Qatar Airways vol QR 8406: Doha - Hong Kong via Singapore Changi

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Lun 04:10 Singapore Changi (SIN) 07:50 Hong Kong (HKG)
QR 8406 Non-stop Boeing 747-400 Freighter (74Y) 3:40 Effective 2024-09-02 through 2024-10-21
This is a Scheduled Cargo flight.
Lun 06:10 Singapore Changi (SIN) 09:50 Hong Kong (HKG)
QR 8406 Non-stop Boeing 747-400 Freighter (74Y) 3:40 Effective 2024-10-28 through 2024-12-30
This is a Scheduled Cargo flight.
Dim 13:25 Doha (DOH) 02:10 Singapore Changi (SIN)
QR 8406 Non-stop Boeing 747-400 Freighter (74Y) 7:45 Valid until 2024-10-20
The flight arrives 1 day after departure.
This is a Scheduled Cargo flight.
Dim 15:40 Doha (DOH) 04:10 Singapore Changi (SIN)
QR 8406 Non-stop Boeing 747-400 Freighter (74Y) 7:30 Effective 2024-10-27 through 2024-12-29
The flight arrives 1 day after departure.
This is a Scheduled Cargo flight.
Vols indirects:
Dim 13:25 Doha (DOH) 07:50 Hong Kong (HKG)
QR 8406 1-stop Boeing 747-400 Freighter (74Y) 13:25 Valid until 2024-10-20
The flight arrives 1 day after departure.
This is a Scheduled Cargo flight.
Dim 15:40 Doha (DOH) 09:50 Hong Kong (HKG)
QR 8406 1-stop Boeing 747-400 Freighter (74Y) 13:10 Effective 2024-10-27 through 2024-12-29
The flight arrives 1 day after departure.
This is a Scheduled Cargo flight.
Qatar Airways vol QR 8406:
Doha - Hong Kong via Singapore Changi
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Qatar Airways QR8406
Effective 2024-09-02 through 2024-10-21
This is a Scheduled Cargo flight.
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:40, non-stop
Boeing 747-400 Freighter (74Y)

Qatar Airways QR8406
Effective 2024-10-28 through 2024-12-30
This is a Scheduled Cargo flight.
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:40, non-stop
Boeing 747-400 Freighter (74Y)

Qatar Airways QR8406
Valid until 2024-10-20
This is a Scheduled Cargo flight.
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 7:45, non-stop
Boeing 747-400 Freighter (74Y)
The flight arrives 1 day after departure.

Qatar Airways QR8406
Effective 2024-10-27 through 2024-12-29
This is a Scheduled Cargo flight.
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 7:30, non-stop
Boeing 747-400 Freighter (74Y)
The flight arrives 1 day after departure.

Vols indirects:

Qatar Airways QR8406
13:25

07:50(+1)
Valid until 2024-10-20
This is a Scheduled Cargo flight.
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 13:25, 1-stop
Boeing 747-400 Freighter (74Y)
The flight arrives 1 day after departure.

Qatar Airways QR8406
15:40

09:50(+1)
Effective 2024-10-27 through 2024-12-29
This is a Scheduled Cargo flight.
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 13:10, 1-stop
Boeing 747-400 Freighter (74Y)
The flight arrives 1 day after departure.
  • QR 8406 est un vol international au départ de l'aéroport de Doha, Qatar (DOH) et à destination de l'aéroport de Hong Kong, Hong Kong (HKG).
  • Le vol s'effectue via Singapore Changi (SIN).
  • La distance est de 6286 km.
  • Le fuseau horaire de l'aéroport de départ est UTC+3 , et le fuseau horaire de l'aéroport d'arrivée est UTC+8 . Il est actuellement (loading...) au point de départ et (loading...) au point d'arrivée. Il y a un décalage horaire de (loading...) heure(s) entre les aéroports.