Southwest Airlines vol WN 3269: Multiple routes

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Sam 06:35 Myrtle Beach (MYR) 07:45 Chicago Midway (MDW)
WN 3269 Non-stop Boeing 737-700 (Scimitar Winglets) 2:10 Effective 2026-06-06 through 2026-08-01
Dim 07:40 Tulsa (TUL) 08:20 Phoenix Sky Harbor (PHX) 4
WN 3269 Non-stop Boeing 737-700 (Scimitar Winglets) 2:40 Operates only on 2026-05-24
Sam 08:25 San Diego (SAN) 1 16:10 Orlando (MCO)
WN 3269 Non-stop Boeing 737 MAX 8 (7M8) 4:45 Valid until 2026-01-03
Lun,Mar,Ven,Dim 08:30 San Diego (SAN) 1 16:15 Orlando (MCO)
WN 3269 Non-stop Boeing 737 MAX 8 (7M8) 4:45 Valid until 2026-01-04
Dim 08:55 Phoenix Sky Harbor (PHX) 4 10:25 Los Angeles (LAX) 1
WN 3269 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Operates only on 2026-05-24
Mer,Jeu 11:05 Houston Hobby (HOU) 14:25 Fort Lauderdale (FLL) 1
WN 3269 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Valid until 2026-01-01
Dim 11:05 Los Angeles (LAX) 1 12:30 Sacramento (SMF) B
WN 3269 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Operates only on 2026-05-24
Sam 15:15 Orlando (MCO) 17:05 Chicago Midway (MDW)
WN 3269 Non-stop Boeing 737 MAX 8 (7M8) 2:50 Effective 2026-04-11 through 2026-05-30
Mar,Mer 15:40 Orlando (MCO) 17:30 Chicago Midway (MDW)
WN 3269 Non-stop Boeing 737-700 (Scimitar Winglets) 2:50 Effective 2026-04-07 through 2026-06-03
Dim 15:55 Orlando (MCO) 17:45 Chicago Midway (MDW)
WN 3269 Non-stop Boeing 737 MAX 8 (7M8) 2:50 Effective 2026-04-12 through 2026-05-17
Dim 15:55 Orlando (MCO) 17:45 Chicago Midway (MDW)
WN 3269 Non-stop Boeing 737 MAX 8 (7M8) 2:50 Operates only on 2026-05-31
Jeu,Ven 16:50 El Paso (ELP) 18:15 Phoenix Sky Harbor (PHX) 4
WN 3269 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2026-03-05 through 2026-03-06
Lun,Jeu,Ven 16:50 El Paso (ELP) 17:15 Phoenix Sky Harbor (PHX) 4
WN 3269 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2026-03-09 through 2026-04-06
Dim 16:55 San Jose (SJC) B 18:25 Las Vegas Harry Reid (LAS) 1
WN 3269 Non-stop Boeing 737 MAX 8 (7M8) 1:30 Effective 2026-08-09 through 2026-09-27
Dim 17:45 Phoenix Sky Harbor (PHX) 4 20:30 Denver (DEN)
WN 3269 Non-stop Boeing 737-700 (Scimitar Winglets) 1:45 Effective 2026-03-08 through 2026-04-05
Lun,Jeu,Ven 17:55 Phoenix Sky Harbor (PHX) 4 20:45 Denver (DEN)
WN 3269 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Effective 2026-03-09 through 2026-04-06
Mar,Mer 18:05 Chicago Midway (MDW) 20:15 Detroit (DTW) E
WN 3269 Non-stop Boeing 737-700 (Scimitar Winglets) 1:10 Effective 2026-04-07 through 2026-06-03
Jeu,Ven 18:55 Phoenix Sky Harbor (PHX) 4 20:45 Denver (DEN)
WN 3269 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Effective 2026-03-05 through 2026-03-06
Mar,Mer 19:00 Phoenix Sky Harbor (PHX) 4 21:45 Denver (DEN)
WN 3269 Non-stop Boeing 737-800 (73H) 1:45 Effective 2026-03-10 through 2026-04-01
Sam 19:05 Phoenix Sky Harbor (PHX) 4 21:50 Denver (DEN)
WN 3269 Non-stop Boeing 737-800 (73H) 1:45 Effective 2026-03-14 through 2026-04-04
Lun,Jeu,Ven 19:05 Chicago Midway (MDW) 21:10 Detroit (DTW) E
WN 3269 Non-stop Boeing 737-700 (Scimitar Winglets) 1:05 Effective 2026-04-09 through 2026-06-01
Sam 20:05 Phoenix Sky Harbor (PHX) 4 21:50 Denver (DEN)
WN 3269 Non-stop Boeing 737-800 (73H) 1:45 Operates only on 2026-03-07
Vols indirects:
Dim 07:40 Tulsa (TUL) 10:25 Los Angeles (LAX) 1
WN 3269 1-stop Boeing 737-700 (Scimitar Winglets) 4:45 Operates only on 2026-05-24
Dim 08:55 Phoenix Sky Harbor (PHX) 4 12:30 Sacramento (SMF) B
WN 3269 1-stop Boeing 737-700 (Scimitar Winglets) 3:35 Operates only on 2026-05-24
Mar,Mer 15:40 Orlando (MCO) 20:15 Detroit (DTW) E
WN 3269 1-stop Boeing 737-700 (Scimitar Winglets) 4:35 Effective 2026-04-07 through 2026-06-03
Lun,Jeu,Ven 16:50 El Paso (ELP) 20:45 Denver (DEN)
WN 3269 1-stop Boeing 737 MAX 8 (7M8) 3:55 Effective 2026-03-05 through 2026-04-06
Dim 07:40 Tulsa (TUL) 12:30 Sacramento (SMF) B
WN 3269 2-stop Boeing 737-700 (Scimitar Winglets) 6:50 Operates only on 2026-05-24
This flight number is listed as serving the following routes:
Southwest Airlines vol WN 3269: Multiple routes
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Southwest Airlines WN3269
Effective 2026-06-06 through 2026-08-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:10, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Southwest Airlines WN3269
Operates only on 2026-05-24
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:40, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Southwest Airlines WN3269
Valid until 2026-01-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 4:45, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Southwest Airlines WN3269
Valid until 2026-01-04
Lun
Mar
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 4:45, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Southwest Airlines WN3269
Operates only on 2026-05-24
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Southwest Airlines WN3269
Valid until 2026-01-01
Lun
-
Mar
-
Mer
Jeu
Ven
-
Sam
-
Dim
-
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Southwest Airlines WN3269
Operates only on 2026-05-24
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Southwest Airlines WN3269
Effective 2026-04-11 through 2026-05-30
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:50, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Southwest Airlines WN3269
Effective 2026-04-07 through 2026-06-03
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:50, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Southwest Airlines WN3269
Effective 2026-04-12 through 2026-05-17
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:50, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Southwest Airlines WN3269
Operates only on 2026-05-31
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:50, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Southwest Airlines WN3269
Effective 2026-03-05 through 2026-03-06
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Southwest Airlines WN3269
Effective 2026-03-09 through 2026-04-06
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Southwest Airlines WN3269
Effective 2026-08-09 through 2026-09-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:30, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Southwest Airlines WN3269
Effective 2026-03-08 through 2026-04-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:45, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Southwest Airlines WN3269
Effective 2026-03-09 through 2026-04-06
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Southwest Airlines WN3269
Effective 2026-04-07 through 2026-06-03
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:10, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Southwest Airlines WN3269
Effective 2026-03-05 through 2026-03-06
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Southwest Airlines WN3269
Effective 2026-03-10 through 2026-04-01
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:45, non-stop
Boeing 737-800 (73H)

Vols directs:

Southwest Airlines WN3269
Effective 2026-03-14 through 2026-04-04
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:45, non-stop
Boeing 737-800 (73H)

Vols directs:

Southwest Airlines WN3269
Effective 2026-04-09 through 2026-06-01
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:05, non-stop
Boeing 737-700 (Scimitar Winglets)

Vols directs:

Southwest Airlines WN3269
Operates only on 2026-03-07
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:45, non-stop
Boeing 737-800 (73H)

Vols indirects:

Southwest Airlines WN3269
Operates only on 2026-05-24
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 4:45, 1-stop
Boeing 737-700 (Scimitar Winglets)

Vols indirects:

Southwest Airlines WN3269
Operates only on 2026-05-24
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:35, 1-stop
Boeing 737-700 (Scimitar Winglets)

Vols indirects:

Southwest Airlines WN3269
Effective 2026-04-07 through 2026-06-03
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 4:35, 1-stop
Boeing 737-700 (Scimitar Winglets)

Vols indirects:

Southwest Airlines WN3269
Effective 2026-03-05 through 2026-04-06
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 3:55, 1-stop
Boeing 737 MAX 8 (7M8)

Vols indirects:

Southwest Airlines WN3269
Operates only on 2026-05-24
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 6:50, 2-stop
Boeing 737-700 (Scimitar Winglets)
This flight number is listed as serving the following routes:
  • Chicago Midway (MDW) - Detroit (DTW)
  • El Paso (ELP) - Denver (DEN)
  • El Paso (ELP) - Phoenix Sky Harbor (PHX)
  • Houston Hobby (HOU) - Fort Lauderdale (FLL)
  • Los Angeles (LAX) - Sacramento (SMF)
  • Myrtle Beach (MYR) - Chicago Midway (MDW)
  • Orlando (MCO) - Chicago Midway (MDW)
  • Orlando (MCO) - Detroit (DTW)
  • Phoenix Sky Harbor (PHX) - Denver (DEN)
  • Phoenix Sky Harbor (PHX) - Los Angeles (LAX)
  • Phoenix Sky Harbor (PHX) - Sacramento (SMF)
  • San Diego (SAN) - Orlando (MCO)
  • San Jose (SJC) - Las Vegas Harry Reid (LAS)
  • Tulsa (TUL) - Los Angeles (LAX)
  • Tulsa (TUL) - Phoenix Sky Harbor (PHX)
  • Tulsa (TUL) - Sacramento (SMF)