Southwest Airlines flight WN 630: Santa Ana - San Jose del Cabo

Select flight date:
FLIGHT SCHEDULE
Direct Flights:
Sun 08:00 Santa Ana (SNA) 10:20 San Jose del Cabo (SJD) 2
WN 630 Non-stop Boeing 737-700 (Scimitar Winglets) 2:20 Effective 2026-08-09 through 2026-09-27
Sun 08:25 Santa Ana (SNA) 10:40 San Jose del Cabo (SJD) 2
WN 630 Non-stop Boeing 737-700 (Scimitar Winglets) 2:15 Operates only on 2026-05-24
Tue,Wed 08:40 Santa Ana (SNA) 11:00 San Jose del Cabo (SJD) 2
WN 630 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Effective 2026-06-09 through 2026-07-29
Thu,Fri 09:45 Santa Ana (SNA) 13:00 San Jose del Cabo (SJD) 2
WN 630 Non-stop Boeing 737-700 (Scimitar Winglets) 2:15 Effective 2026-03-05 through 2026-03-06
Mon,Thu,Fri 09:45 Santa Ana (SNA) 12:00 San Jose del Cabo (SJD) 2
WN 630 Non-stop Boeing 737-700 (Scimitar Winglets) 2:15 Effective 2026-03-09 through 2026-04-06
Thu,Fri,Sun 09:50 Santa Ana (SNA) 13:10 San Jose del Cabo (SJD) 2
WN 630 Non-stop Boeing 737-700 (Scimitar Winglets) 2:20 Effective 2026-01-11 through 2026-01-16
Mon,Sun 09:50 Santa Ana (SNA) 13:10 San Jose del Cabo (SJD) 2
WN 630 Non-stop Boeing 737-700 (Scimitar Winglets) 2:20 Effective 2026-01-19 through 2026-01-25
Thu,Fri,Sun 09:50 Santa Ana (SNA) 13:10 San Jose del Cabo (SJD) 2
WN 630 Non-stop Boeing 737-700 (Scimitar Winglets) 2:20 Effective 2026-02-01 through 2026-02-06
Mon,Sun 09:50 Santa Ana (SNA) 13:10 San Jose del Cabo (SJD) 2
WN 630 Non-stop Boeing 737-700 (Scimitar Winglets) 2:20 Effective 2026-02-09 through 2026-02-15
Mon,Tue,Thu 09:50 Santa Ana (SNA) 13:10 San Jose del Cabo (SJD) 2
WN 630 Non-stop Boeing 737-700 (Scimitar Winglets) 2:20 Effective 2026-02-17 through 2026-02-23
Mon 09:50 Santa Ana (SNA) 13:10 San Jose del Cabo (SJD) 2
WN 630 Non-stop Boeing 737-700 (Scimitar Winglets) 2:20 Operates only on 2026-03-02
Mon-Fri 09:50 Santa Ana (SNA) 12:15 San Jose del Cabo (SJD) 2
WN 630 Non-stop Boeing 737-700 (Scimitar Winglets) 2:25 Effective 2026-08-04 through 2026-09-30
Sun 09:55 Santa Ana (SNA) 12:10 San Jose del Cabo (SJD) 2
WN 630 Non-stop Boeing 737-700 (Scimitar Winglets) 2:15 Effective 2026-03-08 through 2026-05-17
Sun 09:55 Santa Ana (SNA) 12:10 San Jose del Cabo (SJD) 2
WN 630 Non-stop Boeing 737-700 (Scimitar Winglets) 2:15 Operates only on 2026-05-31
Mon-Fri 10:05 Santa Ana (SNA) 13:25 San Jose del Cabo (SJD) 2
WN 630 Non-stop Boeing 737-700 (Scimitar Winglets) 2:20 Effective 2026-01-06 through 2026-01-14
Tue-Fri,Sun 10:05 Santa Ana (SNA) 13:25 San Jose del Cabo (SJD) 2
WN 630 Non-stop Boeing 737-700 (Scimitar Winglets) 2:20 Effective 2026-01-18 through 2026-01-23
Mon-Fri 10:05 Santa Ana (SNA) 13:25 San Jose del Cabo (SJD) 2
WN 630 Non-stop Boeing 737-700 (Scimitar Winglets) 2:20 Effective 2026-01-26 through 2026-02-04
Tue,Wed,Sun 10:05 Santa Ana (SNA) 13:25 San Jose del Cabo (SJD) 2
WN 630 Non-stop Boeing 737-700 (Scimitar Winglets) 2:20 Effective 2026-02-08 through 2026-02-11
Tue,Wed 10:05 Santa Ana (SNA) 13:25 San Jose del Cabo (SJD) 2
WN 630 Non-stop Boeing 737-700 (Scimitar Winglets) 2:20 Effective 2026-02-18 through 2026-03-04
Tue,Wed 10:05 Santa Ana (SNA) 12:20 San Jose del Cabo (SJD) 2
WN 630 Non-stop Boeing 737-700 (Scimitar Winglets) 2:15 Effective 2026-03-10 through 2026-04-01
Tue,Wed 10:15 Santa Ana (SNA) 12:30 San Jose del Cabo (SJD) 2
WN 630 Non-stop Boeing 737-700 (Scimitar Winglets) 2:15 Effective 2026-04-07 through 2026-06-03
Mon,Thu,Fri 10:20 Santa Ana (SNA) 13:40 San Jose del Cabo (SJD) 2
WN 630 Non-stop Boeing 737-700 (Scimitar Winglets) 2:20 Effective 2026-02-12 through 2026-02-16
Thu,Fri,Sun 10:20 Santa Ana (SNA) 13:40 San Jose del Cabo (SJD) 2
WN 630 Non-stop Boeing 737-700 (Scimitar Winglets) 2:20 Effective 2026-02-20 through 2026-03-01
Sat 10:25 Santa Ana (SNA) 12:40 San Jose del Cabo (SJD) 2
WN 630 Non-stop Boeing 737-700 (Scimitar Winglets) 2:15 Effective 2026-04-11 through 2026-05-30
Sat,Sun 10:30 Santa Ana (SNA) 12:55 San Jose del Cabo (SJD) 2
WN 630 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2026-06-06 through 2026-08-02
Sat 10:35 Santa Ana (SNA) 13:55 San Jose del Cabo (SJD) 2
WN 630 Non-stop Boeing 737-700 (Scimitar Winglets) 2:20 Effective 2026-01-10 through 2026-02-07
Sat 10:35 Santa Ana (SNA) 13:55 San Jose del Cabo (SJD) 2
WN 630 Non-stop Boeing 737-700 (Scimitar Winglets) 2:20 Operates only on 2026-03-07
Sat 10:35 Santa Ana (SNA) 12:55 San Jose del Cabo (SJD) 2
WN 630 Non-stop Boeing 737-700 (Scimitar Winglets) 2:20 Effective 2026-03-14 through 2026-04-04
Mon,Thu,Fri 10:45 Santa Ana (SNA) 13:00 San Jose del Cabo (SJD) 2
WN 630 Non-stop Boeing 737-700 (Scimitar Winglets) 2:15 Effective 2026-04-09 through 2026-06-01
Sat 10:45 Santa Ana (SNA) 13:10 San Jose del Cabo (SJD) 2
WN 630 Non-stop Boeing 737-700 (Scimitar Winglets) 2:25 Effective 2026-08-08 through 2026-09-26
Sat 11:00 Santa Ana (SNA) 14:20 San Jose del Cabo (SJD) 2
WN 630 Non-stop Boeing 737-700 (Scimitar Winglets) 2:20 Effective 2026-02-14 through 2026-02-28
Mon,Thu,Fri 11:05 Santa Ana (SNA) 13:25 San Jose del Cabo (SJD) 2
WN 630 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Effective 2026-06-04 through 2026-08-03
Southwest Airlines flight WN 630:
Santa Ana - San Jose del Cabo
Select flight date:
FLIGHT SCHEDULE
Direct Flights:

Southwest Airlines WN630
Effective 2026-08-09 through 2026-09-27
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:20, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Southwest Airlines WN630
Operates only on 2026-05-24
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:15, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Southwest Airlines WN630
Effective 2026-06-09 through 2026-07-29
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Southwest Airlines WN630
Effective 2026-03-05 through 2026-03-06
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 2:15, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Southwest Airlines WN630
Effective 2026-03-09 through 2026-04-06
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 2:15, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Southwest Airlines WN630
Effective 2026-01-11 through 2026-01-16
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 2:20, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Southwest Airlines WN630
Effective 2026-01-19 through 2026-01-25
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:20, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Southwest Airlines WN630
Effective 2026-02-01 through 2026-02-06
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 2:20, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Southwest Airlines WN630
Effective 2026-02-09 through 2026-02-15
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:20, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Southwest Airlines WN630
Effective 2026-02-17 through 2026-02-23
Mon
Tue
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Southwest Airlines WN630
Operates only on 2026-03-02
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Southwest Airlines WN630
Effective 2026-08-04 through 2026-09-30
Mon
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Duration: 2:25, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Southwest Airlines WN630
Effective 2026-03-08 through 2026-05-17
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:15, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Southwest Airlines WN630
Operates only on 2026-05-31
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:15, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Southwest Airlines WN630
Effective 2026-01-06 through 2026-01-14
Mon
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Duration: 2:20, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Southwest Airlines WN630
Effective 2026-01-18 through 2026-01-23
Mon
-
Tue
Wed
Thu
Fri
Sat
-
Sun
Duration: 2:20, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Southwest Airlines WN630
Effective 2026-01-26 through 2026-02-04
Mon
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Duration: 2:20, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Southwest Airlines WN630
Effective 2026-02-08 through 2026-02-11
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:20, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Southwest Airlines WN630
Effective 2026-02-18 through 2026-03-04
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Southwest Airlines WN630
Effective 2026-03-10 through 2026-04-01
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:15, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Southwest Airlines WN630
Effective 2026-04-07 through 2026-06-03
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:15, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Southwest Airlines WN630
Effective 2026-02-12 through 2026-02-16
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 2:20, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Southwest Airlines WN630
Effective 2026-02-20 through 2026-03-01
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 2:20, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Southwest Airlines WN630
Effective 2026-04-11 through 2026-05-30
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:15, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Southwest Airlines WN630
Effective 2026-06-06 through 2026-08-02
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Southwest Airlines WN630
Effective 2026-01-10 through 2026-02-07
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:20, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Southwest Airlines WN630
Operates only on 2026-03-07
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:20, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Southwest Airlines WN630
Effective 2026-03-14 through 2026-04-04
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:20, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Southwest Airlines WN630
Effective 2026-04-09 through 2026-06-01
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 2:15, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Southwest Airlines WN630
Effective 2026-08-08 through 2026-09-26
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:25, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Southwest Airlines WN630
Effective 2026-02-14 through 2026-02-28
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:20, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Southwest Airlines WN630
Effective 2026-06-04 through 2026-08-03
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)
  • WN 630 is an international flight departing from Santa Ana airport, United States (SNA) and arriving at San Jose del Cabo airport, Mexico (SJD).
  • The flight distance is 878 miles, or 1413 km.
  • The timezone of the departure airport is UTC-8 , and the timezone of the arrival airport is UTC-7 . Current time at the point of departure is (loading...), and (loading...) at the point of arrival. There is a (loading...) hour time difference between the airports.
  • For direct flights, the flight time varies between 2:15 and 2:25.