EgyptAir vols de Sharm el-Sheikh (SSH) à Cairo (CAI).

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Tous les jours 05:00 Sharm el-Sheikh (SSH) 2 06:00 Cairo (CAI) 3
EgyptAir MS 21 Non-stop Boeing 737-800 (738) 1:00 Effective 2026-03-29 through 2026-04-23
Tous les jours 05:40 Sharm el-Sheikh (SSH) 2 06:40 Cairo (CAI) 3
EgyptAir MS 21 Non-stop Boeing 737-800 (738) 1:00 Valid until 2026-03-28
Tous les jours 05:40 Sharm el-Sheikh (SSH) 2 06:40 Cairo (CAI) 3
EgyptAir MS 21 Non-stop Boeing 737-800 (738) 1:00 Effective from 2026-10-30
Tous les jours 06:00 Sharm el-Sheikh (SSH) 2 07:00 Cairo (CAI) 3
EgyptAir MS 21 Non-stop Boeing 737-800 (738) 1:00 Effective 2026-04-24 through 2026-10-24
Lun-Jeu 06:40 Sharm el-Sheikh (SSH) 2 07:40 Cairo (CAI) 3
EgyptAir MS 21 Non-stop Boeing 737-800 (738) 1:00 Effective 2026-10-26 through 2026-10-29
Sam 07:45 Sharm el-Sheikh (SSH) 2 08:45 Cairo (CAI) 3
EgyptAir MS 23 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2026-01-10
Lun,Sam 07:55 Sharm el-Sheikh (SSH) 2 08:55 Cairo (CAI) 3
EgyptAir MS 23 Non-stop Boeing 737-800 (738) 1:00 Valid until 2026-01-03
Ven 07:55 Sharm el-Sheikh (SSH) 2 08:55 Cairo (CAI) 3
EgyptAir MS 23 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2026-01-09
Lun,Ven,Dim 08:00 Sharm el-Sheikh (SSH) 2 09:00 Cairo (CAI) 3
EgyptAir MS 23 Non-stop Boeing 737-800 (738) 1:00 Effective 2026-01-02 through 2026-01-05
Lun,Ven-Dim 08:00 Sharm el-Sheikh (SSH) 2 09:00 Cairo (CAI) 3
EgyptAir MS 23 Non-stop Boeing 737-800 (738) 1:00 Effective 2026-01-11 through 2026-03-28
Lun,Ven-Dim 08:00 Sharm el-Sheikh (SSH) 2 09:05 Cairo (CAI) 3
EgyptAir MS 23 Non-stop Boeing 737-800 (738) 1:05 Effective from 2026-10-30
Mer 08:40 Sharm el-Sheikh (SSH) 2 09:40 Cairo (CAI) 3
EgyptAir MS 23 Non-stop Boeing 737-800 (738) 1:00 Valid until 2026-03-25
Jeu 08:45 Sharm el-Sheikh (SSH) 2 09:45 Cairo (CAI) 3
EgyptAir MS 23 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2026-01-08
Mar,Jeu 08:55 Sharm el-Sheikh (SSH) 2 09:55 Cairo (CAI) 3
EgyptAir MS 23 Non-stop Boeing 737-800 (738) 1:00 Valid until 2026-01-06
Mar,Jeu 08:55 Sharm el-Sheikh (SSH) 2 09:55 Cairo (CAI) 3
EgyptAir MS 23 Non-stop Boeing 737-800 (738) 1:00 Effective 2026-01-13 through 2026-03-26
Lun,Dim 09:00 Sharm el-Sheikh (SSH) 2 10:05 Cairo (CAI) 3
EgyptAir MS 23 Non-stop Boeing 737-800 (738) 1:05 Effective 2026-10-25 through 2026-10-26
Mar-Jeu 09:55 Sharm el-Sheikh (SSH) 2 10:55 Cairo (CAI) 3
EgyptAir MS 23 Non-stop Boeing 737-800 (738) 1:00 Effective 2026-10-27 through 2026-10-29
Tous les jours 07:40 Sharm el-Sheikh (SSH) 2 08:40 Cairo (CAI) 3
EgyptAir MS 25 Non-stop Boeing 737-800 (738) 1:00 Effective 2026-03-29 through 2026-04-23
Tous les jours 08:40 Sharm el-Sheikh (SSH) 2 09:40 Cairo (CAI) 3
EgyptAir MS 25 Non-stop Boeing 737-800 (738) 1:00 Effective 2026-04-24 through 2026-10-24
Mar,Sam 14:25 Sharm el-Sheikh (SSH) 2 15:25 Cairo (CAI) 3
EgyptAir MS 25 Non-stop Boeing 737-800 (738) 1:00 Valid until 2026-03-28
Ven 15:20 Sharm el-Sheikh (SSH) 2 16:20 Cairo (CAI) 3
EgyptAir MS 25 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2026-01-09
Lun,Mer 15:25 Sharm el-Sheikh (SSH) 2 16:25 Cairo (CAI) 3
EgyptAir MS 25 Non-stop Boeing 737-800 (738) 1:00 Effective 2026-01-07 through 2026-01-14
Lun,Mer,Ven 15:25 Sharm el-Sheikh (SSH) 2 16:25 Cairo (CAI) 3
EgyptAir MS 25 Non-stop Boeing 737-800 (738) 1:00 Effective 2026-01-16 through 2026-03-27
Lun,Mer,Ven 15:30 Sharm el-Sheikh (SSH) 2 16:30 Cairo (CAI) 3
EgyptAir MS 25 Non-stop Boeing 737-800 (738) 1:00 Effective from 2026-10-30
Ven 15:35 Sharm el-Sheikh (SSH) 2 16:35 Cairo (CAI) 3
EgyptAir MS 25 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2026-01-02
Lun 15:50 Sharm el-Sheikh (SSH) 2 16:50 Cairo (CAI) 3
EgyptAir MS 25 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2026-01-05
Lun,Mer 16:30 Sharm el-Sheikh (SSH) 2 17:30 Cairo (CAI) 3
EgyptAir MS 25 Non-stop Boeing 737-800 (738) 1:00 Effective 2026-10-26 through 2026-10-28
Mar 16:40 Sharm el-Sheikh (SSH) 2 17:40 Cairo (CAI) 3
EgyptAir MS 25 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2026-10-27
Lun-Jeu,Sam 21:30 Sharm el-Sheikh (SSH) 2 22:30 Cairo (CAI) 3
EgyptAir MS 29 Non-stop Boeing 737-800 (738) 1:00 Valid until 2026-01-08
Sam 21:30 Sharm el-Sheikh (SSH) 2 22:30 Cairo (CAI) 3
EgyptAir MS 29 Non-stop Airbus A320neo (32N) 1:00 Operates only on 2026-01-10
Lun-Jeu,Sam 21:30 Sharm el-Sheikh (SSH) 2 22:30 Cairo (CAI) 3
EgyptAir MS 29 Non-stop Boeing 737-800 (738) 1:00 Effective 2026-01-12 through 2026-03-28
Mar-Dim 21:30 Sharm el-Sheikh (SSH) 2 22:30 Cairo (CAI) 3
EgyptAir MS 29 Non-stop Boeing 737-800 (738) 1:00 Effective 2026-03-29 through 2026-04-23
Lun 21:55 Sharm el-Sheikh (SSH) 2 22:55 Cairo (CAI) 3
EgyptAir MS 29 Non-stop Boeing 737-800 (738) 1:00 Effective 2026-03-30 through 2026-04-20
Ven 22:30 Sharm el-Sheikh (SSH) 2 23:30 Cairo (CAI) 3
EgyptAir MS 29 Non-stop Boeing 737-800 (738) 1:00 Effective 2026-01-02 through 2026-01-16
Ven,Dim 22:30 Sharm el-Sheikh (SSH) 2 23:30 Cairo (CAI) 3
EgyptAir MS 29 Non-stop Boeing 737-800 (738) 1:00 Effective 2026-01-18 through 2026-03-27
Mar-Dim 22:30 Sharm el-Sheikh (SSH) 2 23:30 Cairo (CAI) 3
EgyptAir MS 29 Non-stop Boeing 737-800 (738) 1:00 Effective 2026-04-24 through 2026-10-24
Dim 22:35 Sharm el-Sheikh (SSH) 2 23:35 Cairo (CAI) 3
EgyptAir MS 29 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2026-01-11
Lun-Ven 22:35 Sharm el-Sheikh (SSH) 2 23:40 Cairo (CAI) 3
EgyptAir MS 29 Non-stop Boeing 737-800 (738) 1:05 Effective from 2026-10-26
Dim 22:45 Sharm el-Sheikh (SSH) 2 23:45 Cairo (CAI) 3
EgyptAir MS 29 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2026-01-04
Lun 22:55 Sharm el-Sheikh (SSH) 2 23:55 Cairo (CAI) 3
EgyptAir MS 29 Non-stop Boeing 737-800 (738) 1:00 Effective 2026-04-27 through 2026-10-19
Dim 06:40 Sharm el-Sheikh (SSH) 2 07:40 Cairo (CAI) 3
EgyptAir MS 121 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2026-10-25
Dim 23:35 Sharm el-Sheikh (SSH) 2 00:35 Cairo (CAI) 3
EgyptAir MS 129 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2026-10-25
The flight arrives 1 day after departure.
Lun-Mer 11:40 Sharm el-Sheikh (SSH) 2 12:40 Cairo (CAI) 3
EgyptAir MS 223 Non-stop Boeing 737-800 (738) 1:00 Effective 2026-03-30 through 2026-04-22
This is a Non-scheduled Passenger flight.
Jeu 12:20 Sharm el-Sheikh (SSH) 2 13:20 Cairo (CAI) 3
EgyptAir MS 223 Non-stop Boeing 737-800 (738) 1:00 Effective 2026-04-02 through 2026-04-23
This is a Non-scheduled Passenger flight.
Lun-Mer 12:40 Sharm el-Sheikh (SSH) 2 13:40 Cairo (CAI) 3
EgyptAir MS 223 Non-stop Boeing 737-800 (738) 1:00 Effective 2026-04-27 through 2026-10-21
This is a Non-scheduled Passenger flight.
Jeu 13:20 Sharm el-Sheikh (SSH) 2 14:20 Cairo (CAI) 3
EgyptAir MS 223 Non-stop Boeing 737-800 (738) 1:00 Effective 2026-04-30 through 2026-10-22
This is a Non-scheduled Passenger flight.
Sam 15:30 Sharm el-Sheikh (SSH) 2 16:30 Cairo (CAI) 3
EgyptAir MS 227 Non-stop Boeing 737-800 (738) 1:00 Effective 2026-04-04 through 2026-04-18
This is a Non-scheduled Passenger flight.
Dim 16:25 Sharm el-Sheikh (SSH) 2 17:25 Cairo (CAI) 3
EgyptAir MS 227 Non-stop Boeing 737-800 (738) 1:00 Effective 2026-03-29 through 2026-04-19
This is a Non-scheduled Passenger flight.
Sam 16:30 Sharm el-Sheikh (SSH) 2 17:30 Cairo (CAI) 3
EgyptAir MS 227 Non-stop Boeing 737-800 (738) 1:00 Effective 2026-04-25 through 2026-10-24
This is a Non-scheduled Passenger flight.
Dim 17:25 Sharm el-Sheikh (SSH) 2 18:25 Cairo (CAI) 3
EgyptAir MS 227 Non-stop Boeing 737-800 (738) 1:00 Effective 2026-04-26 through 2026-10-18
This is a Non-scheduled Passenger flight.
1 2   next


EgyptAir vols de Sharm el-Sheikh (SSH) à Cairo (CAI).
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Effective 2026-03-29 through 2026-04-23
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Valid until 2026-03-28
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Effective from 2026-10-30
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Effective 2026-04-24 through 2026-10-24
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Effective 2026-10-26 through 2026-10-29
Lun
Mar
Mer
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Operates only on 2026-01-10
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Valid until 2026-01-03
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Operates only on 2026-01-09
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Effective 2026-01-02 through 2026-01-05
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Effective 2026-01-11 through 2026-03-28
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
Dim
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Effective from 2026-10-30
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
Dim
Duration: 1:05, non-stop
Boeing 737-800 (738)

Vols directs:

Valid until 2026-03-25
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Operates only on 2026-01-08
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Valid until 2026-01-06
Lun
-
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Effective 2026-01-13 through 2026-03-26
Lun
-
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Effective 2026-10-25 through 2026-10-26
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:05, non-stop
Boeing 737-800 (738)

Vols directs:

Effective 2026-10-27 through 2026-10-29
Lun
-
Mar
Mer
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Effective 2026-03-29 through 2026-04-23
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Effective 2026-04-24 through 2026-10-24
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Valid until 2026-03-28
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Operates only on 2026-01-09
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Effective 2026-01-07 through 2026-01-14
Lun
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Effective 2026-01-16 through 2026-03-27
Lun
Mar
-
Mer
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Effective from 2026-10-30
Lun
Mar
-
Mer
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Operates only on 2026-01-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Operates only on 2026-01-05
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Effective 2026-10-26 through 2026-10-28
Lun
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Operates only on 2026-10-27
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Valid until 2026-01-08
Lun
Mar
Mer
Jeu
Ven
-
Sam
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Operates only on 2026-01-10
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:00, non-stop
Airbus A320neo (32N)

Vols directs:

Effective 2026-01-12 through 2026-03-28
Lun
Mar
Mer
Jeu
Ven
-
Sam
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Effective 2026-03-29 through 2026-04-23
Lun
-
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Effective 2026-03-30 through 2026-04-20
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Effective 2026-01-02 through 2026-01-16
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Effective 2026-01-18 through 2026-03-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Effective 2026-04-24 through 2026-10-24
Lun
-
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Operates only on 2026-01-11
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Effective from 2026-10-26
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:05, non-stop
Boeing 737-800 (738)

Vols directs:

Operates only on 2026-01-04
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Effective 2026-04-27 through 2026-10-19
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Operates only on 2026-10-25
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

23:35

00:35(+1)
Operates only on 2026-10-25
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:00, non-stop
Boeing 737-800 (738)
The flight arrives 1 day after departure.

Vols directs:

Effective 2026-03-30 through 2026-04-22
This is a Non-scheduled Passenger flight.
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Effective 2026-04-02 through 2026-04-23
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Effective 2026-04-27 through 2026-10-21
This is a Non-scheduled Passenger flight.
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Effective 2026-04-30 through 2026-10-22
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Effective 2026-04-04 through 2026-04-18
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Effective 2026-03-29 through 2026-04-19
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Effective 2026-04-25 through 2026-10-24
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Effective 2026-04-26 through 2026-10-18
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:00, non-stop
Boeing 737-800 (738)
Page 1 / 2        next
  • Il s'agit d'une ligne intérieure au départ de l'aéroport de Sharm el-Sheikh (SSH) et à destination de l'aéroport de Cairo (CAI).
  • La distance est de 377 km.
  • Le fuseau horaire de l'aéroport de départ et de l'aéroport d'arrivée est UTC+2 . Dans les deux aéroports, il est actuellement (loading...).
  • Pour les vols directs, le temps de vol varie entre 1:00 et 1:05.