Southwest Airlines vol WN 4625: Multiple routes

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Mar,Mer 10:05 Boise (BOI) 12:00 Denver (DEN)
WN 4625 Non-stop Boeing 737-700 (Scimitar Winglets) 1:55 Effective 2026-04-07 through 2026-06-03
Sam 11:00 Boise (BOI) 13:00 Denver (DEN)
WN 4625 Non-stop Boeing 737-700 (Scimitar Winglets) 2:00 Effective 2026-04-11 through 2026-05-30
Dim 11:05 Boise (BOI) 13:00 Denver (DEN)
WN 4625 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2026-04-12 through 2026-05-17
Dim 11:05 Boise (BOI) 13:00 Denver (DEN)
WN 4625 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Operates only on 2026-05-31
Dim 11:20 Boise (BOI) 13:15 Denver (DEN)
WN 4625 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Operates only on 2026-05-24
Dim 12:30 Nashville (BNA) 14:10 Kansas City (MCI)
WN 4625 Non-stop Boeing 737 MAX 8 (7M8) 1:40 Effective 2026-06-07 through 2026-08-02
Lun,Jeu-Sam 12:30 Knoxville (TYS) 14:20 Orlando (MCO)
WN 4625 Non-stop Boeing 737-700 (Scimitar Winglets) 1:50 Effective 2026-08-06 through 2026-09-28
Mar,Mer 12:45 Knoxville (TYS) 14:35 Orlando (MCO)
WN 4625 Non-stop Boeing 737-800 (73H) 1:50 Effective 2026-08-04 through 2026-09-30
Dim 13:15 Knoxville (TYS) 15:05 Orlando (MCO)
WN 4625 Non-stop Boeing 737-700 (Scimitar Winglets) 1:50 Effective 2026-08-09 through 2026-09-27
Lun,Jeu,Ven 15:00 Nashville (BNA) 16:40 Kansas City (MCI)
WN 4625 Non-stop Boeing 737 MAX 8 (7M8) 1:40 Effective 2026-06-04 through 2026-08-03
Lun,Jeu,Ven 21:05 Denver (DEN) 22:05 Las Vegas Harry Reid (LAS) 1
WN 4625 Non-stop Boeing 737 MAX 8 (7M8) 2:00 Effective 2026-03-05 through 2026-04-06
Lun,Jeu,Ven 22:45 Las Vegas Harry Reid (LAS) 1 00:20 Sacramento (SMF) B
WN 4625 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2026-03-05 through 2026-04-06
The flight arrives 1 day after departure.
Vols indirects:
Lun,Jeu,Ven 21:05 Denver (DEN) 00:20 Sacramento (SMF) B
WN 4625 1-stop Boeing 737 MAX 8 (7M8) 4:15 Effective 2026-03-05 through 2026-04-06
The flight arrives 1 day after departure.
This flight number is listed as serving the following routes:
Southwest Airlines vol WN 4625: Multiple routes
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Southwest Airlines WN4625
Effective 2026-04-07 through 2026-06-03
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Southwest Airlines WN4625
Effective 2026-04-11 through 2026-05-30
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:00, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Southwest Airlines WN4625
Effective 2026-04-12 through 2026-05-17
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Southwest Airlines WN4625
Operates only on 2026-05-31
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Southwest Airlines WN4625
Operates only on 2026-05-24
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Southwest Airlines WN4625
Effective 2026-06-07 through 2026-08-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:40, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Southwest Airlines WN4625
Effective 2026-08-06 through 2026-09-28
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
Dim
-
Duration: 1:50, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Southwest Airlines WN4625
Effective 2026-08-04 through 2026-09-30
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:50, non-stop
Boeing 737-800 (73H)

Vols directs:

Southwest Airlines WN4625
Effective 2026-08-09 through 2026-09-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:50, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Southwest Airlines WN4625
Effective 2026-06-04 through 2026-08-03
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:40, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Southwest Airlines WN4625
Effective 2026-03-05 through 2026-04-06
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 2:00, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Southwest Airlines WN4625
Effective 2026-03-05 through 2026-04-06
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)
The flight arrives 1 day after departure.

Vols indirects:

Southwest Airlines WN4625
21:05

00:20(+1)
Effective 2026-03-05 through 2026-04-06
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 4:15, 1-stop
Boeing 737 MAX 8 (7M8)
The flight arrives 1 day after departure.
This flight number is listed as serving the following routes:
  • Boise (BOI) - Denver (DEN)
  • Denver (DEN) - Las Vegas Harry Reid (LAS)
  • Denver (DEN) - Sacramento (SMF)
  • Knoxville (TYS) - Orlando (MCO)
  • Las Vegas Harry Reid (LAS) - Sacramento (SMF)
  • Nashville (BNA) - Kansas City (MCI)