Southwest Airlines vol WN 4347: Multiple routes

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Lun,Jeu,Ven 05:20 Denver (DEN) 08:35 Milwaukee (MKE)
WN 4347 Non-stop Boeing 737 MAX 8 (7M8) 2:15 Effective 2024-06-06 through 2024-07-01
Lun,Jeu,Ven 05:20 Denver (DEN) 08:35 Milwaukee (MKE)
WN 4347 Non-stop Boeing 737 MAX 8 (7M8) 2:15 Effective 2024-07-08 through 2024-08-02
Jeu 06:00 Denver (DEN) 09:20 Milwaukee (MKE)
WN 4347 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Operates only on 2024-07-04
Dim 06:50 Long Beach (LGB) 08:15 San Jose (SJC) B
WN 4347 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Operates only on 2024-05-26
Lun,Jeu,Ven 07:10 Long Beach (LGB) 08:25 San Jose (SJC) B
WN 4347 Non-stop Boeing 737 MAX 8 (7M8) 1:15 Effective 2024-04-11 through 2024-06-03
Sam,Dim 07:15 Long Beach (LGB) 08:30 San Jose (SJC) B
WN 4347 Non-stop Boeing 737 MAX 8 (7M8) 1:15 Effective 2024-04-13 through 2024-05-25
Sam,Dim 07:15 Long Beach (LGB) 08:30 San Jose (SJC) B
WN 4347 Non-stop Boeing 737 MAX 8 (7M8) 1:15 Effective 2024-06-01 through 2024-06-02
Sam 07:20 Denver (DEN) 10:35 Milwaukee (MKE)
WN 4347 Non-stop Boeing 737-700 (73W) 2:15 Effective 2024-06-08 through 2024-08-03
Dim 07:35 Denver (DEN) 10:45 Milwaukee (MKE)
WN 4347 Non-stop Boeing 737-800 (73H) 2:10 Effective 2024-06-09 through 2024-08-04
Mar,Mer 07:45 Denver (DEN) 11:00 Milwaukee (MKE)
WN 4347 Non-stop Boeing 737-700 (73W) 2:15 Effective 2024-06-04 through 2024-07-31
Mar,Mer 07:55 Long Beach (LGB) 09:05 San Jose (SJC) B
WN 4347 Non-stop Boeing 737-700 (73W) 1:10 Effective 2024-04-09 through 2024-05-29
Lun,Jeu,Ven 10:00 Sky Harbor, Phoenix (PHX) 4 14:05 Minneapolis/Saint Paul (MSP) 2
WN 4347 Non-stop Boeing 737 MAX 8 (7M8) 3:05 Effective 2024-01-08 through 2024-03-04
Sam 11:10 Milwaukee (MKE) 15:00 Orlando (MCO)
WN 4347 Non-stop Boeing 737-700 (73W) 2:50 Effective 2024-06-08 through 2024-08-03
Dim 12:30 Sacramento (SMF) B 13:55 Portland (PDX)
WN 4347 Non-stop Boeing 737-700 (73W) 1:25 Operates only on 2024-09-01
Dim 14:20 Portland (PDX) 17:50 Denver (DEN)
WN 4347 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2024-08-11 through 2024-08-25
Dim 14:20 Portland (PDX) 17:50 Denver (DEN)
WN 4347 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2024-09-08 through 2024-09-29
Dim 14:30 Portland (PDX) 17:55 Denver (DEN)
WN 4347 Non-stop Boeing 737-700 (73W) 2:25 Operates only on 2024-09-01
Mar,Mer 15:15 Portland (PDX) 18:45 Denver (DEN)
WN 4347 Non-stop Boeing 737-700 (73W) 2:30 Effective 2024-08-06 through 2024-10-02
Sam 16:10 Milwaukee (MKE) 19:50 Orlando (MCO)
WN 4347 Non-stop Boeing 737-700 (73W) 2:40 Effective 2024-03-09 through 2024-04-06
Dim 18:35 Denver (DEN) 21:30 Minneapolis/Saint Paul (MSP) 2
WN 4347 Non-stop Boeing 737-700 (73W) 1:55 Operates only on 2024-09-01
Vols indirects:
Sam 07:20 Denver (DEN) 15:00 Orlando (MCO)
WN 4347 1-stop Boeing 737-700 (73W) 5:40 Effective 2024-06-08 through 2024-08-03
Dim 12:30 Sacramento (SMF) B 17:55 Denver (DEN)
WN 4347 1-stop Boeing 737-700 (73W) 4:25 Operates only on 2024-09-01
Dim 14:30 Portland (PDX) 21:30 Minneapolis/Saint Paul (MSP) 2
WN 4347 1-stop Boeing 737-700 (73W) 5:00 Operates only on 2024-09-01
Dim 12:30 Sacramento (SMF) B 21:30 Minneapolis/Saint Paul (MSP) 2
WN 4347 2-stop Boeing 737-700 (73W) 7:00 Operates only on 2024-09-01
This flight number is listed as serving the following routes:
Southwest Airlines vol WN 4347: Multiple routes
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Southwest Airlines WN4347
Effective 2024-06-06 through 2024-07-01
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 2:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4347
Effective 2024-07-08 through 2024-08-02
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 2:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4347
Operates only on 2024-07-04
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4347
Operates only on 2024-05-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4347
Effective 2024-04-11 through 2024-06-03
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4347
Effective 2024-04-13 through 2024-05-25
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
Duration: 1:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4347
Effective 2024-06-01 through 2024-06-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
Duration: 1:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4347
Effective 2024-06-08 through 2024-08-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4347
Effective 2024-06-09 through 2024-08-04
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN4347
Effective 2024-06-04 through 2024-07-31
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4347
Effective 2024-04-09 through 2024-05-29
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4347
Effective 2024-01-08 through 2024-03-04
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 3:05, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4347
Effective 2024-06-08 through 2024-08-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4347
Operates only on 2024-09-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4347
Effective 2024-08-11 through 2024-08-25
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4347
Effective 2024-09-08 through 2024-09-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4347
Operates only on 2024-09-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4347
Effective 2024-08-06 through 2024-10-02
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4347
Effective 2024-03-09 through 2024-04-06
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4347
Operates only on 2024-09-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Vols indirects:

Southwest Airlines WN4347
Effective 2024-06-08 through 2024-08-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 5:40, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN4347
Operates only on 2024-09-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 4:25, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN4347
Operates only on 2024-09-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 5:00, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN4347
Operates only on 2024-09-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 7:00, 2-stop
Boeing 737-700 (73W)
This flight number is listed as serving the following routes:
  • Denver (DEN) - Milwaukee (MKE)
  • Denver (DEN) - Minneapolis/Saint Paul (MSP)
  • Denver (DEN) - Orlando (MCO)
  • Long Beach (LGB) - San Jose (SJC)
  • Milwaukee (MKE) - Orlando (MCO)
  • Portland (PDX) - Denver (DEN)
  • Portland (PDX) - Minneapolis/Saint Paul (MSP)
  • Sacramento (SMF) - Denver (DEN)
  • Sacramento (SMF) - Minneapolis/Saint Paul (MSP)
  • Sacramento (SMF) - Portland (PDX)
  • Sky Harbor, Phoenix (PHX) - Minneapolis/Saint Paul (MSP)