| HORAIRES DES VOLS |
|---|
| Vols directs en partage de code: |
| Lun,Mer-Ven,Dim
19:30
Doha (DOH)
01:00
Lahore (LHE) M BA 6186 Non-stop Airbus A350-1000 (351) 3:30 Effective 2026-04-30 through 2026-05-07 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Mar,Ven,Sam
19:30
Doha (DOH)
01:00
Lahore (LHE) M BA 6186 Non-stop Boeing 777-300ER (77W) 3:30 Effective 2026-05-02 through 2026-05-12 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Lun,Mer-Ven,Dim
19:30
Doha (DOH)
01:00
Lahore (LHE) M BA 6186 Non-stop Airbus A350-1000 (351) 3:30 Effective 2026-05-10 through 2026-05-21 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Mar,Sam
19:30
Doha (DOH)
01:00
Lahore (LHE) M BA 6186 Non-stop Boeing 777-300ER (77W) 3:30 Effective 2026-05-16 through 2026-05-19 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Mar,Ven-Dim
19:30
Doha (DOH)
01:00
Lahore (LHE) M BA 6186 Non-stop Boeing 787-9 (789) 3:30 Effective 2026-05-22 through 2026-05-26 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Lun,Mer-Ven,Dim
19:30
Doha (DOH)
01:00
Lahore (LHE) M BA 6186 Non-stop Airbus A350-1000 (351) 3:30 Effective 2026-05-25 through 2026-06-11 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Mar,Sam
19:30
Doha (DOH)
01:00
Lahore (LHE) M BA 6186 Non-stop Boeing 777-300ER (77W) 3:30 Effective 2026-05-30 through 2026-06-09 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Ven,Sam
19:30
Doha (DOH)
01:00
Lahore (LHE) M BA 6186 Non-stop Boeing 777-300ER (77W) 3:30 Effective 2026-06-12 through 2026-06-13 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Tous les jours
19:50
Doha (DOH)
01:10
Lahore (LHE) M BA 6186 Non-stop Boeing 777-300ER (77W) 3:20 Valid until 2026-01-08 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Jeu,Ven
19:50
Doha (DOH)
01:10
Lahore (LHE) M BA 6186 Non-stop Airbus A350-900 (359) 3:20 Effective 2026-01-09 through 2026-01-16 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Lun-Mer,Sam
19:50
Doha (DOH)
01:10
Lahore (LHE) M BA 6186 Non-stop Boeing 777-300ER (77W) 3:20 Effective 2026-01-10 through 2026-01-17 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Dim
19:50
Doha (DOH)
01:10
Lahore (LHE) M BA 6186 Non-stop Boeing 787-9 (789) 3:20 Operates only on 2026-01-11 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Mar-Jeu,Dim
19:50
Doha (DOH)
01:10
Lahore (LHE) M BA 6186 Non-stop Boeing 777-300ER (77W) 3:20 Effective 2026-01-18 through 2026-01-25 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Lun
19:50
Doha (DOH)
01:10
Lahore (LHE) M BA 6186 Non-stop Airbus A350-900 (359) 3:20 Operates only on 2026-01-19 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Mar-Sam
19:50
Doha (DOH)
01:10
Lahore (LHE) M BA 6186 Non-stop Airbus A350-1000 (351) 3:20 Effective 2026-01-23 through 2026-01-29 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Lun,Sam
19:50
Doha (DOH)
01:10
Lahore (LHE) M BA 6186 Non-stop Boeing 777-300ER (77W) 3:20 Effective 2026-01-26 through 2026-02-02 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Mer,Ven
19:50
Doha (DOH)
01:10
Lahore (LHE) M BA 6186 Non-stop Boeing 787-9 (789) 3:20 Effective 2026-01-30 through 2026-02-04 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Dim
19:50
Doha (DOH)
01:10
Lahore (LHE) M BA 6186 Non-stop Airbus A350-900 (359) 3:20 Operates only on 2026-02-01 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Lun,Mar,Jeu,Sam,Dim
19:50
Doha (DOH)
01:10
Lahore (LHE) M BA 6186 Non-stop Boeing 777-300ER (77W) 3:20 Effective 2026-02-03 through 2026-02-09 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Mar,Ven
19:50
Doha (DOH)
01:10
Lahore (LHE) M BA 6186 Non-stop Airbus A350-1000 (351) 3:20 Effective 2026-02-06 through 2026-02-13 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Lun-Jeu,Sam,Dim
19:50
Doha (DOH)
01:10
Lahore (LHE) M BA 6186 Non-stop Boeing 777-300ER (77W) 3:20 Effective 2026-02-11 through 2026-02-18 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Mar,Jeu,Ven
19:50
Doha (DOH)
01:10
Lahore (LHE) M BA 6186 Non-stop Airbus A350-1000 (351) 3:20 Effective 2026-02-19 through 2026-02-26 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Lun,Mer,Sam,Dim
19:50
Doha (DOH)
01:10
Lahore (LHE) M BA 6186 Non-stop Boeing 777-300ER (77W) 3:20 Effective 2026-02-21 through 2026-02-28 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Ven,Dim
19:50
Doha (DOH)
01:10
Lahore (LHE) M BA 6186 Non-stop Boeing 787-9 (789) 3:20 Effective 2026-02-27 through 2026-03-01 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Lun-Jeu,Sam,Dim
19:50
Doha (DOH)
01:10
Lahore (LHE) M BA 6186 Non-stop Boeing 777-300ER (77W) 3:20 Effective 2026-03-02 through 2026-03-12 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Ven
19:50
Doha (DOH)
01:10
Lahore (LHE) M BA 6186 Non-stop Airbus A350-1000 (351) 3:20 Operates only on 2026-03-06 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Tous les jours
19:50
Doha (DOH)
01:10
Lahore (LHE) M BA 6186 Non-stop Boeing 777-300ER (77W) 3:20 Effective 2026-03-13 through 2026-03-19 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Mar,Mer,Ven
19:50
Doha (DOH)
01:10
Lahore (LHE) M BA 6186 Non-stop Airbus A350-1000 (351) 3:20 Effective 2026-03-20 through 2026-03-27 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Lun,Sam,Dim
19:50
Doha (DOH)
01:10
Lahore (LHE) M BA 6186 Non-stop Boeing 777-300ER (77W) 3:20 Effective 2026-03-21 through 2026-03-28 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Jeu
19:50
Doha (DOH)
01:10
Lahore (LHE) M BA 6186 Non-stop Airbus A350-900 (359) 3:20 Operates only on 2026-03-26 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Lun,Mer-Dim
19:50
Doha (DOH)
01:00
Lahore (LHE) M BA 6186 Non-stop Airbus A350-1000 (351) 3:10 Effective 2026-04-12 through 2026-04-23 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Mar
19:50
Doha (DOH)
01:00
Lahore (LHE) M BA 6186 Non-stop Boeing 777-300ER (77W) 3:10 Effective 2026-04-14 through 2026-04-21 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Mar,Ven,Sam
19:50
Doha (DOH)
01:00
Lahore (LHE) M BA 6186 Non-stop Boeing 777-300ER (77W) 3:10 Effective 2026-04-24 through 2026-04-28 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Lun,Mer,Dim
19:50
Doha (DOH)
01:00
Lahore (LHE) M BA 6186 Non-stop Airbus A350-1000 (351) 3:10 Effective 2026-04-26 through 2026-04-29 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Tous les jours
19:50
Doha (DOH)
01:10
Lahore (LHE) M BA 6186 Non-stop Boeing 787-9 (789) 3:20 Effective from 2026-10-25 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Lun,Mer,Jeu,Dim
20:00
Doha (DOH)
01:30
Lahore (LHE) M BA 6186 Non-stop Airbus A350-1000 (351) 3:30 Effective 2026-06-14 through 2026-09-03 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Mar,Ven,Sam
20:00
Doha (DOH)
01:30
Lahore (LHE) M BA 6186 Non-stop Boeing 777-300ER (77W) 3:30 Effective 2026-06-16 through 2026-09-04 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Lun,Mer,Jeu,Sam
20:00
Doha (DOH)
01:30
Lahore (LHE) M BA 6186 Non-stop Airbus A350-1000 (351) 3:30 Effective 2026-09-05 through 2026-09-10 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Mar,Ven-Dim
20:00
Doha (DOH)
01:30
Lahore (LHE) M BA 6186 Non-stop Boeing 777-300ER (77W) 3:30 Effective 2026-09-06 through 2026-09-19 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Lun,Mer,Jeu,Dim
20:00
Doha (DOH)
01:30
Lahore (LHE) M BA 6186 Non-stop Airbus A350-1000 (351) 3:30 Effective 2026-09-14 through 2026-09-28 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Mar,Ven,Sam
20:00
Doha (DOH)
01:30
Lahore (LHE) M BA 6186 Non-stop Boeing 777-300ER (77W) 3:30 Effective 2026-09-22 through 2026-09-29 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Lun,Mer,Jeu,Dim
20:10
Doha (DOH)
01:30
Lahore (LHE) M BA 6186 Non-stop Airbus A350-1000 (351) 3:20 Effective 2026-09-30 through 2026-10-15 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Mar,Ven,Sam
20:10
Doha (DOH)
01:30
Lahore (LHE) M BA 6186 Non-stop Boeing 777-300ER (77W) 3:20 Effective 2026-10-02 through 2026-10-17 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Mar,Ven-Dim
20:10
Doha (DOH)
01:30
Lahore (LHE) M BA 6186 Non-stop Boeing 777-300ER (77W) 3:20 Effective 2026-10-18 through 2026-10-24 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Lun,Mer,Jeu
20:10
Doha (DOH)
01:30
Lahore (LHE) M BA 6186 Non-stop Airbus A350-1000 (351) 3:20 Effective 2026-10-19 through 2026-10-22 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Mar,Sam,Dim
20:20
Doha (DOH)
01:30
Lahore (LHE) M BA 6186 Non-stop Boeing 777-300ER (77W) 3:10 Effective 2026-03-29 through 2026-04-04 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Lun,Mer-Ven,Dim
20:20
Doha (DOH)
01:30
Lahore (LHE) M BA 6186 Non-stop Airbus A350-1000 (351) 3:10 Effective 2026-03-30 through 2026-04-06 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Mar,Mer
20:20
Doha (DOH)
01:30
Lahore (LHE) M BA 6186 Non-stop Boeing 777-300ER (77W) 3:10 Effective 2026-04-07 through 2026-04-08 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |
| Jeu-Sam
20:20
Doha (DOH)
01:30
Lahore (LHE) M BA 6186 Non-stop Airbus A350-1000 (351) 3:10 Effective 2026-04-09 through 2026-04-11 Codeshare flight, operated by Qatar Airways.(QR 620) The flight arrives 1 day after departure. |