Southwest Airlines vol WN 360: Multiple routes

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Lun,Jeu,Ven 05:25 Houston Hobby (HOU) 07:00 Los Angeles (LAX) 1
WN 360 Non-stop Boeing 737-700 (73W) 3:35 Valid until 2025-06-02
Mar,Mer 06:35 Houston Hobby (HOU) 08:10 Los Angeles (LAX) 1
WN 360 Non-stop Boeing 737 MAX 8 (7M8) 3:35 Valid until 2025-06-04
Sam 06:40 Tucson (TUS) 11:50 Midway, Chicago (MDW)
WN 360 Non-stop Boeing 737 MAX 8 (7M8) 3:10 Valid until 2025-05-31
Dim 07:00 Tucson (TUS) 12:10 Midway, Chicago (MDW)
WN 360 Non-stop Boeing 737-700 (73W) 3:10 Valid until 2025-05-18
Dim 07:00 Tucson (TUS) 12:10 Midway, Chicago (MDW)
WN 360 Non-stop Boeing 737-700 (73W) 3:10 Operates only on 2025-06-01
Lun,Jeu,Ven 07:35 Los Angeles (LAX) 1 08:50 Las Vegas Harry Reid (LAS) 1
WN 360 Non-stop Boeing 737-700 (73W) 1:15 Valid until 2025-06-02
Dim 09:25 Tucson (TUS) 14:35 Midway, Chicago (MDW)
WN 360 Non-stop Boeing 737-700 (73W) 3:10 Operates only on 2025-05-25
Sam 12:20 Austin (AUS) 15:30 Atlanta (ATL) N
WN 360 Non-stop Boeing 737 MAX 8 (7M8) 2:10 Effective 2025-11-22 through 2025-11-29
Sam 12:20 Austin (AUS) 15:30 Atlanta (ATL) N
WN 360 Non-stop Boeing 737 MAX 8 (7M8) 2:10 Effective 2025-12-20 through 2026-01-03
Lun-Mer 12:40 Austin (AUS) 15:50 Atlanta (ATL) N
WN 360 Non-stop Boeing 737-700 (Scimitar Winglets) 2:10 Effective 2025-11-25 through 2025-12-01
Lun,Mar,Ven,Dim 12:40 Austin (AUS) 15:50 Atlanta (ATL) N
WN 360 Non-stop Boeing 737-700 (Scimitar Winglets) 2:10 Effective 2025-12-19 through 2026-01-04
Mar,Mer 12:55 New York LaGuardia (LGA) B 15:20 Atlanta (ATL) N
WN 360 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2025-08-05 through 2025-10-01
Lun,Jeu,Ven 12:55 New York LaGuardia (LGA) B 15:20 Atlanta (ATL) N
WN 360 Non-stop Boeing 737-700 (73W) 2:25 Effective 2025-08-07 through 2025-09-29
Mar,Mer 13:10 Denver (DEN) 18:25 Dulles, Washington (IAD)
WN 360 Non-stop Boeing 737-700 (73W) 3:15 Effective 2025-06-10 through 2025-07-30
Mar,Mer 13:10 Las Vegas Harry Reid (LAS) 1 18:10 Houston Hobby (HOU)
WN 360 Non-stop Boeing 737 MAX 8 (7M8) 3:00 Effective 2025-10-07 through 2025-10-29
Jeu 13:25 Austin (AUS) 14:40 Harlingen (HRL)
WN 360 Non-stop Boeing 737-800 (73H) 1:15 Operates only on 2025-11-27
Dim 14:00 New York LaGuardia (LGA) B 16:30 Atlanta (ATL) N
WN 360 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2025-08-10 through 2025-08-24
Dim 14:00 New York LaGuardia (LGA) B 16:30 Atlanta (ATL) N
WN 360 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2025-09-07 through 2025-09-28
Dim 14:10 New York LaGuardia (LGA) B 16:40 Atlanta (ATL) N
WN 360 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Operates only on 2025-08-31
Sam 14:15 New York LaGuardia (LGA) B 16:45 Atlanta (ATL) N
WN 360 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2025-08-09 through 2025-09-27
Mar,Mer 15:10 Reno (RNO) 16:30 Las Vegas Harry Reid (LAS) 1
WN 360 Non-stop Boeing 737-800 (73H) 1:20 Effective 2025-11-04 through 2025-11-12
Lun-Jeu 15:10 Reno (RNO) 16:30 Las Vegas Harry Reid (LAS) 1
WN 360 Non-stop Boeing 737-800 (73H) 1:20 Effective 2025-11-17 through 2025-11-20
Lun-Ven 15:10 Reno (RNO) 16:30 Las Vegas Harry Reid (LAS) 1
WN 360 Non-stop Boeing 737-800 (73H) 1:20 Effective 2025-12-02 through 2025-12-11
Lun-Mer 15:10 Reno (RNO) 16:30 Las Vegas Harry Reid (LAS) 1
WN 360 Non-stop Boeing 737-800 (73H) 1:20 Effective 2025-12-15 through 2025-12-17
Mer,Jeu 15:10 Reno (RNO) 16:30 Las Vegas Harry Reid (LAS) 1
WN 360 Non-stop Boeing 737-800 (73H) 1:20 Effective 2025-12-24 through 2026-01-01
Sam 15:30 Las Vegas Harry Reid (LAS) 1 20:30 Houston Hobby (HOU)
WN 360 Non-stop Boeing 737-800 (73H) 3:00 Effective 2025-10-04 through 2025-11-01
Ven 16:50 Denver (DEN) 22:10 Dulles, Washington (IAD)
WN 360 Non-stop Boeing 737-800 (73H) 3:20 Operates only on 2025-07-04
Lun,Jeu-Sam 18:00 Denver (DEN) 23:30 Dulles, Washington (IAD)
WN 360 Non-stop Boeing 737-800 (73H) 3:30 Effective 2025-06-05 through 2025-07-03
Lun,Jeu-Sam 18:00 Denver (DEN) 23:30 Dulles, Washington (IAD)
WN 360 Non-stop Boeing 737-800 (73H) 3:30 Effective 2025-07-05 through 2025-08-04
Dim 18:50 Denver (DEN) 00:10 Dulles, Washington (IAD)
WN 360 Non-stop Boeing 737-800 (73H) 3:20 Effective 2025-06-08 through 2025-08-03
The flight arrives 1 day after departure.
Dim 20:35 Reno (RNO) 21:50 Las Vegas Harry Reid (LAS) 1
WN 360 Non-stop Boeing 737 MAX 8 (7M8) 1:15 Operates only on 2025-11-30
Dim 20:50 Las Vegas Harry Reid (LAS) 1 01:45 Houston Hobby (HOU)
WN 360 Non-stop Boeing 737 MAX 8 (7M8) 2:55 Effective 2025-10-05 through 2025-10-26
The flight arrives 1 day after departure.
Lun,Jeu,Ven 20:55 Las Vegas Harry Reid (LAS) 1 01:50 Houston Hobby (HOU)
WN 360 Non-stop Boeing 737-800 (73H) 2:55 Effective 2025-10-02 through 2025-10-31
The flight arrives 1 day after departure.
Lun,Jeu,Ven,Dim 21:10 Reno (RNO) 22:25 Las Vegas Harry Reid (LAS) 1
WN 360 Non-stop Boeing 737-700 (Scimitar Winglets) 1:15 Effective 2025-11-02 through 2025-11-16
Lun,Ven,Dim 21:10 Reno (RNO) 22:25 Las Vegas Harry Reid (LAS) 1
WN 360 Non-stop Boeing 737-700 (Scimitar Winglets) 1:15 Effective 2025-11-21 through 2025-11-28
Ven,Dim 21:10 Reno (RNO) 22:25 Las Vegas Harry Reid (LAS) 1
WN 360 Non-stop Boeing 737-700 (Scimitar Winglets) 1:15 Effective 2025-12-07 through 2025-12-14
Jeu 21:10 Reno (RNO) 22:25 Las Vegas Harry Reid (LAS) 1
WN 360 Non-stop Boeing 737-700 (Scimitar Winglets) 1:15 Operates only on 2025-12-18
Lun 21:10 Reno (RNO) 22:25 Las Vegas Harry Reid (LAS) 1
WN 360 Non-stop Boeing 737-700 (Scimitar Winglets) 1:15 Operates only on 2026-01-05
Vols indirects:
Lun,Jeu,Ven 05:25 Houston Hobby (HOU) 08:50 Las Vegas Harry Reid (LAS) 1
WN 360 1-stop Boeing 737-700 (73W) 5:25 Valid until 2025-06-02
This flight number is listed as serving the following routes:
Southwest Airlines vol WN 360: Multiple routes
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Southwest Airlines WN360
Valid until 2025-06-02
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 3:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN360
Valid until 2025-06-04
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN360
Valid until 2025-05-31
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 3:10, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN360
Valid until 2025-05-18
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN360
Operates only on 2025-06-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN360
Valid until 2025-06-02
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN360
Operates only on 2025-05-25
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN360
12:20

15:30
Effective 2025-11-22 through 2025-11-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:10, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN360
12:20

15:30
Effective 2025-12-20 through 2026-01-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:10, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN360
12:40

15:50
Effective 2025-11-25 through 2025-12-01
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:10, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN360
12:40

15:50
Effective 2025-12-19 through 2026-01-04
Lun
Mar
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 2:10, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN360
Effective 2025-08-05 through 2025-10-01
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN360
Effective 2025-08-07 through 2025-09-29
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN360
Effective 2025-06-10 through 2025-07-30
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN360
Effective 2025-10-07 through 2025-10-29
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:00, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN360
Operates only on 2025-11-27
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:15, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN360
Effective 2025-08-10 through 2025-08-24
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN360
Effective 2025-09-07 through 2025-09-28
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN360
Operates only on 2025-08-31
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN360
Effective 2025-08-09 through 2025-09-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN360
Effective 2025-11-04 through 2025-11-12
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN360
Effective 2025-11-17 through 2025-11-20
Lun
Mar
Mer
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN360
Effective 2025-12-02 through 2025-12-11
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN360
Effective 2025-12-15 through 2025-12-17
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN360
Effective 2025-12-24 through 2026-01-01
Lun
-
Mar
-
Mer
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN360
Effective 2025-10-04 through 2025-11-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 3:00, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN360
Operates only on 2025-07-04
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 3:20, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN360
Effective 2025-06-05 through 2025-07-03
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
Dim
-
Duration: 3:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN360
Effective 2025-07-05 through 2025-08-04
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
Dim
-
Duration: 3:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN360
Effective 2025-06-08 through 2025-08-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:20, non-stop
Boeing 737-800 (73H)
The flight arrives 1 day after departure.

Southwest Airlines WN360
Operates only on 2025-11-30
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN360
Effective 2025-10-05 through 2025-10-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:55, non-stop
Boeing 737 MAX 8 (7M8)
The flight arrives 1 day after departure.

Southwest Airlines WN360
Effective 2025-10-02 through 2025-10-31
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 2:55, non-stop
Boeing 737-800 (73H)
The flight arrives 1 day after departure.

Southwest Airlines WN360
Effective 2025-11-02 through 2025-11-16
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:15, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN360
Effective 2025-11-21 through 2025-11-28
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 1:15, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN360
Effective 2025-12-07 through 2025-12-14
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 1:15, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN360
Operates only on 2025-12-18
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:15, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN360
Operates only on 2026-01-05
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:15, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols indirects:

Southwest Airlines WN360
Valid until 2025-06-02
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 5:25, 1-stop
Boeing 737-700 (73W)
This flight number is listed as serving the following routes:
  • Austin (AUS) - Atlanta (ATL)
  • Austin (AUS) - Harlingen (HRL)
  • Denver (DEN) - Dulles, Washington (IAD)
  • Houston Hobby (HOU) - Los Angeles (LAX)
  • Las Vegas Harry Reid (LAS) - Houston Hobby (HOU)
  • Los Angeles (LAX) - Las Vegas Harry Reid (LAS)
  • New York LaGuardia (LGA) - Atlanta (ATL)
  • Reno (RNO) - Las Vegas Harry Reid (LAS)
  • Tucson (TUS) - Midway, Chicago (MDW)