HORAIRES DES VOLS |
---|
Vols directs: |
Mar,Jeu,Sam
22:30
Ontario, Los Angeles (ONT) 2
05:05
San Salvador (SAL) AV 531 Non-stop Airbus A320neo (32N) 4:35 Effective from 2025-11-04 The flight arrives 1 day after departure. |
Mar,Jeu
23:25
Ontario, Los Angeles (ONT) 2
05:05
San Salvador (SAL) AV 531 Non-stop Airbus A320neo (32N) 4:40 Valid until 2025-05-29 The flight arrives 1 day after departure. |
Sam
23:25
Ontario, Los Angeles (ONT) 2
05:05
San Salvador (SAL) AV 531 Non-stop Airbus A320 (320) 4:40 Valid until 2025-05-31 The flight arrives 1 day after departure. |
Mar,Sam,Dim
23:25
Ontario, Los Angeles (ONT) 2
05:05
San Salvador (SAL) AV 531 Non-stop Airbus A320 (320) 4:40 Effective 2025-06-01 through 2025-06-08 The flight arrives 1 day after departure. |
Mar,Jeu
23:25
Ontario, Los Angeles (ONT) 2
05:05
San Salvador (SAL) AV 531 Non-stop Airbus A320neo (32N) 4:40 Effective 2025-06-05 through 2025-06-12 The flight arrives 1 day after departure. |
Mar,Sam,Dim
23:25
Ontario, Los Angeles (ONT) 2
05:05
San Salvador (SAL) AV 531 Non-stop Airbus A320 (320) 4:40 Effective 2025-06-14 through 2025-07-12 The flight arrives 1 day after departure. |
Jeu
23:25
Ontario, Los Angeles (ONT) 2
05:05
San Salvador (SAL) AV 531 Non-stop Airbus A320neo (32N) 4:40 Effective 2025-06-19 through 2025-07-10 The flight arrives 1 day after departure. |
Jeu,Sam,Dim
23:25
Ontario, Los Angeles (ONT) 2
05:05
San Salvador (SAL) AV 531 Non-stop Airbus A320neo (32N) 4:40 Effective 2025-07-13 through 2025-07-19 The flight arrives 1 day after departure. |
Mar,Dim
23:25
Ontario, Los Angeles (ONT) 2
05:05
San Salvador (SAL) AV 531 Non-stop Airbus A320 (320) 4:40 Effective 2025-07-15 through 2025-07-20 The flight arrives 1 day after departure. |
Mar,Jeu
23:25
Ontario, Los Angeles (ONT) 2
05:05
San Salvador (SAL) AV 531 Non-stop Airbus A320neo (32N) 4:40 Effective 2025-07-22 through 2025-07-24 The flight arrives 1 day after departure. |
Mar,Sam,Dim
23:25
Ontario, Los Angeles (ONT) 2
05:05
San Salvador (SAL) AV 531 Non-stop Airbus A320 (320) 4:40 Effective 2025-07-26 through 2025-08-09 The flight arrives 1 day after departure. |
Jeu
23:25
Ontario, Los Angeles (ONT) 2
05:05
San Salvador (SAL) AV 531 Non-stop Airbus A320neo (32N) 4:40 Effective 2025-07-31 through 2025-08-07 The flight arrives 1 day after departure. |
Jeu,Sam,Dim
23:25
Ontario, Los Angeles (ONT) 2
05:05
San Salvador (SAL) AV 531 Non-stop Airbus A320neo (32N) 4:40 Effective 2025-08-10 through 2025-08-16 The flight arrives 1 day after departure. |
Mar,Dim
23:25
Ontario, Los Angeles (ONT) 2
05:05
San Salvador (SAL) AV 531 Non-stop Airbus A320 (320) 4:40 Effective 2025-08-12 through 2025-08-19 The flight arrives 1 day after departure. |
Mar,Jeu
23:25
Ontario, Los Angeles (ONT) 2
05:05
San Salvador (SAL) AV 531 Non-stop Airbus A320neo (32N) 4:40 Effective 2025-08-21 through 2025-10-23 The flight arrives 1 day after departure. |
Sam,Dim
23:25
Ontario, Los Angeles (ONT) 2
05:05
San Salvador (SAL) AV 531 Non-stop Airbus A320 (320) 4:40 Effective 2025-08-23 through 2025-09-06 The flight arrives 1 day after departure. |
Sam
23:25
Ontario, Los Angeles (ONT) 2
05:05
San Salvador (SAL) AV 531 Non-stop Airbus A320 (320) 4:40 Effective 2025-09-13 through 2025-10-25 The flight arrives 1 day after departure. |
Mar,Jeu,Sam
23:30
Ontario, Los Angeles (ONT) 2
05:05
San Salvador (SAL) AV 531 Non-stop Airbus A320neo (32N) 4:35 Effective 2025-10-28 through 2025-11-01 The flight arrives 1 day after departure. |