Southwest Airlines vol WN 4551: Multiple routes

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Lun,Jeu,Ven 07:45 Chicago Midway (MDW) 10:45 Tucson (TUS)
WN 4551 Non-stop Boeing 737-800 (73H) 4:00 Effective 2026-02-12 through 2026-02-16
Jeu,Ven,Dim 07:45 Chicago Midway (MDW) 10:45 Tucson (TUS)
WN 4551 Non-stop Boeing 737-800 (73H) 4:00 Effective 2026-02-20 through 2026-03-01
Jeu,Ven,Dim 07:55 Chicago Midway (MDW) 10:55 Tucson (TUS)
WN 4551 Non-stop Boeing 737-700 (Scimitar Winglets) 4:00 Effective 2026-01-11 through 2026-01-16
Lun,Dim 07:55 Chicago Midway (MDW) 10:55 Tucson (TUS)
WN 4551 Non-stop Boeing 737-700 (Scimitar Winglets) 4:00 Effective 2026-01-19 through 2026-01-25
Jeu,Ven,Dim 07:55 Chicago Midway (MDW) 10:55 Tucson (TUS)
WN 4551 Non-stop Boeing 737-700 (Scimitar Winglets) 4:00 Effective 2026-02-01 through 2026-02-06
Lun,Dim 07:55 Chicago Midway (MDW) 10:55 Tucson (TUS)
WN 4551 Non-stop Boeing 737-700 (Scimitar Winglets) 4:00 Effective 2026-02-09 through 2026-02-15
Lun,Mar,Jeu 07:55 Chicago Midway (MDW) 10:55 Tucson (TUS)
WN 4551 Non-stop Boeing 737-700 (Scimitar Winglets) 4:00 Effective 2026-02-17 through 2026-02-23
Lun 07:55 Chicago Midway (MDW) 10:55 Tucson (TUS)
WN 4551 Non-stop Boeing 737-700 (Scimitar Winglets) 4:00 Operates only on 2026-03-02
Dim 08:00 San Jose (SJC) B 10:50 Salt Lake City (SLC)
WN 4551 Non-stop Boeing 737-700 (Scimitar Winglets) 1:50 Operates only on 2026-05-24
Lun-Ven 08:15 Chicago Midway (MDW) 11:15 Tucson (TUS)
WN 4551 Non-stop Boeing 737 MAX 8 (7M8) 4:00 Effective 2026-01-06 through 2026-01-14
Mar-Ven,Dim 08:15 Chicago Midway (MDW) 11:15 Tucson (TUS)
WN 4551 Non-stop Boeing 737 MAX 8 (7M8) 4:00 Effective 2026-01-18 through 2026-01-23
Lun-Ven 08:15 Chicago Midway (MDW) 11:15 Tucson (TUS)
WN 4551 Non-stop Boeing 737 MAX 8 (7M8) 4:00 Effective 2026-01-26 through 2026-02-04
Dim 08:15 Chicago Midway (MDW) 11:15 Tucson (TUS)
WN 4551 Non-stop Boeing 737-700 (Scimitar Winglets) 4:00 Operates only on 2026-02-08
Mar,Mer 08:15 Chicago Midway (MDW) 11:15 Tucson (TUS)
WN 4551 Non-stop Boeing 737 MAX 8 (7M8) 4:00 Effective 2026-02-10 through 2026-02-11
Mar,Mer 08:15 Chicago Midway (MDW) 11:15 Tucson (TUS)
WN 4551 Non-stop Boeing 737 MAX 8 (7M8) 4:00 Effective 2026-02-18 through 2026-03-04
Sam 09:20 Chicago Midway (MDW) 12:15 Tucson (TUS)
WN 4551 Non-stop Boeing 737-800 (73H) 3:55 Effective 2026-02-14 through 2026-02-28
Lun,Jeu,Ven,Dim 09:50 Tampa (TPA) 12:10 Ronald Reagan Washington (DCA) 1
WN 4551 Non-stop Boeing 737-700 (Scimitar Winglets) 2:20 Effective 2026-04-09 through 2026-05-22
Lun,Jeu,Ven,Dim 09:50 Tampa (TPA) 12:10 Ronald Reagan Washington (DCA) 1
WN 4551 Non-stop Boeing 737-700 (Scimitar Winglets) 2:20 Effective 2026-05-25 through 2026-06-01
Mar,Mer 09:55 Tampa (TPA) 12:15 Ronald Reagan Washington (DCA) 1
WN 4551 Non-stop Boeing 737-700 (Scimitar Winglets) 2:20 Effective 2026-04-07 through 2026-06-03
Sam 10:05 Tampa (TPA) 12:25 Ronald Reagan Washington (DCA) 1
WN 4551 Non-stop Boeing 737-700 (Scimitar Winglets) 2:20 Effective 2026-04-11 through 2026-05-30
Dim 10:20 Memphis (MEM) 11:40 Dallas Love Field (DAL) 1
WN 4551 Non-stop Boeing 737-700 (Scimitar Winglets) 1:20 Effective 2026-08-09 through 2026-09-27
Lun,Mar,Ven,Dim 12:05 Pensacola (PNS) 13:50 Houston Hobby (HOU)
WN 4551 Non-stop Boeing 737-800 (73H) 1:45 Valid until 2026-01-04
Lun,Jeu,Ven 18:45 Phoenix Sky Harbor (PHX) 4 21:00 El Paso (ELP)
WN 4551 Non-stop Boeing 737 MAX 8 (7M8) 1:15 Effective 2026-06-04 through 2026-08-03
Sam 19:30 Chicago Midway (MDW) 22:25 Tucson (TUS)
WN 4551 Non-stop Boeing 737 MAX 8 (7M8) 3:55 Effective 2026-01-10 through 2026-02-07
This flight number is listed as serving the following routes:
Southwest Airlines vol WN 4551: Multiple routes
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Southwest Airlines WN4551
Effective 2026-02-12 through 2026-02-16
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 4:00, non-stop
Boeing 737-800 (73H)

Vols directs:

Southwest Airlines WN4551
Effective 2026-02-20 through 2026-03-01
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 4:00, non-stop
Boeing 737-800 (73H)

Vols directs:

Southwest Airlines WN4551
Effective 2026-01-11 through 2026-01-16
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 4:00, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Southwest Airlines WN4551
Effective 2026-01-19 through 2026-01-25
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 4:00, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Southwest Airlines WN4551
Effective 2026-02-01 through 2026-02-06
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 4:00, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Southwest Airlines WN4551
Effective 2026-02-09 through 2026-02-15
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 4:00, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Southwest Airlines WN4551
Effective 2026-02-17 through 2026-02-23
Lun
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 4:00, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Southwest Airlines WN4551
Operates only on 2026-03-02
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 4:00, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Southwest Airlines WN4551
Operates only on 2026-05-24
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:50, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Southwest Airlines WN4551
Effective 2026-01-06 through 2026-01-14
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 4:00, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Southwest Airlines WN4551
Effective 2026-01-18 through 2026-01-23
Lun
-
Mar
Mer
Jeu
Ven
Sam
-
Dim
Duration: 4:00, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Southwest Airlines WN4551
Effective 2026-01-26 through 2026-02-04
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 4:00, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Southwest Airlines WN4551
Operates only on 2026-02-08
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 4:00, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Southwest Airlines WN4551
Effective 2026-02-10 through 2026-02-11
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 4:00, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Southwest Airlines WN4551
Effective 2026-02-18 through 2026-03-04
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 4:00, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Southwest Airlines WN4551
Effective 2026-02-14 through 2026-02-28
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 3:55, non-stop
Boeing 737-800 (73H)

Vols directs:

Southwest Airlines WN4551
Effective 2026-04-09 through 2026-05-22
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:20, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Southwest Airlines WN4551
Effective 2026-05-25 through 2026-06-01
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:20, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Southwest Airlines WN4551
Effective 2026-04-07 through 2026-06-03
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:20, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Southwest Airlines WN4551
Effective 2026-04-11 through 2026-05-30
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:20, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Southwest Airlines WN4551
Effective 2026-08-09 through 2026-09-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Southwest Airlines WN4551
Valid until 2026-01-04
Lun
Mar
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 1:45, non-stop
Boeing 737-800 (73H)

Vols directs:

Southwest Airlines WN4551
Effective 2026-06-04 through 2026-08-03
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:15, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Southwest Airlines WN4551
Effective 2026-01-10 through 2026-02-07
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 3:55, non-stop
Boeing 737 MAX 8 (7M8)
This flight number is listed as serving the following routes:
  • Chicago Midway (MDW) - Tucson (TUS)
  • Memphis (MEM) - Dallas Love Field (DAL)
  • Pensacola (PNS) - Houston Hobby (HOU)
  • Phoenix Sky Harbor (PHX) - El Paso (ELP)
  • San Jose (SJC) - Salt Lake City (SLC)
  • Tampa (TPA) - Ronald Reagan Washington (DCA)