Allegiant Air vol G4 3159: Multiple routes

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Dim 06:00 Flint (FNT) 08:25 Jacksonville (JAX)
G4 3159 Non-stop Airbus A320 (320) 2:25 Operates only on 2026-03-22
Dim 06:00 Flint (FNT) 06:35 Nashville (BNA)
G4 3159 Non-stop Airbus A320 (320) 1:35 Effective 2026-06-07 through 2026-06-28
Sam 06:30 Flint (FNT) 09:20 St. Pete-Clearwater, Tampa (PIE)
G4 3159 Non-stop Airbus A320 (320) 2:50 Effective 2026-03-07 through 2026-03-14
Dim 07:00 Flint (FNT) 09:52 St. Pete-Clearwater, Tampa (PIE)
G4 3159 Non-stop Airbus A320 (320) 2:52 Operates only on 2026-03-01
Dim 08:00 Flint (FNT) 10:41 St. Pete-Clearwater, Tampa (PIE)
G4 3159 Non-stop Airbus A320 (320) 2:41 Effective 2026-05-24 through 2026-05-31
Sam 08:30 Flint (FNT) 10:53 Phoenix-Mesa Gateway (AZA)
G4 3159 Non-stop Airbus A320 (320) 4:23 Valid until 2026-01-03
Sam 10:19 Punta Gorda (PGD) 13:17 Flint (FNT)
G4 3159 Non-stop Airbus A320 (320) 2:58 Effective 2026-03-21 through 2026-03-28
Mer 11:26 Orlando Sanford (SFB) 14:12 Flint (FNT)
G4 3159 Non-stop Airbus A320 (320) 2:46 Effective 2026-03-04 through 2026-03-25
Jeu 11:41 Orlando Sanford (SFB) 14:27 Flint (FNT)
G4 3159 Non-stop Airbus A320 (320) 2:46 Operates only on 2026-03-26
Mer 12:00 Flint (FNT) 15:00 Sarasota/Bradenton (SRQ)
G4 3159 Non-stop Airbus A320 (320) 3:00 Operates only on 2026-02-11
Dim 12:25 Sarasota/Bradenton (SRQ) 15:20 Flint (FNT)
G4 3159 Non-stop Airbus A320 (320) 2:55 Valid until 2026-01-04
Mar 13:46 Punta Gorda (PGD) 16:42 Flint (FNT)
G4 3159 Non-stop Airbus A320 (320) 2:56 Operates only on 2026-04-07
Sam 15:08 Flint (FNT) 17:49 Orlando Sanford (SFB)
G4 3159 Non-stop Airbus A320 (320) 2:41 Operates only on 2026-02-28
Sam 15:26 Flint (FNT) 18:14 Sarasota/Bradenton (SRQ)
G4 3159 Non-stop Airbus A320 (320) 2:48 Operates only on 2026-04-04
Sam 16:07 Flint (FNT) 19:00 St. Pete-Clearwater, Tampa (PIE)
G4 3159 Non-stop Airbus A320 (320) 2:53 Operates only on 2026-02-14
Sam 16:07 Flint (FNT) 19:07 Sarasota/Bradenton (SRQ)
G4 3159 Non-stop Airbus A320 (320) 3:00 Operates only on 2026-02-21
Ven 18:59 Punta Gorda (PGD) 21:54 Flint (FNT)
G4 3159 Non-stop Airbus A320 (320) 2:55 Effective 2026-05-22 through 2026-05-29
Lun 19:32 Sarasota/Bradenton (SRQ) 22:27 Flint (FNT)
G4 3159 Non-stop Airbus A320 (320) 2:55 Valid until 2026-01-05
Jeu 20:13 Orlando Sanford (SFB) 22:54 Flint (FNT)
G4 3159 Non-stop Airbus A320 (320) 2:41 Valid until 2026-01-01
This flight number is listed as serving the following routes:
Allegiant Air vol G4 3159: Multiple routes
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Allegiant Air G43159
Operates only on 2026-03-22
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:25, non-stop
Airbus A320 (320)

Vols directs:

Allegiant Air G43159
Effective 2026-06-07 through 2026-06-28
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:35, non-stop
Airbus A320 (320)

Vols directs:

Allegiant Air G43159
Effective 2026-03-07 through 2026-03-14
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:50, non-stop
Airbus A320 (320)

Vols directs:

Allegiant Air G43159
Operates only on 2026-03-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:52, non-stop
Airbus A320 (320)

Vols directs:

Allegiant Air G43159
Effective 2026-05-24 through 2026-05-31
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:41, non-stop
Airbus A320 (320)

Vols directs:

Allegiant Air G43159
Valid until 2026-01-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 4:23, non-stop
Airbus A320 (320)

Vols directs:

Allegiant Air G43159
Effective 2026-03-21 through 2026-03-28
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:58, non-stop
Airbus A320 (320)

Vols directs:

Allegiant Air G43159
Effective 2026-03-04 through 2026-03-25
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:46, non-stop
Airbus A320 (320)

Vols directs:

Allegiant Air G43159
Operates only on 2026-03-26
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 2:46, non-stop
Airbus A320 (320)

Vols directs:

Allegiant Air G43159
Operates only on 2026-02-11
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:00, non-stop
Airbus A320 (320)

Vols directs:

Allegiant Air G43159
Valid until 2026-01-04
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:55, non-stop
Airbus A320 (320)

Vols directs:

Allegiant Air G43159
Operates only on 2026-04-07
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:56, non-stop
Airbus A320 (320)

Vols directs:

Allegiant Air G43159
Operates only on 2026-02-28
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:41, non-stop
Airbus A320 (320)

Vols directs:

Allegiant Air G43159
Operates only on 2026-04-04
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:48, non-stop
Airbus A320 (320)

Vols directs:

Allegiant Air G43159
Operates only on 2026-02-14
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:53, non-stop
Airbus A320 (320)

Vols directs:

Allegiant Air G43159
Operates only on 2026-02-21
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 3:00, non-stop
Airbus A320 (320)

Vols directs:

Allegiant Air G43159
Effective 2026-05-22 through 2026-05-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:55, non-stop
Airbus A320 (320)

Vols directs:

Allegiant Air G43159
Valid until 2026-01-05
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:55, non-stop
Airbus A320 (320)

Vols directs:

Allegiant Air G43159
Valid until 2026-01-01
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 2:41, non-stop
Airbus A320 (320)
This flight number is listed as serving the following routes:
  • Flint (FNT) - Jacksonville (JAX)
  • Flint (FNT) - Nashville (BNA)
  • Flint (FNT) - Phoenix-Mesa Gateway (AZA)
  • Flint (FNT) - Sarasota/Bradenton (SRQ)
  • Flint (FNT) - St. Pete-Clearwater, Tampa (PIE)
  • Orlando Sanford (SFB) - Flint (FNT)
  • Punta Gorda (PGD) - Flint (FNT)