Southwest Airlines vol WN 4472: Multiple routes

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Dim 08:20 Sacramento (SMF) B 09:50 San Diego (SAN) 1
WN 4472 Non-stop Boeing 737-800 (73H) 1:30 Effective 2026-04-12 through 2026-05-17
Dim 08:20 Sacramento (SMF) B 09:50 San Diego (SAN) 1
WN 4472 Non-stop Boeing 737-800 (73H) 1:30 Operates only on 2026-05-31
Dim 09:05 Sacramento (SMF) B 10:40 San Diego (SAN) 1
WN 4472 Non-stop Boeing 737-700 (Scimitar Winglets) 1:35 Operates only on 2026-05-24
Dim 10:30 San Diego (SAN) 1 13:45 Colorado Springs (COS)
WN 4472 Non-stop Boeing 737-800 (73H) 2:15 Effective 2026-04-12 through 2026-05-17
Dim 10:30 San Diego (SAN) 1 13:45 Colorado Springs (COS)
WN 4472 Non-stop Boeing 737-800 (73H) 2:15 Operates only on 2026-05-31
Lun-Ven 10:55 Denver (DEN) 13:50 Minneapolis/Saint Paul (MSP) 2
WN 4472 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2026-01-06 through 2026-01-14
Mar-Ven,Dim 10:55 Denver (DEN) 13:50 Minneapolis/Saint Paul (MSP) 2
WN 4472 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2026-01-18 through 2026-01-23
Lun-Ven 10:55 Denver (DEN) 13:50 Minneapolis/Saint Paul (MSP) 2
WN 4472 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2026-01-26 through 2026-02-04
Mar,Mer,Dim 10:55 Denver (DEN) 13:50 Minneapolis/Saint Paul (MSP) 2
WN 4472 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2026-02-08 through 2026-02-11
Mar,Mer 10:55 Denver (DEN) 13:50 Minneapolis/Saint Paul (MSP) 2
WN 4472 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2026-02-18 through 2026-03-04
Lun,Jeu,Ven 11:35 Hartford (BDL) 13:00 Nashville (BNA)
WN 4472 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2026-06-04 through 2026-08-03
Sam 12:45 Hartford (BDL) 14:15 Nashville (BNA)
WN 4472 Non-stop Boeing 737-800 (73H) 2:30 Effective 2026-06-06 through 2026-08-01
Mar,Mer 12:55 Hartford (BDL) 14:25 Nashville (BNA)
WN 4472 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2026-06-09 through 2026-07-29
Lun,Jeu,Ven 13:20 Denver (DEN) 16:15 Minneapolis/Saint Paul (MSP) 2
WN 4472 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2026-02-12 through 2026-02-16
Jeu,Ven,Dim 13:20 Denver (DEN) 16:15 Minneapolis/Saint Paul (MSP) 2
WN 4472 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2026-02-20 through 2026-03-01
Lun,Jeu,Ven 13:30 Saint Louis (STL) 2 15:10 Las Vegas Harry Reid (LAS) 1
WN 4472 Non-stop Boeing 737 MAX 8 (7M8) 3:40 Effective 2026-04-09 through 2026-06-01
Mar,Mer 14:30 Saint Louis (STL) 2 16:05 Las Vegas Harry Reid (LAS) 1
WN 4472 Non-stop Boeing 737-800 (73H) 3:35 Effective 2026-04-07 through 2026-06-03
Sam 14:35 San Diego (SAN) 1 16:15 Sacramento (SMF) B
WN 4472 Non-stop Boeing 737-700 (Scimitar Winglets) 1:40 Effective 2026-08-08 through 2026-09-26
Jeu,Ven,Dim 14:40 Denver (DEN) 17:35 Minneapolis/Saint Paul (MSP) 2
WN 4472 Non-stop Boeing 737-800 (73H) 1:55 Effective 2026-01-11 through 2026-01-16
Lun,Dim 14:40 Denver (DEN) 17:35 Minneapolis/Saint Paul (MSP) 2
WN 4472 Non-stop Boeing 737-800 (73H) 1:55 Effective 2026-01-19 through 2026-01-25
Jeu,Ven,Dim 14:40 Denver (DEN) 17:35 Minneapolis/Saint Paul (MSP) 2
WN 4472 Non-stop Boeing 737-800 (73H) 1:55 Effective 2026-02-01 through 2026-02-06
Lun,Dim 14:40 Denver (DEN) 17:35 Minneapolis/Saint Paul (MSP) 2
WN 4472 Non-stop Boeing 737-800 (73H) 1:55 Effective 2026-02-09 through 2026-02-15
Lun,Mar,Jeu 14:40 Denver (DEN) 17:35 Minneapolis/Saint Paul (MSP) 2
WN 4472 Non-stop Boeing 737-800 (73H) 1:55 Effective 2026-02-17 through 2026-02-23
Lun 14:40 Denver (DEN) 17:35 Minneapolis/Saint Paul (MSP) 2
WN 4472 Non-stop Boeing 737-800 (73H) 1:55 Operates only on 2026-03-02
Lun,Jeu,Ven 14:40 San Diego (SAN) 1 16:20 Sacramento (SMF) B
WN 4472 Non-stop Boeing 737-700 (Scimitar Winglets) 1:40 Effective 2026-08-06 through 2026-09-28
Sam 14:45 Denver (DEN) 17:40 Minneapolis/Saint Paul (MSP) 2
WN 4472 Non-stop Boeing 737-700 (Scimitar Winglets) 1:55 Effective 2026-01-10 through 2026-02-07
Mar,Mer 15:30 San Diego (SAN) 1 17:05 Sacramento (SMF) B
WN 4472 Non-stop Boeing 737-800 (73H) 1:35 Effective 2026-08-04 through 2026-09-30
Sam 22:00 Las Vegas Harry Reid (LAS) 1 00:10 Phoenix Sky Harbor (PHX) 4
WN 4472 Non-stop Boeing 737-800 (73H) 1:10 Valid until 2026-01-03
The flight arrives 1 day after departure.
Jeu,Ven 23:05 Sacramento (SMF) B 05:05 Nashville (BNA)
WN 4472 Non-stop Boeing 737-800 (73H) 4:00 Effective 2026-03-05 through 2026-03-06
The flight arrives 1 day after departure.
Tous les jours 23:05 Sacramento (SMF) B 05:05 Nashville (BNA)
WN 4472 Non-stop Boeing 737-800 (73H) 4:00 Effective 2026-03-08 through 2026-04-06
The flight arrives 1 day after departure.
Vols indirects:
Dim 08:20 Sacramento (SMF) B 13:45 Colorado Springs (COS)
WN 4472 1-stop Boeing 737-800 (73H) 4:25 Effective 2026-04-12 through 2026-05-17
Dim 08:20 Sacramento (SMF) B 13:45 Colorado Springs (COS)
WN 4472 1-stop Boeing 737-800 (73H) 4:25 Operates only on 2026-05-31
This flight number is listed as serving the following routes:
Southwest Airlines vol WN 4472: Multiple routes
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Southwest Airlines WN4472
Effective 2026-04-12 through 2026-05-17
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Vols directs:

Southwest Airlines WN4472
Operates only on 2026-05-31
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Vols directs:

Southwest Airlines WN4472
Operates only on 2026-05-24
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:35, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Southwest Airlines WN4472
Effective 2026-04-12 through 2026-05-17
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:15, non-stop
Boeing 737-800 (73H)

Vols directs:

Southwest Airlines WN4472
Operates only on 2026-05-31
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:15, non-stop
Boeing 737-800 (73H)

Vols directs:

Southwest Airlines WN4472
Effective 2026-01-06 through 2026-01-14
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Southwest Airlines WN4472
Effective 2026-01-18 through 2026-01-23
Lun
-
Mar
Mer
Jeu
Ven
Sam
-
Dim
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Southwest Airlines WN4472
Effective 2026-01-26 through 2026-02-04
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Southwest Airlines WN4472
Effective 2026-02-08 through 2026-02-11
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Southwest Airlines WN4472
Effective 2026-02-18 through 2026-03-04
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Southwest Airlines WN4472
Effective 2026-06-04 through 2026-08-03
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Southwest Airlines WN4472
Effective 2026-06-06 through 2026-08-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:30, non-stop
Boeing 737-800 (73H)

Vols directs:

Southwest Airlines WN4472
Effective 2026-06-09 through 2026-07-29
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Southwest Airlines WN4472
Effective 2026-02-12 through 2026-02-16
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Southwest Airlines WN4472
Effective 2026-02-20 through 2026-03-01
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Southwest Airlines WN4472
Effective 2026-04-09 through 2026-06-01
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 3:40, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Southwest Airlines WN4472
Effective 2026-04-07 through 2026-06-03
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:35, non-stop
Boeing 737-800 (73H)

Vols directs:

Southwest Airlines WN4472
Effective 2026-08-08 through 2026-09-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:40, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Southwest Airlines WN4472
Effective 2026-01-11 through 2026-01-16
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:55, non-stop
Boeing 737-800 (73H)

Vols directs:

Southwest Airlines WN4472
Effective 2026-01-19 through 2026-01-25
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:55, non-stop
Boeing 737-800 (73H)

Vols directs:

Southwest Airlines WN4472
Effective 2026-02-01 through 2026-02-06
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:55, non-stop
Boeing 737-800 (73H)

Vols directs:

Southwest Airlines WN4472
Effective 2026-02-09 through 2026-02-15
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:55, non-stop
Boeing 737-800 (73H)

Vols directs:

Southwest Airlines WN4472
Effective 2026-02-17 through 2026-02-23
Lun
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737-800 (73H)

Vols directs:

Southwest Airlines WN4472
Operates only on 2026-03-02
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737-800 (73H)

Vols directs:

Southwest Airlines WN4472
Effective 2026-08-06 through 2026-09-28
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:40, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Southwest Airlines WN4472
Effective 2026-01-10 through 2026-02-07
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:55, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Southwest Airlines WN4472
Effective 2026-08-04 through 2026-09-30
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Vols directs:

Southwest Airlines WN4472
Valid until 2026-01-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:10, non-stop
Boeing 737-800 (73H)
The flight arrives 1 day after departure.

Vols directs:

Southwest Airlines WN4472
23:05

05:05(+1)
Effective 2026-03-05 through 2026-03-06
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 4:00, non-stop
Boeing 737-800 (73H)
The flight arrives 1 day after departure.

Vols directs:

Southwest Airlines WN4472
23:05

05:05(+1)
Effective 2026-03-08 through 2026-04-06
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 4:00, non-stop
Boeing 737-800 (73H)
The flight arrives 1 day after departure.

Vols indirects:

Southwest Airlines WN4472
Effective 2026-04-12 through 2026-05-17
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 4:25, 1-stop
Boeing 737-800 (73H)

Vols indirects:

Southwest Airlines WN4472
Operates only on 2026-05-31
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 4:25, 1-stop
Boeing 737-800 (73H)
This flight number is listed as serving the following routes:
  • Denver (DEN) - Minneapolis/Saint Paul (MSP)
  • Hartford (BDL) - Nashville (BNA)
  • Las Vegas Harry Reid (LAS) - Phoenix Sky Harbor (PHX)
  • Sacramento (SMF) - Colorado Springs (COS)
  • Sacramento (SMF) - Nashville (BNA)
  • Sacramento (SMF) - San Diego (SAN)
  • Saint Louis (STL) - Las Vegas Harry Reid (LAS)
  • San Diego (SAN) - Colorado Springs (COS)