Southwest Airlines vol WN 4384: Multiple routes

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Sam 07:00 Sacramento (SMF) B 12:40 Saint Louis (STL) 2
WN 4384 Non-stop Boeing 737-700 (Scimitar Winglets) 3:40 Effective 2026-04-11 through 2026-05-30
Lun,Mar,Ven,Dim 08:30 San Diego (SAN) 1 10:55 Tucson (TUS)
WN 4384 Non-stop Boeing 737-800 (73H) 1:25 Valid until 2026-01-04
Sam 08:30 San Diego (SAN) 1 10:55 Tucson (TUS)
WN 4384 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Operates only on 2026-01-03
Dim 09:25 Dallas Love Field (DAL) 1 10:40 Midland (MAF)
WN 4384 Non-stop Boeing 737-700 (Scimitar Winglets) 1:15 Effective 2026-08-09 through 2026-09-27
Sam 09:55 Hayden (HDN) 11:10 Denver (DEN)
WN 4384 Non-stop Boeing 737-800 (73H) 1:15 Effective 2026-01-10 through 2026-02-07
Sam 10:15 Denver (DEN) 15:45 Jacksonville (JAX)
WN 4384 Non-stop Boeing 737 MAX 8 (7M8) 3:30 Effective 2026-06-06 through 2026-08-01
Mar,Mer 10:15 Dallas Love Field (DAL) 1 11:30 Midland (MAF)
WN 4384 Non-stop Boeing 737-700 (Scimitar Winglets) 1:15 Effective 2026-08-04 through 2026-09-30
Dim 11:00 Denver (DEN) 16:15 Jacksonville (JAX)
WN 4384 Non-stop Boeing 737-800 (73H) 3:15 Effective 2026-06-07 through 2026-08-02
Lun,Jeu,Ven 11:20 Hayden (HDN) 12:40 Denver (DEN)
WN 4384 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Effective 2026-02-12 through 2026-02-16
Jeu,Ven,Dim 11:20 Hayden (HDN) 12:40 Denver (DEN)
WN 4384 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Effective 2026-02-20 through 2026-03-01
Jeu,Ven,Dim 12:15 Hayden (HDN) 13:25 Denver (DEN)
WN 4384 Non-stop Boeing 737-800 (73H) 1:10 Effective 2026-01-11 through 2026-01-16
Lun,Dim 12:15 Hayden (HDN) 13:25 Denver (DEN)
WN 4384 Non-stop Boeing 737-800 (73H) 1:10 Effective 2026-01-19 through 2026-01-25
Jeu,Ven,Dim 12:15 Hayden (HDN) 13:25 Denver (DEN)
WN 4384 Non-stop Boeing 737-800 (73H) 1:10 Effective 2026-02-01 through 2026-02-06
Lun,Dim 12:15 Hayden (HDN) 13:25 Denver (DEN)
WN 4384 Non-stop Boeing 737-800 (73H) 1:10 Effective 2026-02-09 through 2026-02-15
Lun,Mar,Jeu 12:15 Hayden (HDN) 13:25 Denver (DEN)
WN 4384 Non-stop Boeing 737-800 (73H) 1:10 Effective 2026-02-17 through 2026-02-23
Lun 12:15 Hayden (HDN) 13:25 Denver (DEN)
WN 4384 Non-stop Boeing 737-800 (73H) 1:10 Operates only on 2026-03-02
Mar,Mer 12:20 Sacramento (SMF) B 18:00 Saint Louis (STL) 2
WN 4384 Non-stop Boeing 737 MAX 8 (7M8) 3:40 Effective 2026-04-07 through 2026-06-03
Lun-Ven 12:25 Hayden (HDN) 13:40 Denver (DEN)
WN 4384 Non-stop Boeing 737-800 (73H) 1:15 Effective 2026-01-06 through 2026-01-14
Mar-Ven,Dim 12:25 Hayden (HDN) 13:40 Denver (DEN)
WN 4384 Non-stop Boeing 737-800 (73H) 1:15 Effective 2026-01-18 through 2026-01-23
Lun-Ven 12:25 Hayden (HDN) 13:40 Denver (DEN)
WN 4384 Non-stop Boeing 737-800 (73H) 1:15 Effective 2026-01-26 through 2026-02-04
Mar,Mer,Sam,Dim 12:25 Hayden (HDN) 13:40 Denver (DEN)
WN 4384 Non-stop Boeing 737-800 (73H) 1:15 Effective 2026-02-08 through 2026-02-14
Mar,Mer,Sam 12:25 Hayden (HDN) 13:40 Denver (DEN)
WN 4384 Non-stop Boeing 737-800 (73H) 1:15 Effective 2026-02-18 through 2026-03-04
Mar,Mer 12:50 Denver (DEN) 18:05 Jacksonville (JAX)
WN 4384 Non-stop Boeing 737 MAX 8 (7M8) 3:15 Effective 2026-06-09 through 2026-07-29
Lun,Jeu,Ven 13:10 Sacramento (SMF) B 18:50 Saint Louis (STL) 2
WN 4384 Non-stop Boeing 737 MAX 8 (7M8) 3:40 Effective 2026-04-09 through 2026-06-01
Dim 13:15 Sacramento (SMF) B 18:55 Saint Louis (STL) 2
WN 4384 Non-stop Boeing 737 MAX 8 (7M8) 3:40 Effective 2026-04-12 through 2026-05-17
Dim 13:15 Sacramento (SMF) B 18:55 Saint Louis (STL) 2
WN 4384 Non-stop Boeing 737 MAX 8 (7M8) 3:40 Operates only on 2026-05-31
Lun,Jeu,Ven 13:30 Denver (DEN) 18:50 Jacksonville (JAX)
WN 4384 Non-stop Boeing 737-800 (73H) 3:20 Effective 2026-06-04 through 2026-08-03
Mar,Mer 16:55 Tampa (TPA) 19:25 San Diego (SAN) 1
WN 4384 Non-stop Boeing 737 MAX 8 (7M8) 5:30 Effective 2026-03-10 through 2026-04-01
Dim 17:50 Tampa (TPA) 20:20 San Diego (SAN) 1
WN 4384 Non-stop Boeing 737-700 (Scimitar Winglets) 5:30 Effective 2026-03-08 through 2026-04-05
Sam 17:55 Tampa (TPA) 20:30 San Diego (SAN) 1
WN 4384 Non-stop Boeing 737-800 (73H) 5:35 Effective 2026-03-07 through 2026-04-04
This flight number is listed as serving the following routes:
Southwest Airlines vol WN 4384: Multiple routes
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Southwest Airlines WN4384
Effective 2026-04-11 through 2026-05-30
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 3:40, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Southwest Airlines WN4384
Valid until 2026-01-04
Lun
Mar
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Vols directs:

Southwest Airlines WN4384
Operates only on 2026-01-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Southwest Airlines WN4384
Effective 2026-08-09 through 2026-09-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:15, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Southwest Airlines WN4384
Effective 2026-01-10 through 2026-02-07
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:15, non-stop
Boeing 737-800 (73H)

Vols directs:

Southwest Airlines WN4384
Effective 2026-06-06 through 2026-08-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 3:30, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Southwest Airlines WN4384
Effective 2026-08-04 through 2026-09-30
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:15, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Southwest Airlines WN4384
Effective 2026-06-07 through 2026-08-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:15, non-stop
Boeing 737-800 (73H)

Vols directs:

Southwest Airlines WN4384
Effective 2026-02-12 through 2026-02-16
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Southwest Airlines WN4384
Effective 2026-02-20 through 2026-03-01
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Southwest Airlines WN4384
Effective 2026-01-11 through 2026-01-16
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Vols directs:

Southwest Airlines WN4384
Effective 2026-01-19 through 2026-01-25
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Vols directs:

Southwest Airlines WN4384
Effective 2026-02-01 through 2026-02-06
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Vols directs:

Southwest Airlines WN4384
Effective 2026-02-09 through 2026-02-15
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Vols directs:

Southwest Airlines WN4384
Effective 2026-02-17 through 2026-02-23
Lun
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Vols directs:

Southwest Airlines WN4384
Operates only on 2026-03-02
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Vols directs:

Southwest Airlines WN4384
Effective 2026-04-07 through 2026-06-03
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:40, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Southwest Airlines WN4384
Effective 2026-01-06 through 2026-01-14
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:15, non-stop
Boeing 737-800 (73H)

Vols directs:

Southwest Airlines WN4384
Effective 2026-01-18 through 2026-01-23
Lun
-
Mar
Mer
Jeu
Ven
Sam
-
Dim
Duration: 1:15, non-stop
Boeing 737-800 (73H)

Vols directs:

Southwest Airlines WN4384
Effective 2026-01-26 through 2026-02-04
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:15, non-stop
Boeing 737-800 (73H)

Vols directs:

Southwest Airlines WN4384
Effective 2026-02-08 through 2026-02-14
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
Dim
Duration: 1:15, non-stop
Boeing 737-800 (73H)

Vols directs:

Southwest Airlines WN4384
Effective 2026-02-18 through 2026-03-04
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:15, non-stop
Boeing 737-800 (73H)

Vols directs:

Southwest Airlines WN4384
Effective 2026-06-09 through 2026-07-29
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:15, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Southwest Airlines WN4384
Effective 2026-04-09 through 2026-06-01
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 3:40, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Southwest Airlines WN4384
Effective 2026-04-12 through 2026-05-17
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:40, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Southwest Airlines WN4384
Operates only on 2026-05-31
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:40, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Southwest Airlines WN4384
Effective 2026-06-04 through 2026-08-03
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 3:20, non-stop
Boeing 737-800 (73H)

Vols directs:

Southwest Airlines WN4384
Effective 2026-03-10 through 2026-04-01
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 5:30, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Southwest Airlines WN4384
Effective 2026-03-08 through 2026-04-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 5:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Southwest Airlines WN4384
Effective 2026-03-07 through 2026-04-04
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 5:35, non-stop
Boeing 737-800 (73H)
This flight number is listed as serving the following routes:
  • Dallas Love Field (DAL) - Midland (MAF)
  • Denver (DEN) - Jacksonville (JAX)
  • Hayden (HDN) - Denver (DEN)
  • Sacramento (SMF) - Saint Louis (STL)
  • San Diego (SAN) - Tucson (TUS)
  • Tampa (TPA) - San Diego (SAN)