
Dim 14:15 Vancouver (YVR) M 21:55 Toronto Pearson (YYZ) 3
WestJet WS 714 Non-stop Boeing 737-800 (7S8) 4:40 Operates only on 2026-03-29
Lun,Jeu 14:15 Vancouver (YVR) M 21:55 Toronto Pearson (YYZ) 3
WestJet WS 714 Non-stop Boeing 737 MAX 8 (7M8) 4:40 Effective 2026-03-30 through 2026-04-09
Ven-Dim 14:15 Vancouver (YVR) M 21:55 Toronto Pearson (YYZ) 3
WestJet WS 714 Non-stop Boeing 737-800 (73H) 4:40 Effective 2026-04-05 through 2026-04-11
Jeu,Sam,Dim 14:15 Vancouver (YVR) M 21:55 Toronto Pearson (YYZ) 3
WestJet WS 714 Non-stop Boeing 737 MAX 8 (7M8) 4:40 Effective 2026-04-12 through 2026-04-18
Lun,Ven,Dim 14:15 Vancouver (YVR) M 21:55 Toronto Pearson (YYZ) 3
WestJet WS 714 Non-stop Boeing 737-800 (73H) 4:40 Effective 2026-04-13 through 2026-04-19
Lun,Jeu,Sam 14:15 Vancouver (YVR) M 21:55 Toronto Pearson (YYZ) 3
WestJet WS 714 Non-stop Boeing 737 MAX 8 (7M8) 4:40 Effective 2026-04-20 through 2026-04-25
Ven 14:15 Vancouver (YVR) M 21:55 Toronto Pearson (YYZ) 3
WestJet WS 714 Non-stop Boeing 737-800 (73H) 4:40 Operates only on 2026-04-24
Tous les jours 14:15 Vancouver (YVR) M 21:55 Toronto Pearson (YYZ) 3
WestJet WS 714 Non-stop Boeing 737-800 (73H) 4:40 Effective from 2026-10-25
Tous les jours 13:15 Vancouver (YVR) M 20:53 Toronto Pearson (YYZ) 3
WestJet WS 718 Non-stop Boeing 737 MAX 8 (7M8) 4:38 Effective 2026-04-27 through 2026-10-24
Mer-Dim 17:00 Vancouver (YVR) M 00:38 Toronto Pearson (YYZ) 3
WestJet WS 718 Non-stop Boeing 737-800 (73H) 4:38 Valid until 2026-01-07
The flight arrives 1 day after departure.
Lun 17:00 Vancouver (YVR) M 00:38 Toronto Pearson (YYZ) 3
WestJet WS 718 Non-stop Boeing 737-700 (73W) 4:38 Operates only on 2026-01-05
The flight arrives 1 day after departure.
Lun,Mar,Jeu,Dim 17:00 Vancouver (YVR) M 00:38 Toronto Pearson (YYZ) 3
WestJet WS 718 Non-stop Boeing 737 MAX 8 (7M8) 4:38 Effective 2026-01-06 through 2026-01-12
The flight arrives 1 day after departure.
Mer,Ven,Sam 17:00 Vancouver (YVR) M 00:38 Toronto Pearson (YYZ) 3
WestJet WS 718 Non-stop Boeing 737-800 (73H) 4:38 Effective 2026-01-09 through 2026-01-17
The flight arrives 1 day after departure.
Mar,Jeu 17:00 Vancouver (YVR) M 00:38 Toronto Pearson (YYZ) 3
WestJet WS 718 Non-stop Boeing 737-700 (73W) 4:38 Effective 2026-01-13 through 2026-01-15
The flight arrives 1 day after departure.
Sam,Dim 17:00 Vancouver (YVR) M 00:38 Toronto Pearson (YYZ) 3
WestJet WS 718 Non-stop Boeing 737-800 (73H) 4:38 Effective 2026-01-18 through 2026-01-25
The flight arrives 1 day after departure.
Lun,Mar,Jeu,Ven 17:00 Vancouver (YVR) M 00:38 Toronto Pearson (YYZ) 3
WestJet WS 718 Non-stop Boeing 737 MAX 8 (7M8) 4:38 Effective 2026-01-19 through 2026-01-26
The flight arrives 1 day after departure.
Mar,Mer 17:00 Vancouver (YVR) M 00:38 Toronto Pearson (YYZ) 3
WestJet WS 718 Non-stop Boeing 737-700 (73W) 4:38 Effective 2026-01-21 through 2026-01-27
The flight arrives 1 day after departure.
prev   1 2 3 4   next


WestJet vols de Vancouver (YVR) à Toronto Pearson (YYZ).
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Operates only on 2026-03-26
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 4:41, non-stop
Boeing 737-700 (73W)

Vols directs:

Effective 2026-04-02 through 2026-04-12
Lun
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
Duration: 4:41, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-04-03 through 2026-04-10
Lun
-
Mar
-
Mer
Jeu
-
Ven
Sam
-
Dim
-
Duration: 4:41, non-stop
Boeing 737-800 (73H)

Vols directs:

Effective 2026-04-13 through 2026-04-16
Lun
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 4:41, non-stop
Boeing 737-800 (73H)

Vols directs:

Effective 2026-04-14 through 2026-04-21
Lun
Mar
Mer
Jeu
-
Ven
Sam
-
Dim
Duration: 4:41, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Operates only on 2026-04-22
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 4:41, non-stop
Boeing 737-700 (73W)

Vols directs:

Operates only on 2026-04-23
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 4:41, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Operates only on 2026-04-24
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 4:41, non-stop
Boeing 737-800 (73H)

Vols directs:

Effective 2026-04-26 through 2026-06-26
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
Duration: 4:38, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-06-27 through 2026-07-05
Lun
-
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 4:38, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-07-06 through 2026-09-04
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 4:38, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-09-06 through 2026-10-02
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
Duration: 4:38, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-10-03 through 2026-10-16
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 4:38, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-10-18 through 2026-10-23
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
Duration: 4:38, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective from 2026-10-25
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
Duration: 4:40, non-stop
Boeing 737-800 (73H)

Vols directs:

Effective 2026-06-29 through 2026-10-12
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 4:38, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Operates only on 2026-04-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 4:38, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Valid until 2026-01-04
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 4:38, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Valid until 2026-01-02
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 4:38, non-stop
Boeing 737-700 (73W)

Vols directs:

Effective 2026-01-03 through 2026-01-10
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
Dim
-
Duration: 4:38, non-stop
Boeing 737-800 (73H)

Vols directs:

Effective 2026-01-11 through 2026-01-25
Lun
Mar
-
Mer
-
Jeu
Ven
-
Sam
Dim
Duration: 4:38, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-01-16 through 2026-01-23
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 4:38, non-stop
Boeing 737-800 (73H)

Vols directs:

Effective 2026-01-26 through 2026-01-31
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
Dim
-
Duration: 4:38, non-stop
Boeing 737-800 (73H)

Vols directs:

Operates only on 2026-01-29
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 4:38, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-02-01 through 2026-02-15
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
Duration: 4:40, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-02-02 through 2026-02-14
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
Dim
-
Duration: 4:40, non-stop
Boeing 737-800 (73H)

Vols directs:

Effective 2026-02-16 through 2026-02-22
Lun
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
Duration: 4:40, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-02-20 through 2026-02-28
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
Dim
-
Duration: 4:40, non-stop
Boeing 737-800 (73H)

Vols directs:

Effective 2026-02-26 through 2026-03-05
Lun
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
Duration: 4:40, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-03-06 through 2026-03-08
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
Dim
Duration: 4:40, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-03-09 through 2026-03-15
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
Dim
Duration: 4:40, non-stop
Boeing 737-800 (73H)

Vols directs:

Effective 2026-03-16 through 2026-03-26
Lun
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
Duration: 4:40, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-03-20 through 2026-04-04
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
Dim
-
Duration: 4:40, non-stop
Boeing 737-800 (73H)

Vols directs:

Operates only on 2026-03-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 4:40, non-stop
Boeing 737-800 (7S8)

Vols directs:

Effective 2026-03-30 through 2026-04-09
Lun
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 4:40, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-04-05 through 2026-04-11
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
Dim
Duration: 4:40, non-stop
Boeing 737-800 (73H)

Vols directs:

Effective 2026-04-12 through 2026-04-18
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
Dim
Duration: 4:40, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-04-13 through 2026-04-19
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 4:40, non-stop
Boeing 737-800 (73H)

Vols directs:

Effective 2026-04-20 through 2026-04-25
Lun
Mar
-
Mer
-
Jeu
Ven
-
Sam
Dim
-
Duration: 4:40, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Operates only on 2026-04-24
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 4:40, non-stop
Boeing 737-800 (73H)

Vols directs:

Effective from 2026-10-25
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 4:40, non-stop
Boeing 737-800 (73H)

Vols directs:

Effective 2026-04-27 through 2026-10-24
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 4:38, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Valid until 2026-01-07
Lun
-
Mar
-
Mer
Jeu
Ven
Sam
Dim
Duration: 4:38, non-stop
Boeing 737-800 (73H)
The flight arrives 1 day after departure.

Vols directs:

Operates only on 2026-01-05
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 4:38, non-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.

Vols directs:

Effective 2026-01-06 through 2026-01-12
Lun
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
Duration: 4:38, non-stop
Boeing 737 MAX 8 (7M8)
The flight arrives 1 day after departure.

Vols directs:

Effective 2026-01-09 through 2026-01-17
Lun
-
Mar
-
Mer
Jeu
-
Ven
Sam
Dim
-
Duration: 4:38, non-stop
Boeing 737-800 (73H)
The flight arrives 1 day after departure.

Vols directs:

Effective 2026-01-13 through 2026-01-15
Lun
-
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 4:38, non-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.

Vols directs:

Effective 2026-01-18 through 2026-01-25
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
Duration: 4:38, non-stop
Boeing 737-800 (73H)
The flight arrives 1 day after departure.

Vols directs:

Effective 2026-01-19 through 2026-01-26
Lun
Mar
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 4:38, non-stop
Boeing 737 MAX 8 (7M8)
The flight arrives 1 day after departure.

Vols directs:

Effective 2026-01-21 through 2026-01-27
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 4:38, non-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.
prev        Page 2 / 4        next
  • Il s'agit d'une ligne intérieure au départ de l'aéroport de Vancouver (YVR) et à destination de l'aéroport de Toronto Pearson (YYZ).
  • La distance est de 3343 km.
  • Le fuseau horaire de l'aéroport de départ est UTC-8 , et le fuseau horaire de l'aéroport d'arrivée est UTC-5 . Il est actuellement (loading...) au point de départ et (loading...) au point d'arrivée. Il y a un décalage horaire de (loading...) heure(s) entre les aéroports.
  • Pour les vols directs, le temps de vol varie entre 4:38 et 4:41.