Southwest Airlines vols de Orlando (MCO) à Sacramento (SMF).

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Mer,Jeu 16:10 Orlando (MCO) 19:10 Sacramento (SMF) B
Southwest Airlines WN 639 Non-stop Boeing 737 MAX 8 (7M8) 6:00 Valid until 2026-01-01
Sam 14:50 Orlando (MCO) 17:50 Sacramento (SMF) B
Southwest Airlines WN 792 Non-stop Boeing 737 MAX 8 (7M8) 6:00 Valid until 2026-01-03
Ven,Dim 15:55 Orlando (MCO) 18:55 Sacramento (SMF) B
Southwest Airlines WN 792 Non-stop Boeing 737-700 (Scimitar Winglets) 6:00 Effective 2026-01-02 through 2026-01-04
Lun,Jeu,Ven 08:20 Orlando (MCO) 11:15 Sacramento (SMF) B
Southwest Airlines WN 1885 Non-stop Boeing 737-800 (73H) 5:55 Effective 2026-04-09 through 2026-06-01
Dim 08:40 Orlando (MCO) 11:30 Sacramento (SMF) B
Southwest Airlines WN 1885 Non-stop Boeing 737 MAX 8 (7M8) 5:50 Effective 2026-04-12 through 2026-05-17
Dim 08:40 Orlando (MCO) 11:30 Sacramento (SMF) B
Southwest Airlines WN 1885 Non-stop Boeing 737 MAX 8 (7M8) 5:50 Operates only on 2026-05-31
Mar,Mer 09:10 Orlando (MCO) 12:05 Sacramento (SMF) B
Southwest Airlines WN 1885 Non-stop Boeing 737 MAX 8 (7M8) 5:55 Effective 2026-04-07 through 2026-06-03
Sam 18:25 Orlando (MCO) 21:20 Sacramento (SMF) B
Southwest Airlines WN 1885 Non-stop Boeing 737-800 (73H) 5:55 Effective 2026-04-11 through 2026-05-30
Dim 16:55 Orlando (MCO) 19:50 Sacramento (SMF) B
Southwest Airlines WN 2447 Non-stop Boeing 737-800 (73H) 5:55 Operates only on 2026-05-24
Mar,Mer 19:30 Orlando (MCO) 22:10 Sacramento (SMF) B
Southwest Airlines WN 2613 Non-stop Boeing 737 MAX 8 (7M8) 5:40 Effective 2026-06-09 through 2026-07-29
Lun,Jeu,Ven 09:30 Orlando (MCO) 12:35 Sacramento (SMF) B
Southwest Airlines WN 2629 Non-stop Boeing 737-800 (73H) 6:05 Effective 2026-02-05 through 2026-02-09
Mar,Jeu,Dim 09:30 Orlando (MCO) 12:35 Sacramento (SMF) B
Southwest Airlines WN 2629 Non-stop Boeing 737-800 (73H) 6:05 Effective 2026-02-15 through 2026-02-19
Lun 09:30 Orlando (MCO) 12:35 Sacramento (SMF) B
Southwest Airlines WN 2629 Non-stop Boeing 737-800 (73H) 6:05 Effective 2026-02-23 through 2026-03-02
Jeu,Ven,Dim 09:50 Orlando (MCO) 12:55 Sacramento (SMF) B
Southwest Airlines WN 2629 Non-stop Boeing 737-800 (73H) 6:05 Effective 2026-01-11 through 2026-01-16
Lun,Dim 09:50 Orlando (MCO) 12:55 Sacramento (SMF) B
Southwest Airlines WN 2629 Non-stop Boeing 737-800 (73H) 6:05 Effective 2026-01-19 through 2026-01-25
Dim 09:50 Orlando (MCO) 12:55 Sacramento (SMF) B
Southwest Airlines WN 2629 Non-stop Boeing 737-800 (73H) 6:05 Operates only on 2026-02-01
Lun,Jeu,Ven 11:45 Orlando (MCO) 14:50 Sacramento (SMF) B
Southwest Airlines WN 2629 Non-stop Boeing 737-800 (73H) 6:05 Effective 2026-02-12 through 2026-02-16
Jeu,Ven,Dim 11:45 Orlando (MCO) 14:50 Sacramento (SMF) B
Southwest Airlines WN 2629 Non-stop Boeing 737-800 (73H) 6:05 Effective 2026-02-20 through 2026-03-01
Sam 13:00 Orlando (MCO) 16:05 Sacramento (SMF) B
Southwest Airlines WN 2629 Non-stop Boeing 737-700 (Scimitar Winglets) 6:05 Operates only on 2026-02-07
Sam 13:10 Orlando (MCO) 16:15 Sacramento (SMF) B
Southwest Airlines WN 2629 Non-stop Boeing 737 MAX 8 (7M8) 6:05 Effective 2026-01-10 through 2026-01-31
Lun-Ven 14:10 Orlando (MCO) 17:15 Sacramento (SMF) B
Southwest Airlines WN 2629 Non-stop Boeing 737-800 (73H) 6:05 Effective 2026-01-06 through 2026-01-14
Mar-Ven,Dim 14:10 Orlando (MCO) 17:15 Sacramento (SMF) B
Southwest Airlines WN 2629 Non-stop Boeing 737-800 (73H) 6:05 Effective 2026-01-18 through 2026-01-23
Lun-Ven 14:10 Orlando (MCO) 17:15 Sacramento (SMF) B
Southwest Airlines WN 2629 Non-stop Boeing 737-800 (73H) 6:05 Effective 2026-01-26 through 2026-02-04
Mar,Mer,Dim 14:10 Orlando (MCO) 17:15 Sacramento (SMF) B
Southwest Airlines WN 2629 Non-stop Boeing 737-800 (73H) 6:05 Effective 2026-02-08 through 2026-02-11
Mar,Mer 14:10 Orlando (MCO) 17:15 Sacramento (SMF) B
Southwest Airlines WN 2629 Non-stop Boeing 737-800 (73H) 6:05 Effective 2026-02-18 through 2026-03-04
Sam 17:20 Orlando (MCO) 20:25 Sacramento (SMF) B
Southwest Airlines WN 2629 Non-stop Boeing 737-700 (Scimitar Winglets) 6:05 Effective 2026-02-14 through 2026-02-28
Lun,Jeu,Ven 13:30 Orlando (MCO) 16:00 Sacramento (SMF) B
Southwest Airlines WN 2709 Non-stop Boeing 737-800 (73H) 5:30 Effective 2026-06-04 through 2026-08-03
Lun,Jeu,Ven 07:55 Orlando (MCO) 11:10 Sacramento (SMF) B
Southwest Airlines WN 3419 Non-stop Boeing 737-800 (73H) 6:15 Effective 2026-03-05 through 2026-04-06
Sam 16:55 Orlando (MCO) 20:10 Sacramento (SMF) B
Southwest Airlines WN 3419 Non-stop Boeing 737 MAX 8 (7M8) 6:15 Effective 2026-03-14 through 2026-04-04
Sam 17:25 Orlando (MCO) 20:40 Sacramento (SMF) B
Southwest Airlines WN 3419 Non-stop Boeing 737 MAX 8 (7M8) 6:15 Operates only on 2026-03-07
Mar,Mer,Dim 18:05 Orlando (MCO) 21:20 Sacramento (SMF) B
Southwest Airlines WN 3419 Non-stop Boeing 737 MAX 8 (7M8) 6:15 Effective 2026-03-08 through 2026-04-05
Dim 07:25 Orlando (MCO) 10:00 Sacramento (SMF) B
Southwest Airlines WN 3499 Non-stop Boeing 737 MAX 8 (7M8) 5:35 Effective 2026-06-07 through 2026-08-02
Lun 11:50 Orlando (MCO) 14:50 Sacramento (SMF) B
Southwest Airlines WN 3658 Non-stop Boeing 737-800 (73H) 6:00 Operates only on 2026-01-05
Sam 14:20 Orlando (MCO) 17:00 Sacramento (SMF) B
Southwest Airlines WN 3750 Non-stop Boeing 737-800 (73H) 5:40 Effective 2026-08-08 through 2026-09-26
Sam 17:45 Orlando (MCO) 20:35 Sacramento (SMF) B
Southwest Airlines WN 4058 Non-stop Boeing 737 MAX 8 (7M8) 5:50 Effective 2026-06-06 through 2026-08-01
Vols indirects:
Sam 17:10 Orlando (MCO) 21:20 Sacramento (SMF) B
Southwest Airlines WN 284 1-stop Boeing 737-700 (Scimitar Winglets) 7:10 Effective 2026-06-06 through 2026-08-01
Dim 08:45 Orlando (MCO) 13:15 Sacramento (SMF) B
Southwest Airlines WN 296 1-stop Boeing 737-800 (73H) 7:30 Effective 2026-03-08 through 2026-04-05
Sam 09:40 Orlando (MCO) 13:30 Sacramento (SMF) B
Southwest Airlines WN 855 1-stop Boeing 737-800 (73H) 6:50 Effective 2026-06-06 through 2026-08-01
Dim 08:00 Orlando (MCO) 12:40 Sacramento (SMF) B
Southwest Airlines WN 1120 1-stop Boeing 737 MAX 8 (7M8) 7:40 Effective 2026-04-12 through 2026-05-17
Dim 08:00 Orlando (MCO) 12:40 Sacramento (SMF) B
Southwest Airlines WN 1120 1-stop Boeing 737 MAX 8 (7M8) 7:40 Operates only on 2026-05-31
Jeu,Ven,Dim 15:10 Orlando (MCO) 20:00 Sacramento (SMF) B
Southwest Airlines WN 2264 1-stop Boeing 737-800 (73H) 7:50 Effective 2026-01-11 through 2026-01-16
Lun,Dim 15:10 Orlando (MCO) 20:00 Sacramento (SMF) B
Southwest Airlines WN 2264 1-stop Boeing 737-800 (73H) 7:50 Effective 2026-01-19 through 2026-01-25
Jeu,Ven,Dim 15:10 Orlando (MCO) 20:00 Sacramento (SMF) B
Southwest Airlines WN 2264 1-stop Boeing 737-800 (73H) 7:50 Effective 2026-02-01 through 2026-02-06
Lun,Dim 15:10 Orlando (MCO) 20:00 Sacramento (SMF) B
Southwest Airlines WN 2264 1-stop Boeing 737-800 (73H) 7:50 Effective 2026-02-09 through 2026-02-15
Lun,Mar,Jeu 15:10 Orlando (MCO) 20:00 Sacramento (SMF) B
Southwest Airlines WN 2264 1-stop Boeing 737-800 (73H) 7:50 Effective 2026-02-17 through 2026-02-23
Lun 15:10 Orlando (MCO) 20:00 Sacramento (SMF) B
Southwest Airlines WN 2264 1-stop Boeing 737-800 (73H) 7:50 Operates only on 2026-03-02
Mar,Mer 16:55 Orlando (MCO) 21:20 Sacramento (SMF) B
Southwest Airlines WN 2348 1-stop Boeing 737 MAX 8 (7M8) 7:25 Effective 2026-06-09 through 2026-07-29
Jeu,Ven,Dim 10:20 Orlando (MCO) 15:15 Sacramento (SMF) B
Southwest Airlines WN 2515 1-stop Boeing 737 MAX 8 (7M8) 7:55 Effective 2026-01-11 through 2026-01-16
Lun,Dim 10:20 Orlando (MCO) 15:15 Sacramento (SMF) B
Southwest Airlines WN 2515 1-stop Boeing 737 MAX 8 (7M8) 7:55 Effective 2026-01-19 through 2026-01-25
Dim 10:20 Orlando (MCO) 15:15 Sacramento (SMF) B
Southwest Airlines WN 2515 1-stop Boeing 737 MAX 8 (7M8) 7:55 Operates only on 2026-02-01
1 2   next


Southwest Airlines vols de Orlando (MCO) à Sacramento (SMF).
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Valid until 2026-01-01
Lun
-
Mar
-
Mer
Jeu
Ven
-
Sam
-
Dim
-
Duration: 6:00, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Valid until 2026-01-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 6:00, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-01-02 through 2026-01-04
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 6:00, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Effective 2026-04-09 through 2026-06-01
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 5:55, non-stop
Boeing 737-800 (73H)

Vols directs:

Effective 2026-04-12 through 2026-05-17
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 5:50, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Operates only on 2026-05-31
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 5:50, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-04-07 through 2026-06-03
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 5:55, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-04-11 through 2026-05-30
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 5:55, non-stop
Boeing 737-800 (73H)

Vols directs:

Operates only on 2026-05-24
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 5:55, non-stop
Boeing 737-800 (73H)

Vols directs:

Effective 2026-06-09 through 2026-07-29
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 5:40, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-02-05 through 2026-02-09
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 6:05, non-stop
Boeing 737-800 (73H)

Vols directs:

Effective 2026-02-15 through 2026-02-19
Lun
-
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
Duration: 6:05, non-stop
Boeing 737-800 (73H)

Vols directs:

Effective 2026-02-23 through 2026-03-02
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 6:05, non-stop
Boeing 737-800 (73H)

Vols directs:

Effective 2026-01-11 through 2026-01-16
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 6:05, non-stop
Boeing 737-800 (73H)

Vols directs:

Effective 2026-01-19 through 2026-01-25
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 6:05, non-stop
Boeing 737-800 (73H)

Vols directs:

Operates only on 2026-02-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 6:05, non-stop
Boeing 737-800 (73H)

Vols directs:

Effective 2026-02-12 through 2026-02-16
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 6:05, non-stop
Boeing 737-800 (73H)

Vols directs:

Effective 2026-02-20 through 2026-03-01
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 6:05, non-stop
Boeing 737-800 (73H)

Vols directs:

Operates only on 2026-02-07
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 6:05, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Effective 2026-01-10 through 2026-01-31
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 6:05, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-01-06 through 2026-01-14
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 6:05, non-stop
Boeing 737-800 (73H)

Vols directs:

Effective 2026-01-18 through 2026-01-23
Lun
-
Mar
Mer
Jeu
Ven
Sam
-
Dim
Duration: 6:05, non-stop
Boeing 737-800 (73H)

Vols directs:

Effective 2026-01-26 through 2026-02-04
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 6:05, non-stop
Boeing 737-800 (73H)

Vols directs:

Effective 2026-02-08 through 2026-02-11
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
Duration: 6:05, non-stop
Boeing 737-800 (73H)

Vols directs:

Effective 2026-02-18 through 2026-03-04
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 6:05, non-stop
Boeing 737-800 (73H)

Vols directs:

Effective 2026-02-14 through 2026-02-28
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 6:05, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Effective 2026-06-04 through 2026-08-03
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 5:30, non-stop
Boeing 737-800 (73H)

Vols directs:

Effective 2026-03-05 through 2026-04-06
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 6:15, non-stop
Boeing 737-800 (73H)

Vols directs:

Effective 2026-03-14 through 2026-04-04
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 6:15, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Operates only on 2026-03-07
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 6:15, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-03-08 through 2026-04-05
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
Duration: 6:15, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-06-07 through 2026-08-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 5:35, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Operates only on 2026-01-05
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 6:00, non-stop
Boeing 737-800 (73H)

Vols directs:

Effective 2026-08-08 through 2026-09-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 5:40, non-stop
Boeing 737-800 (73H)

Vols directs:

Effective 2026-06-06 through 2026-08-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 5:50, non-stop
Boeing 737 MAX 8 (7M8)

Vols indirects:

Effective 2026-06-06 through 2026-08-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 7:10, 1-stop
Boeing 737-700 (Scimitar Winglets)

Vols indirects:

Effective 2026-03-08 through 2026-04-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 7:30, 1-stop
Boeing 737-800 (73H)

Vols indirects:

Effective 2026-06-06 through 2026-08-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 6:50, 1-stop
Boeing 737-800 (73H)

Vols indirects:

Effective 2026-04-12 through 2026-05-17
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 7:40, 1-stop
Boeing 737 MAX 8 (7M8)

Vols indirects:

Operates only on 2026-05-31
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 7:40, 1-stop
Boeing 737 MAX 8 (7M8)

Vols indirects:

Effective 2026-01-11 through 2026-01-16
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 7:50, 1-stop
Boeing 737-800 (73H)

Vols indirects:

Effective 2026-01-19 through 2026-01-25
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 7:50, 1-stop
Boeing 737-800 (73H)

Vols indirects:

Effective 2026-02-01 through 2026-02-06
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 7:50, 1-stop
Boeing 737-800 (73H)

Vols indirects:

Effective 2026-02-09 through 2026-02-15
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 7:50, 1-stop
Boeing 737-800 (73H)

Vols indirects:

Effective 2026-02-17 through 2026-02-23
Lun
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 7:50, 1-stop
Boeing 737-800 (73H)

Vols indirects:

Operates only on 2026-03-02
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 7:50, 1-stop
Boeing 737-800 (73H)

Vols indirects:

Effective 2026-06-09 through 2026-07-29
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 7:25, 1-stop
Boeing 737 MAX 8 (7M8)

Vols indirects:

Effective 2026-01-11 through 2026-01-16
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 7:55, 1-stop
Boeing 737 MAX 8 (7M8)

Vols indirects:

Effective 2026-01-19 through 2026-01-25
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 7:55, 1-stop
Boeing 737 MAX 8 (7M8)

Vols indirects:

Operates only on 2026-02-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 7:55, 1-stop
Boeing 737 MAX 8 (7M8)
Page 1 / 2        next
  • Il s'agit d'une ligne intérieure au départ de l'aéroport de Orlando (MCO) et à destination de l'aéroport de Sacramento (SMF).
  • La distance est de 3865 km.
  • Le fuseau horaire de l'aéroport de départ est UTC-5 , et le fuseau horaire de l'aéroport d'arrivée est UTC-8 . Il est actuellement (loading...) au point de départ et (loading...) au point d'arrivée. Il y a un décalage horaire de (loading...) heure(s) entre les aéroports.
  • Pour les vols directs, le temps de vol varie entre 5:30 et 6:15.