HORAIRES DES VOLS |
---|
Vols directs en partage de code: |
Tous les jours
18:50
Dallas/Ft. Worth (DFW)
20:27
Reno (RNO) Qatar Airways QR 2467 Non-stop Boeing 737-800 (738) 3:37 Effective from 2024-10-27 Codeshare flight, operated by American Airlines.(AA 1273) |
Tous les jours
22:25
Dallas/Ft. Worth (DFW)
23:49
Reno (RNO) Qatar Airways QR 2467 Non-stop Boeing 737-800 (738) 3:24 Effective 2024-04-04 through 2024-10-26 Codeshare flight, operated by American Airlines.(AA 1273) |
Lun-Mer,Dim
12:19
Dallas/Ft. Worth (DFW)
13:58
Reno (RNO) Qatar Airways QR 2468 Non-stop Boeing 737-800 (738) 3:39 Effective 2024-03-31 through 2024-04-03 Codeshare flight, operated by American Airlines.(AA 2354) |
Tous les jours
12:20
Dallas/Ft. Worth (DFW)
13:42
Reno (RNO) Qatar Airways QR 2468 Non-stop Boeing 737-800 (738) 3:22 Effective 2024-04-04 through 2024-10-26 Codeshare flight, operated by American Airlines.(AA 1923) |
Tous les jours
12:19
Dallas/Ft. Worth (DFW)
13:57
Reno (RNO) Qatar Airways QR 2638 Non-stop Boeing 737-800 (738) 3:38 Valid until 2024-02-14 Codeshare flight, operated by American Airlines.(AA 2354) |
Tous les jours
12:19
Dallas/Ft. Worth (DFW)
14:01
Reno (RNO) Qatar Airways QR 2638 Non-stop Boeing 737-800 (738) 3:42 Effective 2024-02-15 through 2024-03-09 Codeshare flight, operated by American Airlines.(AA 2354) |
Tous les jours
12:19
Dallas/Ft. Worth (DFW)
13:58
Reno (RNO) Qatar Airways QR 2638 Non-stop Boeing 737-800 (738) 3:39 Effective 2024-03-10 through 2024-03-30 Codeshare flight, operated by American Airlines.(AA 2354) |
Tous les jours
12:19
Dallas/Ft. Worth (DFW)
13:55
Reno (RNO) Qatar Airways QR 2638 Non-stop Boeing 737-800 (738) 3:36 Effective from 2024-10-27 Codeshare flight, operated by American Airlines.(AA 2354) |
Sam
19:08
Dallas/Ft. Worth (DFW)
20:49
Reno (RNO) Qatar Airways QR 7894 Non-stop Boeing 737-800 (738) 3:41 Effective 2024-01-13 through 2024-02-10 Codeshare flight, operated by American Airlines.(AA 1273) |
Lun-Ven,Dim
19:40
Dallas/Ft. Worth (DFW)
21:18
Reno (RNO) Qatar Airways QR 7894 Non-stop Boeing 737-800 (738) 3:38 Effective 2024-01-08 through 2024-02-14 Codeshare flight, operated by American Airlines.(AA 1273) |
Lun-Ven,Dim
19:45
Dallas/Ft. Worth (DFW)
21:23
Reno (RNO) Qatar Airways QR 7894 Non-stop Boeing 737-800 (738) 3:38 Valid until 2024-01-07 Codeshare flight, operated by American Airlines.(AA 1273) |
Sam
20:18
Dallas/Ft. Worth (DFW)
21:56
Reno (RNO) Qatar Airways QR 7894 Non-stop Boeing 737-800 (738) 3:38 Valid until 2024-01-06 Codeshare flight, operated by American Airlines.(AA 1273) |
Dim
18:50
Dallas/Ft. Worth (DFW)
20:31
Reno (RNO) Qatar Airways QR 9581 Non-stop Boeing 737-800 (738) 3:41 Effective 2024-03-17 through 2024-03-24 Codeshare flight, operated by American Airlines.(AA 2922) |
Lun-Ven,Dim
19:49
Dallas/Ft. Worth (DFW)
21:31
Reno (RNO) Qatar Airways QR 9581 Non-stop Boeing 737-800 (738) 3:42 Effective 2024-02-15 through 2024-03-08 Codeshare flight, operated by American Airlines.(AA 2922) |
Lun-Ven,Dim
19:49
Dallas/Ft. Worth (DFW)
21:27
Reno (RNO) Qatar Airways QR 9581 Non-stop Boeing 737-800 (738) 3:38 Effective 2024-03-10 through 2024-03-15 Codeshare flight, operated by American Airlines.(AA 2922) |
Lun-Ven
19:49
Dallas/Ft. Worth (DFW)
21:27
Reno (RNO) Qatar Airways QR 9581 Non-stop Boeing 737-800 (738) 3:38 Effective 2024-03-18 through 2024-03-29 Codeshare flight, operated by American Airlines.(AA 2922) |
Lun-Mer,Dim
19:49
Dallas/Ft. Worth (DFW)
21:27
Reno (RNO) Qatar Airways QR 9581 Non-stop Boeing 737-800 (738) 3:38 Effective 2024-03-31 through 2024-04-03 Codeshare flight, operated by American Airlines.(AA 2922) |
Sam
20:40
Dallas/Ft. Worth (DFW)
22:24
Reno (RNO) Qatar Airways QR 9581 Non-stop Boeing 737-800 (738) 3:44 Operates only on 2024-03-02 Codeshare flight, operated by American Airlines.(AA 2922) |
Sam
20:42
Dallas/Ft. Worth (DFW)
22:26
Reno (RNO) Qatar Airways QR 9581 Non-stop Boeing 737-800 (738) 3:44 Operates only on 2024-03-09 Codeshare flight, operated by American Airlines.(AA 2922) |
Sam
20:42
Dallas/Ft. Worth (DFW)
22:22
Reno (RNO) Qatar Airways QR 9581 Non-stop Boeing 737-800 (738) 3:40 Effective 2024-03-16 through 2024-03-30 Codeshare flight, operated by American Airlines.(AA 2922) |
Sam
21:00
Dallas/Ft. Worth (DFW)
22:44
Reno (RNO) Qatar Airways QR 9581 Non-stop Boeing 737-800 (738) 3:44 Effective 2024-02-17 through 2024-02-24 Codeshare flight, operated by American Airlines.(AA 2922) |