Gol vol G3 1113: Salvador - Sao Paulo-Guarulhos

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Dim 04:15 Salvador (SSA) 06:55 Sao Paulo-Guarulhos (GRU) 2
G3 1113 Non-stop Boeing 737-800 (738) 2:40 Operates only on 2026-01-04
Sam 04:25 Salvador (SSA) 07:05 Sao Paulo-Guarulhos (GRU) 2
G3 1113 Non-stop Boeing 737 MAX 8 (7M8) 2:40 Operates only on 2026-01-03
Dim 04:30 Salvador (SSA) 06:55 Sao Paulo-Guarulhos (GRU) 2
G3 1113 Non-stop Boeing 737-800 (738) 2:25 Operates only on 2026-01-11
Dim 04:30 Salvador (SSA) 06:55 Sao Paulo-Guarulhos (GRU) 2
G3 1113 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Operates only on 2026-01-18
Dim 04:30 Salvador (SSA) 06:55 Sao Paulo-Guarulhos (GRU) 2
G3 1113 Non-stop Boeing 737-800 (738) 2:25 Effective 2026-01-25 through 2026-03-01
Sam 04:40 Salvador (SSA) 07:05 Sao Paulo-Guarulhos (GRU) 2
G3 1113 Non-stop Boeing 737-800 (738) 2:25 Effective 2026-01-10 through 2026-01-17
Sam 04:40 Salvador (SSA) 07:05 Sao Paulo-Guarulhos (GRU) 2
G3 1113 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2026-01-24 through 2026-01-31
Sam 04:45 Salvador (SSA) 07:10 Sao Paulo-Guarulhos (GRU) 2
G3 1113 Non-stop Boeing 737-800 (738) 2:25 Effective 2026-02-07 through 2026-02-28
Ven 05:15 Salvador (SSA) 07:50 Sao Paulo-Guarulhos (GRU) 2
G3 1113 Non-stop Boeing 737-800 (738) 2:35 Operates only on 2026-01-02
Lun 05:15 Salvador (SSA) 07:50 Sao Paulo-Guarulhos (GRU) 2
G3 1113 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Operates only on 2026-01-05
Lun 05:15 Salvador (SSA) 07:50 Sao Paulo-Guarulhos (GRU) 2
G3 1113 Non-stop Boeing 737-800 (738) 2:35 Operates only on 2026-01-12
Lun 05:15 Salvador (SSA) 07:50 Sao Paulo-Guarulhos (GRU) 2
G3 1113 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Effective 2026-01-19 through 2026-01-26
Jeu 05:25 Salvador (SSA) 07:50 Sao Paulo-Guarulhos (GRU) 2
G3 1113 Non-stop Boeing 737-800 (738) 2:25 Operates only on 2026-01-22
Mar 05:35 Salvador (SSA) 08:00 Sao Paulo-Guarulhos (GRU) 2
G3 1113 Non-stop Boeing 737-800 (738) 2:25 Effective 2026-01-06 through 2026-01-13
Mer-Ven 05:35 Salvador (SSA) 08:00 Sao Paulo-Guarulhos (GRU) 2
G3 1113 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2026-01-07 through 2026-01-14
Mar,Jeu,Ven 05:35 Salvador (SSA) 08:00 Sao Paulo-Guarulhos (GRU) 2
G3 1113 Non-stop Boeing 737-800 (738) 2:25 Effective 2026-01-15 through 2026-01-20
Mar,Mer,Ven 05:35 Salvador (SSA) 08:00 Sao Paulo-Guarulhos (GRU) 2
G3 1113 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2026-01-21 through 2026-01-30
Lun-Jeu 05:35 Salvador (SSA) 08:00 Sao Paulo-Guarulhos (GRU) 2
G3 1113 Non-stop Boeing 737-800 (738) 2:25 Effective 2026-01-29 through 2026-02-05
Lun-Ven 05:35 Salvador (SSA) 08:00 Sao Paulo-Guarulhos (GRU) 2
G3 1113 Non-stop Boeing 737-800 (738) 2:25 Effective 2026-02-06 through 2026-02-27
Dim 12:30 Curitiba (CWB) 13:30 Sao Paulo Congonhas (CGH)
G3 1113 Non-stop Boeing 737-800 (738) 1:00 Effective from 2026-03-29
Lun-Ven 13:05 Curitiba (CWB) 14:15 Sao Paulo Congonhas (CGH)
G3 1113 Non-stop Boeing 737-800 (738) 1:10 Effective from 2026-03-30
Gol vol G3 1113:
Salvador - Sao Paulo-Guarulhos
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Gol G31113
Operates only on 2026-01-04
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:40, non-stop
Boeing 737-800 (738)

Vols directs:

Gol G31113
Operates only on 2026-01-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:40, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Gol G31113
Operates only on 2026-01-11
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:25, non-stop
Boeing 737-800 (738)

Vols directs:

Gol G31113
Operates only on 2026-01-18
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Gol G31113
Effective 2026-01-25 through 2026-03-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:25, non-stop
Boeing 737-800 (738)

Vols directs:

Gol G31113
Effective 2026-01-10 through 2026-01-17
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:25, non-stop
Boeing 737-800 (738)

Vols directs:

Gol G31113
Effective 2026-01-24 through 2026-01-31
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Gol G31113
Effective 2026-02-07 through 2026-02-28
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:25, non-stop
Boeing 737-800 (738)

Vols directs:

Gol G31113
Operates only on 2026-01-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:35, non-stop
Boeing 737-800 (738)

Vols directs:

Gol G31113
Operates only on 2026-01-05
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:35, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Gol G31113
Operates only on 2026-01-12
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:35, non-stop
Boeing 737-800 (738)

Vols directs:

Gol G31113
Effective 2026-01-19 through 2026-01-26
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:35, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Gol G31113
Operates only on 2026-01-22
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 2:25, non-stop
Boeing 737-800 (738)

Vols directs:

Gol G31113
Effective 2026-01-06 through 2026-01-13
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:25, non-stop
Boeing 737-800 (738)

Vols directs:

Gol G31113
Effective 2026-01-07 through 2026-01-14
Lun
-
Mar
-
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Gol G31113
Effective 2026-01-15 through 2026-01-20
Lun
-
Mar
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 2:25, non-stop
Boeing 737-800 (738)

Vols directs:

Gol G31113
Effective 2026-01-21 through 2026-01-30
Lun
-
Mar
Mer
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Gol G31113
Effective 2026-01-29 through 2026-02-05
Lun
Mar
Mer
Jeu
Ven
-
Sam
-
Dim
-
Duration: 2:25, non-stop
Boeing 737-800 (738)

Vols directs:

Gol G31113
Effective 2026-02-06 through 2026-02-27
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 2:25, non-stop
Boeing 737-800 (738)

Vols directs:

Gol G31113
Effective from 2026-03-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs:

Gol G31113
Effective from 2026-03-30
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:10, non-stop
Boeing 737-800 (738)
  • G3 1113 est un vol intérieur au départ de l'aéroport de Salvador (SSA) et à destination de l'aéroport de Sao Paulo-Guarulhos (GRU).
  • La distance est de 1451 km.
  • Le fuseau horaire de l'aéroport de départ et de l'aéroport d'arrivée est UTC-3 . Dans les deux aéroports, il est actuellement (loading...).
  • Pour les vols directs, le temps de vol varie entre 1:00 et 2:40.