Southwest Airlines vols de Pittsburgh (PIT) à Nashville (BNA).

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Lun 19:05 Pittsburgh (PIT) 20:00 Nashville (BNA)
Southwest Airlines WN 1763 Non-stop Boeing 737-800 (73H) 1:55 Operates only on 2026-03-02
Lun,Jeu,Ven 20:45 Pittsburgh (PIT) 21:30 Nashville (BNA)
Southwest Airlines WN 1763 Non-stop Boeing 737 MAX 8 (7M8) 1:45 Effective 2026-02-12 through 2026-02-16
Jeu,Ven,Dim 20:45 Pittsburgh (PIT) 21:30 Nashville (BNA)
Southwest Airlines WN 1763 Non-stop Boeing 737 MAX 8 (7M8) 1:45 Effective 2026-02-20 through 2026-03-01
Sam 06:25 Pittsburgh (PIT) 07:00 Nashville (BNA)
Southwest Airlines WN 1935 Non-stop Boeing 737-800 (73H) 1:35 Effective 2026-06-06 through 2026-08-01
Lun-Ven 06:30 Pittsburgh (PIT) 07:05 Nashville (BNA)
Southwest Airlines WN 1935 Non-stop Boeing 737-800 (73H) 1:35 Effective 2026-06-04 through 2026-08-03
Dim 06:30 Pittsburgh (PIT) 07:05 Nashville (BNA)
Southwest Airlines WN 1935 Non-stop Boeing 737-700 (Scimitar Winglets) 1:35 Effective 2026-06-07 through 2026-08-02
Dim 19:45 Pittsburgh (PIT) 20:25 Nashville (BNA)
Southwest Airlines WN 1970 Non-stop Boeing 737 MAX 8 (7M8) 1:40 Operates only on 2026-05-24
Dim 21:10 Pittsburgh (PIT) 21:45 Nashville (BNA)
Southwest Airlines WN 2437 Non-stop Boeing 737-800 (73H) 1:35 Effective 2026-06-07 through 2026-08-02
Lun-Ven 18:55 Pittsburgh (PIT) 19:40 Nashville (BNA)
Southwest Airlines WN 2487 Non-stop Boeing 737 MAX 8 (7M8) 1:45 Effective 2026-01-06 through 2026-01-14
Mar-Ven,Dim 18:55 Pittsburgh (PIT) 19:40 Nashville (BNA)
Southwest Airlines WN 2487 Non-stop Boeing 737 MAX 8 (7M8) 1:45 Effective 2026-01-18 through 2026-01-23
Lun-Ven 18:55 Pittsburgh (PIT) 19:40 Nashville (BNA)
Southwest Airlines WN 2487 Non-stop Boeing 737 MAX 8 (7M8) 1:45 Effective 2026-01-26 through 2026-02-04
Mar,Mer,Dim 18:55 Pittsburgh (PIT) 19:40 Nashville (BNA)
Southwest Airlines WN 2487 Non-stop Boeing 737 MAX 8 (7M8) 1:45 Effective 2026-02-08 through 2026-02-11
Mar,Mer 18:55 Pittsburgh (PIT) 19:40 Nashville (BNA)
Southwest Airlines WN 2487 Non-stop Boeing 737 MAX 8 (7M8) 1:45 Effective 2026-02-18 through 2026-03-04
Lun,Mar,Ven,Dim 21:25 Pittsburgh (PIT) 22:00 Nashville (BNA)
Southwest Airlines WN 2510 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Valid until 2026-01-04
Sam 21:25 Pittsburgh (PIT) 22:00 Nashville (BNA)
Southwest Airlines WN 2510 Non-stop Boeing 737-800 (73H) 1:35 Valid until 2026-01-03
Jeu,Ven,Dim 05:30 Pittsburgh (PIT) 06:40 Nashville (BNA)
Southwest Airlines WN 3247 Non-stop Boeing 737-700 (Scimitar Winglets) 2:10 Effective 2026-01-11 through 2026-01-16
Lun,Dim 05:30 Pittsburgh (PIT) 06:40 Nashville (BNA)
Southwest Airlines WN 3247 Non-stop Boeing 737-700 (Scimitar Winglets) 2:10 Effective 2026-01-19 through 2026-01-25
Jeu,Ven,Dim 05:30 Pittsburgh (PIT) 06:40 Nashville (BNA)
Southwest Airlines WN 3247 Non-stop Boeing 737-700 (Scimitar Winglets) 2:10 Effective 2026-02-01 through 2026-02-06
Lun,Dim 05:30 Pittsburgh (PIT) 06:40 Nashville (BNA)
Southwest Airlines WN 3247 Non-stop Boeing 737-700 (Scimitar Winglets) 2:10 Effective 2026-02-09 through 2026-02-15
Lun,Mar,Jeu 05:30 Pittsburgh (PIT) 06:40 Nashville (BNA)
Southwest Airlines WN 3247 Non-stop Boeing 737-700 (Scimitar Winglets) 2:10 Effective 2026-02-17 through 2026-02-23
Lun 05:30 Pittsburgh (PIT) 06:40 Nashville (BNA)
Southwest Airlines WN 3247 Non-stop Boeing 737-700 (Scimitar Winglets) 2:10 Operates only on 2026-03-02
Sam 05:50 Pittsburgh (PIT) 06:50 Nashville (BNA)
Southwest Airlines WN 3247 Non-stop Boeing 737-800 (73H) 2:00 Effective 2026-02-14 through 2026-02-28
Lun,Jeu,Ven 06:00 Pittsburgh (PIT) 07:05 Nashville (BNA)
Southwest Airlines WN 3247 Non-stop Boeing 737 MAX 8 (7M8) 2:05 Effective 2026-02-12 through 2026-02-16
Jeu,Ven,Dim 06:00 Pittsburgh (PIT) 07:05 Nashville (BNA)
Southwest Airlines WN 3247 Non-stop Boeing 737 MAX 8 (7M8) 2:05 Effective 2026-02-20 through 2026-03-01
Lun-Ven 06:25 Pittsburgh (PIT) 07:30 Nashville (BNA)
Southwest Airlines WN 3247 Non-stop Boeing 737 MAX 8 (7M8) 2:05 Effective 2026-01-06 through 2026-01-14
Sam 06:25 Pittsburgh (PIT) 07:30 Nashville (BNA)
Southwest Airlines WN 3247 Non-stop Boeing 737-800 (73H) 2:05 Effective 2026-01-10 through 2026-02-07
Mar-Ven,Dim 06:25 Pittsburgh (PIT) 07:30 Nashville (BNA)
Southwest Airlines WN 3247 Non-stop Boeing 737 MAX 8 (7M8) 2:05 Effective 2026-01-18 through 2026-01-23
Lun-Ven 06:25 Pittsburgh (PIT) 07:30 Nashville (BNA)
Southwest Airlines WN 3247 Non-stop Boeing 737 MAX 8 (7M8) 2:05 Effective 2026-01-26 through 2026-02-04
Mar,Mer,Dim 06:25 Pittsburgh (PIT) 07:30 Nashville (BNA)
Southwest Airlines WN 3247 Non-stop Boeing 737 MAX 8 (7M8) 2:05 Effective 2026-02-08 through 2026-02-11
Mar,Mer 06:25 Pittsburgh (PIT) 07:30 Nashville (BNA)
Southwest Airlines WN 3247 Non-stop Boeing 737 MAX 8 (7M8) 2:05 Effective 2026-02-18 through 2026-03-04
Lun,Jeu,Ven 06:10 Pittsburgh (PIT) 06:45 Nashville (BNA)
Southwest Airlines WN 3289 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2026-08-06 through 2026-09-28
Sam 06:20 Pittsburgh (PIT) 06:55 Nashville (BNA)
Southwest Airlines WN 3289 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2026-08-08 through 2026-09-26
Mar,Mer 06:30 Pittsburgh (PIT) 07:05 Nashville (BNA)
Southwest Airlines WN 3289 Non-stop Boeing 737-800 (73H) 1:35 Effective 2026-08-04 through 2026-09-30
Dim 07:05 Pittsburgh (PIT) 07:40 Nashville (BNA)
Southwest Airlines WN 3289 Non-stop Boeing 737-800 (73H) 1:35 Effective 2026-08-09 through 2026-09-27
Lun,Jeu,Ven 12:00 Pittsburgh (PIT) 12:35 Nashville (BNA)
Southwest Airlines WN 3290 Non-stop Boeing 737-700 (Scimitar Winglets) 1:35 Effective 2026-08-06 through 2026-09-28
Mar,Mer 12:40 Pittsburgh (PIT) 13:15 Nashville (BNA)
Southwest Airlines WN 3290 Non-stop Boeing 737-700 (Scimitar Winglets) 1:35 Effective 2026-08-04 through 2026-09-30
Dim 12:40 Pittsburgh (PIT) 13:15 Nashville (BNA)
Southwest Airlines WN 3290 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2026-08-09 through 2026-09-27
Sam 13:55 Pittsburgh (PIT) 14:30 Nashville (BNA)
Southwest Airlines WN 3290 Non-stop Boeing 737-700 (Scimitar Winglets) 1:35 Effective 2026-08-08 through 2026-09-26
Mar,Mer 19:20 Pittsburgh (PIT) 19:50 Nashville (BNA)
Southwest Airlines WN 3291 Non-stop Boeing 737 MAX 8 (7M8) 1:30 Effective 2026-08-04 through 2026-09-30
Lun,Jeu,Ven 19:25 Pittsburgh (PIT) 19:55 Nashville (BNA)
Southwest Airlines WN 3291 Non-stop Boeing 737-800 (73H) 1:30 Effective 2026-08-06 through 2026-09-28
Dim 19:35 Pittsburgh (PIT) 20:05 Nashville (BNA)
Southwest Airlines WN 3291 Non-stop Boeing 737 MAX 8 (7M8) 1:30 Effective 2026-08-09 through 2026-09-27
Dim 11:20 Pittsburgh (PIT) 11:55 Nashville (BNA)
Southwest Airlines WN 3362 Non-stop Boeing 737-800 (73H) 1:35 Effective 2026-06-07 through 2026-08-02
Lun,Jeu,Ven 13:45 Pittsburgh (PIT) 14:20 Nashville (BNA)
Southwest Airlines WN 3362 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2026-06-04 through 2026-08-03
Sam 20:25 Pittsburgh (PIT) 21:00 Nashville (BNA)
Southwest Airlines WN 3363 Non-stop Boeing 737-800 (73H) 1:35 Effective 2026-06-06 through 2026-08-01
Lun,Jeu,Ven 21:15 Pittsburgh (PIT) 21:50 Nashville (BNA)
Southwest Airlines WN 3363 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2026-06-04 through 2026-08-03
Lun,Jeu,Ven 12:40 Pittsburgh (PIT) 13:25 Nashville (BNA)
Southwest Airlines WN 4470 Non-stop Boeing 737-700 (Scimitar Winglets) 1:45 Effective 2026-02-12 through 2026-02-16
Jeu,Ven,Dim 12:40 Pittsburgh (PIT) 13:25 Nashville (BNA)
Southwest Airlines WN 4470 Non-stop Boeing 737-700 (Scimitar Winglets) 1:45 Effective 2026-02-20 through 2026-03-01
Mar,Mer 13:35 Pittsburgh (PIT) 14:10 Nashville (BNA)
Southwest Airlines WN 4725 Non-stop Boeing 737-700 (Scimitar Winglets) 1:35 Effective 2026-06-09 through 2026-07-29
prev   1 2


Southwest Airlines vols de Pittsburgh (PIT) à Nashville (BNA).
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Operates only on 2026-03-02
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737-800 (73H)

Vols directs:

Effective 2026-02-12 through 2026-02-16
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:45, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-02-20 through 2026-03-01
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:45, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-06-06 through 2026-08-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Vols directs:

Effective 2026-06-04 through 2026-08-03
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Vols directs:

Effective 2026-06-07 through 2026-08-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:35, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Operates only on 2026-05-24
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:40, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-06-07 through 2026-08-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Vols directs:

Effective 2026-01-06 through 2026-01-14
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:45, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-01-18 through 2026-01-23
Lun
-
Mar
Mer
Jeu
Ven
Sam
-
Dim
Duration: 1:45, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-01-26 through 2026-02-04
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:45, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-02-08 through 2026-02-11
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:45, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-02-18 through 2026-03-04
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:45, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Valid until 2026-01-04
Lun
Mar
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Valid until 2026-01-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Vols directs:

Effective 2026-01-11 through 2026-01-16
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:10, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Effective 2026-01-19 through 2026-01-25
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:10, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Effective 2026-02-01 through 2026-02-06
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:10, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Effective 2026-02-09 through 2026-02-15
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:10, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Effective 2026-02-17 through 2026-02-23
Lun
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 2:10, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Operates only on 2026-03-02
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:10, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Effective 2026-02-14 through 2026-02-28
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:00, non-stop
Boeing 737-800 (73H)

Vols directs:

Effective 2026-02-12 through 2026-02-16
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 2:05, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-02-20 through 2026-03-01
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:05, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-01-06 through 2026-01-14
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 2:05, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-01-10 through 2026-02-07
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Vols directs:

Effective 2026-01-18 through 2026-01-23
Lun
-
Mar
Mer
Jeu
Ven
Sam
-
Dim
Duration: 2:05, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-01-26 through 2026-02-04
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 2:05, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-02-08 through 2026-02-11
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:05, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-02-18 through 2026-03-04
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:05, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-08-06 through 2026-09-28
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-08-08 through 2026-09-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-08-04 through 2026-09-30
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Vols directs:

Effective 2026-08-09 through 2026-09-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Vols directs:

Effective 2026-08-06 through 2026-09-28
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:35, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Effective 2026-08-04 through 2026-09-30
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:35, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Effective 2026-08-09 through 2026-09-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-08-08 through 2026-09-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:35, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Effective 2026-08-04 through 2026-09-30
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:30, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-08-06 through 2026-09-28
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Vols directs:

Effective 2026-08-09 through 2026-09-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:30, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-06-07 through 2026-08-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Vols directs:

Effective 2026-06-04 through 2026-08-03
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-06-06 through 2026-08-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Vols directs:

Effective 2026-06-04 through 2026-08-03
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-02-12 through 2026-02-16
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:45, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Effective 2026-02-20 through 2026-03-01
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:45, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Effective 2026-06-09 through 2026-07-29
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:35, non-stop
Boeing 737-700 (Scimitar Winglets)
prev        Page 2 / 2
  • Il s'agit d'une ligne intérieure au départ de l'aéroport de Pittsburgh (PIT) et à destination de l'aéroport de Nashville (BNA).
  • La distance est de 742 km.
  • Le fuseau horaire de l'aéroport de départ est UTC-5 , et le fuseau horaire de l'aéroport d'arrivée est UTC-6 . Il est actuellement (loading...) au point de départ et (loading...) au point d'arrivée. Il y a un décalage horaire de (loading...) heure(s) entre les aéroports.
  • Pour les vols directs, le temps de vol varie entre 1:30 et 2:10.