| HORAIRES DES VOLS |
|---|
| Vols directs en partage de code: |
| Lun,Mer,Ven,Dim
11:05
Mumbai Chhatrapati Shivaji (BOM) 2
14:00
Addis Ababa (ADD) 2 Air India AI 7566 Non-stop Boeing 787 (787) 5:25 Effective 2026-08-14 through 2026-08-19 Codeshare flight, operated by Ethiopian Airlines.(ET 641) |
| Lun,Mar,Ven
11:05
Mumbai Chhatrapati Shivaji (BOM) 2
14:00
Addis Ababa (ADD) 2 Air India AI 7566 Non-stop Boeing 787-9 (789) 5:25 Effective 2026-08-18 through 2026-08-24 Codeshare flight, operated by Ethiopian Airlines.(ET 641) |
| Mar,Jeu,Sam,Dim
11:05
Mumbai Chhatrapati Shivaji (BOM) 2
14:00
Addis Ababa (ADD) 2 Air India AI 7566 Non-stop Boeing 777-200LR (77L) 5:25 Effective 2026-08-20 through 2026-08-25 Codeshare flight, operated by Ethiopian Airlines.(ET 641) |
| Mer-Dim
11:05
Mumbai Chhatrapati Shivaji (BOM) 2
14:00
Addis Ababa (ADD) 2 Air India AI 7566 Non-stop Boeing 787 (787) 5:25 Effective 2026-08-26 through 2026-08-30 Codeshare flight, operated by Ethiopian Airlines.(ET 641) |
| Lun,Mar,Dim
11:05
Mumbai Chhatrapati Shivaji (BOM) 2
14:00
Addis Ababa (ADD) 2 Air India AI 7566 Non-stop Boeing 777-200LR (77L) 5:25 Effective 2026-08-31 through 2026-09-06 Codeshare flight, operated by Ethiopian Airlines.(ET 641) |
| Mer
11:05
Mumbai Chhatrapati Shivaji (BOM) 2
14:00
Addis Ababa (ADD) 2 Air India AI 7566 Non-stop Boeing 787-9 (789) 5:25 Operates only on 2026-09-02 Codeshare flight, operated by Ethiopian Airlines.(ET 641) |
| Lun-Sam
11:05
Mumbai Chhatrapati Shivaji (BOM) 2
14:00
Addis Ababa (ADD) 2 Air India AI 7566 Non-stop Boeing 777-300ER (77W) 5:25 Effective 2026-09-03 through 2026-09-12 Codeshare flight, operated by Ethiopian Airlines.(ET 641) |
| Lun,Mer-Dim
11:05
Mumbai Chhatrapati Shivaji (BOM) 2
14:00
Addis Ababa (ADD) 2 Air India AI 7566 Non-stop Boeing 777-300ER (77W) 5:25 Effective 2026-09-13 through 2026-09-21 Codeshare flight, operated by Ethiopian Airlines.(ET 641) |
| Mar
11:05
Mumbai Chhatrapati Shivaji (BOM) 2
14:00
Addis Ababa (ADD) 2 Air India AI 7566 Non-stop Boeing 787 (787) 5:25 Operates only on 2026-09-15 Codeshare flight, operated by Ethiopian Airlines.(ET 641) |
| Tous les jours
11:05
Mumbai Chhatrapati Shivaji (BOM) 2
14:00
Addis Ababa (ADD) 2 Air India AI 7566 Non-stop Boeing 777-300ER (77W) 5:25 Effective from 2026-09-22 Codeshare flight, operated by Ethiopian Airlines.(ET 641) |