Qatar Airways vols de Sydney (SYD) à Gold Coast (OOL).

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs en partage de code:
Jeu 10:20 Sydney (SYD) 2 10:40 Gold Coast (OOL) 1
Qatar Airways QR 4221 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-10-10 through 2024-10-24
Codeshare flight, operated by Virgin Australia.(VA 515)
Sam 16:20 Sydney (SYD) 2 16:40 Gold Coast (OOL) 1
Qatar Airways QR 4235 Non-stop Boeing 737-800 (73H) 1:20 Effective 2025-02-01 through 2025-03-29
Codeshare flight, operated by Virgin Australia.(VA 533)
Sam 17:20 Sydney (SYD) 2 17:40 Gold Coast (OOL) 1
Qatar Airways QR 4247 Non-stop Boeing 737-800 (73H) 1:20 Effective 2025-02-01 through 2025-03-29
Codeshare flight, operated by Virgin Australia.(VA 537)
Mer 11:20 Sydney (SYD) 2 11:40 Gold Coast (OOL) 1
Qatar Airways QR 4251 Non-stop Boeing 737-800 (73H) 1:20 Operates only on 2024-10-09
Codeshare flight, operated by Virgin Australia.(VA 517)
Sam 16:20 Sydney (SYD) 2 16:40 Gold Coast (OOL) 1
Qatar Airways QR 4253 Non-stop Boeing 737-800 (73H) 1:20 Operates only on 2024-10-26
Codeshare flight, operated by Virgin Australia.(VA 531)
Ven 10:20 Sydney (SYD) 2 11:40 Gold Coast (OOL) 1
Qatar Airways QR 4257 Non-stop Boeing 737-800 (73H) 1:20 Operates only on 2024-09-13
Codeshare flight, operated by Virgin Australia.(VA 515)
Lun 10:20 Sydney (SYD) 2 11:40 Gold Coast (OOL) 1
Qatar Airways QR 4259 Non-stop Boeing 737-800 (73H) 1:20 Operates only on 2024-09-02
Codeshare flight, operated by Virgin Australia.(VA 515)
Sam 13:50 Sydney (SYD) 2 14:10 Gold Coast (OOL) 1
Qatar Airways QR 4259 Non-stop Boeing 737-800 (73H) 1:20 Operates only on 2025-04-05
Codeshare flight, operated by Virgin Australia.(VA 525)
Lun,Ven-Dim 06:10 Sydney (SYD) 2 06:30 Gold Coast (OOL) 1
Qatar Airways QR 4269 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-10-07 through 2024-10-26
Codeshare flight, operated by Virgin Australia.(VA 501)
Sam 06:40 Sydney (SYD) 2 07:00 Gold Coast (OOL) 1
Qatar Airways QR 4269 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-11-23 through 2024-11-30
Codeshare flight, operated by Virgin Australia.(VA 501)
Lun-Ven 06:45 Sydney (SYD) 2 07:05 Gold Coast (OOL) 1
Qatar Airways QR 4269 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-10-28 through 2025-01-27
Codeshare flight, operated by Virgin Australia.(VA 505)
Lun,Jeu,Ven 06:45 Sydney (SYD) 2 07:05 Gold Coast (OOL) 1
Qatar Airways QR 4269 Non-stop Boeing 737-800 (73H) 1:20 Effective 2025-01-30 through 2025-03-28
Codeshare flight, operated by Virgin Australia.(VA 505)
Lun-Sam 07:10 Sydney (SYD) 2 08:30 Gold Coast (OOL) 1
Qatar Airways QR 4269 Non-stop Boeing 737-800 (73H) 1:20 Valid until 2024-10-05
Codeshare flight, operated by Virgin Australia.(VA 505)
Lun-Sam 07:10 Sydney (SYD) 2 08:30 Gold Coast (OOL) 1
Qatar Airways QR 4269 Non-stop Boeing 737-800 (73H) 1:20 Effective from 2025-04-07
Codeshare flight, operated by Virgin Australia.(VA 505)
Sam 07:20 Sydney (SYD) 2 07:40 Gold Coast (OOL) 1
Qatar Airways QR 4269 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-11-02 through 2024-11-16
Codeshare flight, operated by Virgin Australia.(VA 505)
Sam 07:20 Sydney (SYD) 2 07:40 Gold Coast (OOL) 1
Qatar Airways QR 4269 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-12-07 through 2024-12-21
Codeshare flight, operated by Virgin Australia.(VA 505)
Sam,Dim 07:20 Sydney (SYD) 2 07:40 Gold Coast (OOL) 1
Qatar Airways QR 4269 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-12-22 through 2025-02-01
Codeshare flight, operated by Virgin Australia.(VA 505)
Sam 07:20 Sydney (SYD) 2 07:40 Gold Coast (OOL) 1
Qatar Airways QR 4269 Non-stop Boeing 737-800 (73H) 1:20 Effective 2025-02-08 through 2025-03-29
Codeshare flight, operated by Virgin Australia.(VA 505)
Lun-Sam 07:20 Sydney (SYD) 2 07:40 Gold Coast (OOL) 1
Qatar Airways QR 4269 Non-stop Boeing 737-800 (73H) 1:20 Effective 2025-03-31 through 2025-04-05
Codeshare flight, operated by Virgin Australia.(VA 505)
Dim 09:20 Sydney (SYD) 2 10:40 Gold Coast (OOL) 1
Qatar Airways QR 4269 Non-stop Boeing 737-800 (73H) 1:20 Valid until 2024-09-29
Codeshare flight, operated by Virgin Australia.(VA 511)
Mar-Jeu,Dim 09:20 Sydney (SYD) 2 09:40 Gold Coast (OOL) 1
Qatar Airways QR 4269 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-10-06 through 2024-10-10
Codeshare flight, operated by Virgin Australia.(VA 511)
Mar-Jeu 09:20 Sydney (SYD) 2 09:40 Gold Coast (OOL) 1
Qatar Airways QR 4269 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-10-15 through 2024-10-24
Codeshare flight, operated by Virgin Australia.(VA 511)
Dim 09:20 Sydney (SYD) 2 09:40 Gold Coast (OOL) 1
Qatar Airways QR 4269 Non-stop Boeing 737-800 (73H) 1:20 Operates only on 2025-03-30
Codeshare flight, operated by Virgin Australia.(VA 511)
Dim 09:20 Sydney (SYD) 2 10:40 Gold Coast (OOL) 1
Qatar Airways QR 4269 Non-stop Boeing 737-800 (73H) 1:20 Effective from 2025-04-06
Codeshare flight, operated by Virgin Australia.(VA 511)
Sam 18:20 Sydney (SYD) 2 18:40 Gold Coast (OOL) 1
Qatar Airways QR 6313 Non-stop Boeing 737-800 (73H) 1:20 Effective 2025-03-29 through 2025-04-05
Codeshare flight, operated by Virgin Australia.(VA 541)
Ven 09:20 Sydney (SYD) 2 10:40 Gold Coast (OOL) 1
Qatar Airways QR 6317 Non-stop Boeing 737-800 (73H) 1:20 Effective from 2025-04-11
Codeshare flight, operated by Virgin Australia.(VA 511)
Ven 09:20 Sydney (SYD) 2 10:40 Gold Coast (OOL) 1
Qatar Airways QR 6323 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-09-13 through 2024-10-04
Codeshare flight, operated by Virgin Australia.(VA 511)
Sam 12:20 Sydney (SYD) 2 13:40 Gold Coast (OOL) 1
Qatar Airways QR 6323 Non-stop Boeing 737-800 (73H) 1:20 Valid until 2024-10-05
Codeshare flight, operated by Virgin Australia.(VA 519)
Dim 10:20 Sydney (SYD) 2 11:40 Gold Coast (OOL) 1
Qatar Airways QR 6327 Non-stop Boeing 737-800 (73H) 1:20 Operates only on 2025-04-06
Codeshare flight, operated by Virgin Australia.(VA 515)
Lun 10:20 Sydney (SYD) 2 11:40 Gold Coast (OOL) 1
Qatar Airways QR 6329 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-09-16 through 2024-09-23
Codeshare flight, operated by Virgin Australia.(VA 515)
Dim 10:20 Sydney (SYD) 2 10:40 Gold Coast (OOL) 1
Qatar Airways QR 6343 Non-stop Boeing 737-800 (73H) 1:20 Operates only on 2024-10-27
Codeshare flight, operated by Virgin Australia.(VA 515)
Ven 09:20 Sydney (SYD) 2 09:40 Gold Coast (OOL) 1
Qatar Airways QR 6363 Non-stop Boeing 737-800 (73H) 1:20 Operates only on 2025-04-04
Codeshare flight, operated by Virgin Australia.(VA 511)
Sam 10:20 Sydney (SYD) 2 10:40 Gold Coast (OOL) 1
Qatar Airways QR 6367 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-10-12 through 2024-10-26
Codeshare flight, operated by Virgin Australia.(VA 515)
Sam 16:20 Sydney (SYD) 2 16:40 Gold Coast (OOL) 1
Qatar Airways QR 6371 Non-stop Boeing 737-800 (73H) 1:20 Operates only on 2024-10-12
Codeshare flight, operated by Virgin Australia.(VA 531)
Sam 07:20 Sydney (SYD) 2 07:40 Gold Coast (OOL) 1
Qatar Airways QR 6373 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-11-23 through 2024-11-30
Codeshare flight, operated by Virgin Australia.(VA 505)
Mar-Dim 08:20 Sydney (SYD) 2 09:40 Gold Coast (OOL) 1
Qatar Airways QR 6373 Non-stop Boeing 737-800 (73H) 1:20 Valid until 2024-09-01
Codeshare flight, operated by Virgin Australia.(VA 509)
Mar,Mer 08:20 Sydney (SYD) 2 09:40 Gold Coast (OOL) 1
Qatar Airways QR 6373 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Effective 2024-09-03 through 2024-09-04
Codeshare flight, operated by Virgin Australia.(VA 509)
Jeu-Dim 08:20 Sydney (SYD) 2 09:40 Gold Coast (OOL) 1
Qatar Airways QR 6373 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-09-05 through 2024-09-08
Codeshare flight, operated by Virgin Australia.(VA 509)
Ven-Dim 08:20 Sydney (SYD) 2 09:40 Gold Coast (OOL) 1
Qatar Airways QR 6373 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-09-13 through 2024-10-05
Codeshare flight, operated by Virgin Australia.(VA 509)
Tous les jours 08:20 Sydney (SYD) 2 08:40 Gold Coast (OOL) 1
Qatar Airways QR 6373 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-10-06 through 2024-11-22
Codeshare flight, operated by Virgin Australia.(VA 509)
Lun-Ven,Dim 08:20 Sydney (SYD) 2 08:40 Gold Coast (OOL) 1
Qatar Airways QR 6373 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-11-24 through 2024-12-06
Codeshare flight, operated by Virgin Australia.(VA 509)
Tous les jours 08:20 Sydney (SYD) 2 08:40 Gold Coast (OOL) 1
Qatar Airways QR 6373 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-12-07 through 2025-04-05
Codeshare flight, operated by Virgin Australia.(VA 509)
Lun,Mer,Jeu,Sam,Dim 08:20 Sydney (SYD) 2 09:40 Gold Coast (OOL) 1
Qatar Airways QR 6373 Non-stop Boeing 737-800 (73H) 1:20 Effective from 2025-04-06
Codeshare flight, operated by Virgin Australia.(VA 509)
Mar-Jeu 19:50 Sydney (SYD) 2 21:10 Gold Coast (OOL) 1
Qatar Airways QR 6373 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-09-10 through 2024-10-03
Codeshare flight, operated by Virgin Australia.(VA 543)
Sam 14:20 Sydney (SYD) 2 15:40 Gold Coast (OOL) 1
Qatar Airways QR 6375 Non-stop Boeing 737-800 (73H) 1:20 Effective 2025-04-12 through 2025-04-19
Codeshare flight, operated by Virgin Australia.(VA 525)
Sam 14:20 Sydney (SYD) 2 15:40 Gold Coast (OOL) 1
Qatar Airways QR 6375 Non-stop Boeing 737-800 (73H) 1:20 Effective from 2025-05-03
Codeshare flight, operated by Virgin Australia.(VA 525)
Ven,Dim 19:50 Sydney (SYD) 2 21:10 Gold Coast (OOL) 1
Qatar Airways QR 6375 Non-stop Boeing 737-800 (73H) 1:20 Valid until 2024-09-08
Codeshare flight, operated by Virgin Australia.(VA 543)
Lun,Ven,Dim 19:50 Sydney (SYD) 2 21:10 Gold Coast (OOL) 1
Qatar Airways QR 6375 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-09-09 through 2024-10-04
Codeshare flight, operated by Virgin Australia.(VA 543)
Lun,Jeu,Ven,Dim 19:50 Sydney (SYD) 2 21:10 Gold Coast (OOL) 1
Qatar Airways QR 6375 Non-stop Boeing 737-800 (73H) 1:20 Effective from 2025-04-06
Codeshare flight, operated by Virgin Australia.(VA 543)
Dim 20:20 Sydney (SYD) 2 20:40 Gold Coast (OOL) 1
Qatar Airways QR 6375 Non-stop Boeing 737-800 (73H) 1:20 Operates only on 2024-10-27
Codeshare flight, operated by Virgin Australia.(VA 545)
1 2 3   next


Qatar Airways vols de Sydney (SYD) à Gold Coast (OOL).
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs en partage de code:

10:20

10:40
Effective 2024-10-10 through 2024-10-24
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 515)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

16:20

16:40
Effective 2025-02-01 through 2025-03-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 533)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

17:20

17:40
Effective 2025-02-01 through 2025-03-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 537)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

11:20

11:40
Operates only on 2024-10-09
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 517)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

16:20

16:40
Operates only on 2024-10-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 531)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

10:20

11:40
Operates only on 2024-09-13
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 515)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

10:20

11:40
Operates only on 2024-09-02
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 515)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

13:50

14:10
Operates only on 2025-04-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 525)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

06:10

06:30
Effective 2024-10-07 through 2024-10-26
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
Dim
Codeshare flight, operated by Virgin Australia. (VA 501)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

06:40

07:00
Effective 2024-11-23 through 2024-11-30
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 501)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

06:45

07:05
Effective 2024-10-28 through 2025-01-27
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 505)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

06:45

07:05
Effective 2025-01-30 through 2025-03-28
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 505)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

07:10

08:30
Valid until 2024-10-05
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 505)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

07:10

08:30
Effective from 2025-04-07
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 505)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

07:20

07:40
Effective 2024-11-02 through 2024-11-16
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 505)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

07:20

07:40
Effective 2024-12-07 through 2024-12-21
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 505)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

07:20

07:40
Effective 2024-12-22 through 2025-02-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
Codeshare flight, operated by Virgin Australia. (VA 505)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

07:20

07:40
Effective 2025-02-08 through 2025-03-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 505)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

07:20

07:40
Effective 2025-03-31 through 2025-04-05
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 505)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

09:20

10:40
Valid until 2024-09-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 511)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

09:20

09:40
Effective 2024-10-06 through 2024-10-10
Lun
-
Mar
Mer
Jeu
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 511)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

09:20

09:40
Effective 2024-10-15 through 2024-10-24
Lun
-
Mar
Mer
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 511)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

09:20

09:40
Operates only on 2025-03-30
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 511)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

09:20

10:40
Effective from 2025-04-06
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 511)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

18:20

18:40
Effective 2025-03-29 through 2025-04-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 541)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

09:20

10:40
Effective from 2025-04-11
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 511)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

09:20

10:40
Effective 2024-09-13 through 2024-10-04
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 511)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

12:20

13:40
Valid until 2024-10-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 519)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

10:20

11:40
Operates only on 2025-04-06
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 515)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

10:20

11:40
Effective 2024-09-16 through 2024-09-23
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 515)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

10:20

10:40
Operates only on 2024-10-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 515)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

09:20

09:40
Operates only on 2025-04-04
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 511)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

10:20

10:40
Effective 2024-10-12 through 2024-10-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 515)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

16:20

16:40
Operates only on 2024-10-12
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 531)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

07:20

07:40
Effective 2024-11-23 through 2024-11-30
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 505)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

08:20

09:40
Valid until 2024-09-01
Lun
-
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Virgin Australia. (VA 509)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

08:20

09:40
Effective 2024-09-03 through 2024-09-04
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 509)
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

08:20

09:40
Effective 2024-09-05 through 2024-09-08
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Virgin Australia. (VA 509)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

08:20

09:40
Effective 2024-09-13 through 2024-10-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
Dim
Codeshare flight, operated by Virgin Australia. (VA 509)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

08:20

08:40
Effective 2024-10-06 through 2024-11-22
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Virgin Australia. (VA 509)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

08:20

08:40
Effective 2024-11-24 through 2024-12-06
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 509)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

08:20

08:40
Effective 2024-12-07 through 2025-04-05
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Virgin Australia. (VA 509)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

08:20

09:40
Effective from 2025-04-06
Lun
Mar
-
Mer
Jeu
Ven
-
Sam
Dim
Codeshare flight, operated by Virgin Australia. (VA 509)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

19:50

21:10
Effective 2024-09-10 through 2024-10-03
Lun
-
Mar
Mer
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 543)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

14:20

15:40
Effective 2025-04-12 through 2025-04-19
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 525)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

14:20

15:40
Effective from 2025-05-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 525)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

19:50

21:10
Valid until 2024-09-08
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 543)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

19:50

21:10
Effective 2024-09-09 through 2024-10-04
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 543)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

19:50

21:10
Effective from 2025-04-06
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 543)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

20:20

20:40
Operates only on 2024-10-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 545)
Duration: 1:20, non-stop
Boeing 737-800 (73H)
Page 1 / 3        next
  • Il s'agit d'une ligne intérieure au départ de l'aéroport de Sydney (SYD) et à destination de l'aéroport de Gold Coast (OOL).
  • La distance est de 680 km.
  • Le fuseau horaire de l'aéroport de départ et de l'aéroport d'arrivée est UTC+10 . Dans les deux aéroports, il est actuellement (loading...).
  • Pour les vols directs, le temps de vol est de 1:20.