Southwest Airlines flight WN 3310: Multiple routes

Select flight date:
FLIGHT SCHEDULE
Direct Flights:
Fri 05:25 Fresno (FAT) 06:35 Las Vegas Harry Reid (LAS) 1
WN 3310 Non-stop Boeing 737 MAX 8 (7M8) 1:10 Operates only on 2025-10-31
Sun 05:35 Fresno (FAT) 06:45 Las Vegas Harry Reid (LAS) 1
WN 3310 Non-stop Boeing 737-700 (Scimitar Winglets) 1:10 Effective 2025-10-05 through 2025-10-26
Sat 05:45 Fresno (FAT) 07:00 Las Vegas Harry Reid (LAS) 1
WN 3310 Non-stop Boeing 737 MAX 8 (7M8) 1:15 Effective 2025-10-04 through 2025-11-01
Tue,Wed 06:00 Phoenix Sky Harbor (PHX) 4 10:15 San Antonio (SAT) A
WN 3310 Non-stop Boeing 737 MAX 8 (7M8) 2:15 Effective 2025-06-10 through 2025-07-30
Mon,Thu,Fri 06:05 Orlando (MCO) 08:15 Las Vegas Harry Reid (LAS) 1
WN 3310 Non-stop Boeing 737-700 (73W) 5:10 Valid until 2025-06-02
Tue,Wed 06:20 Orlando (MCO) 08:30 Las Vegas Harry Reid (LAS) 1
WN 3310 Non-stop Boeing 737 MAX 8 (7M8) 5:10 Valid until 2025-06-04
Fri 07:20 Las Vegas Harry Reid (LAS) 1 12:55 Midway, Chicago (MDW)
WN 3310 Non-stop Boeing 737 MAX 8 (7M8) 3:35 Operates only on 2025-10-31
Sun 07:25 Orlando (MCO) 09:35 Las Vegas Harry Reid (LAS) 1
WN 3310 Non-stop Boeing 737 MAX 8 (7M8) 5:10 Operates only on 2025-05-25
Tue,Wed 08:30 Las Vegas Harry Reid (LAS) 1 14:05 Midway, Chicago (MDW)
WN 3310 Non-stop Boeing 737 MAX 8 (7M8) 3:35 Effective 2025-10-07 through 2025-10-29
Sun 13:10 Austin (AUS) 14:25 Denver (DEN)
WN 3310 Non-stop Boeing 737-700 (73W) 2:15 Operates only on 2025-08-31
Sat 14:15 Pittsburgh (PIT) 16:00 Las Vegas Harry Reid (LAS) 1
WN 3310 Non-stop Boeing 737 MAX 8 (7M8) 4:45 Effective 2025-11-08 through 2025-11-15
Sat 14:15 Pittsburgh (PIT) 16:00 Las Vegas Harry Reid (LAS) 1
WN 3310 Non-stop Boeing 737 MAX 8 (7M8) 4:45 Effective 2025-12-06 through 2025-12-13
Fri 15:55 Orlando (MCO) 17:45 Las Vegas Harry Reid (LAS) 1
WN 3310 Non-stop Boeing 737-800 (73H) 4:50 Operates only on 2025-07-04
Tue,Wed 16:25 Austin (AUS) 17:50 Denver (DEN)
WN 3310 Non-stop Boeing 737-800 (73H) 2:25 Effective 2025-08-05 through 2025-10-01
Sat 16:40 Las Vegas Harry Reid (LAS) 1 18:15 San Jose (SJC) B
WN 3310 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2025-11-08 through 2025-11-15
Sat 16:40 Las Vegas Harry Reid (LAS) 1 18:15 San Jose (SJC) B
WN 3310 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2025-12-06 through 2025-12-13
Sat 16:50 Orlando (MCO) 19:00 Las Vegas Harry Reid (LAS) 1
WN 3310 Non-stop Boeing 737-800 (73H) 5:10 Valid until 2025-05-31
Sat 17:10 Rochester (ROC) 19:15 Las Vegas Harry Reid (LAS) 1
WN 3310 Non-stop Boeing 737 MAX 8 (7M8) 5:05 Effective 2025-11-22 through 2025-11-29
Sat 17:10 Rochester (ROC) 19:15 Las Vegas Harry Reid (LAS) 1
WN 3310 Non-stop Boeing 737 MAX 8 (7M8) 5:05 Effective 2025-12-20 through 2026-01-03
Sat 17:25 Austin (AUS) 18:55 Denver (DEN)
WN 3310 Non-stop Boeing 737-800 (73H) 2:30 Effective 2025-08-09 through 2025-09-27
Mon,Thu,Fri 17:45 Orlando (MCO) 19:40 Las Vegas Harry Reid (LAS) 1
WN 3310 Non-stop Boeing 737 MAX 8 (7M8) 4:55 Effective 2025-06-05 through 2025-07-03
Mon,Thu,Fri 17:45 Orlando (MCO) 19:40 Las Vegas Harry Reid (LAS) 1
WN 3310 Non-stop Boeing 737 MAX 8 (7M8) 4:55 Effective 2025-07-07 through 2025-08-04
Mon,Thu,Fri 18:00 Austin (AUS) 19:25 Denver (DEN)
WN 3310 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2025-08-07 through 2025-09-29
Tue,Wed 18:10 Las Vegas Harry Reid (LAS) 1 19:40 San Jose (SJC) B
WN 3310 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Effective 2025-11-04 through 2025-11-12
Mon-Thu 18:10 Las Vegas Harry Reid (LAS) 1 19:40 San Jose (SJC) B
WN 3310 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Effective 2025-11-17 through 2025-11-20
Mon-Fri 18:10 Las Vegas Harry Reid (LAS) 1 19:40 San Jose (SJC) B
WN 3310 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Effective 2025-12-02 through 2025-12-11
Mon-Wed 18:10 Las Vegas Harry Reid (LAS) 1 19:40 San Jose (SJC) B
WN 3310 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Effective 2025-12-15 through 2025-12-17
Wed,Thu 18:10 Las Vegas Harry Reid (LAS) 1 19:40 San Jose (SJC) B
WN 3310 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Effective 2025-12-24 through 2026-01-01
Sun 18:20 Austin (AUS) 19:45 Denver (DEN)
WN 3310 Non-stop Boeing 737-800 (73H) 2:25 Effective 2025-08-10 through 2025-08-24
Sun 18:20 Austin (AUS) 19:45 Denver (DEN)
WN 3310 Non-stop Boeing 737-800 (73H) 2:25 Effective 2025-09-07 through 2025-09-28
Sat 18:55 Orlando (MCO) 20:50 Las Vegas Harry Reid (LAS) 1
WN 3310 Non-stop Boeing 737 MAX 8 (7M8) 4:55 Effective 2025-06-07 through 2025-08-02
Sat 19:55 Las Vegas Harry Reid (LAS) 1 21:25 San Jose (SJC) B
WN 3310 Non-stop Boeing 737 MAX 8 (7M8) 1:30 Effective 2025-11-22 through 2025-11-29
Sat 19:55 Las Vegas Harry Reid (LAS) 1 21:25 San Jose (SJC) B
WN 3310 Non-stop Boeing 737 MAX 8 (7M8) 1:30 Effective 2025-12-20 through 2026-01-03
Mon,Thu,Fri,Sun 20:20 Las Vegas Harry Reid (LAS) 1 21:35 Los Angeles (LAX) 1
WN 3310 Non-stop Boeing 737 MAX 8 (7M8) 1:15 Effective 2025-06-05 through 2025-07-03
Mon,Thu,Fri,Sun 20:20 Las Vegas Harry Reid (LAS) 1 21:35 Los Angeles (LAX) 1
WN 3310 Non-stop Boeing 737 MAX 8 (7M8) 1:15 Effective 2025-07-06 through 2025-08-04
Mon-Wed 20:20 Las Vegas Harry Reid (LAS) 1 21:50 San Jose (SJC) B
WN 3310 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Effective 2025-11-25 through 2025-12-01
Mon,Tue,Fri,Sun 20:20 Las Vegas Harry Reid (LAS) 1 21:50 San Jose (SJC) B
WN 3310 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Effective 2025-12-19 through 2026-01-04
Mon,Thu,Fri,Sun 20:25 Las Vegas Harry Reid (LAS) 1 21:55 San Jose (SJC) B
WN 3310 Non-stop Boeing 737 MAX 8 (7M8) 1:30 Effective 2025-11-02 through 2025-11-16
Mon,Fri,Sun 20:25 Las Vegas Harry Reid (LAS) 1 21:55 San Jose (SJC) B
WN 3310 Non-stop Boeing 737 MAX 8 (7M8) 1:30 Effective 2025-11-21 through 2025-11-28
Fri,Sun 20:25 Las Vegas Harry Reid (LAS) 1 21:55 San Jose (SJC) B
WN 3310 Non-stop Boeing 737 MAX 8 (7M8) 1:30 Effective 2025-12-07 through 2025-12-14
Thu 20:25 Las Vegas Harry Reid (LAS) 1 21:55 San Jose (SJC) B
WN 3310 Non-stop Boeing 737 MAX 8 (7M8) 1:30 Operates only on 2025-12-18
Mon 20:25 Las Vegas Harry Reid (LAS) 1 21:55 San Jose (SJC) B
WN 3310 Non-stop Boeing 737 MAX 8 (7M8) 1:30 Operates only on 2026-01-05
Non-Direct Flights:
Fri 05:25 Fresno (FAT) 12:55 Midway, Chicago (MDW)
WN 3310 1-stop Boeing 737 MAX 8 (7M8) 5:30 Operates only on 2025-10-31
Sat 14:15 Pittsburgh (PIT) 18:15 San Jose (SJC) B
WN 3310 1-stop Boeing 737 MAX 8 (7M8) 7:00 Effective 2025-11-08 through 2025-11-15
Sat 14:15 Pittsburgh (PIT) 18:15 San Jose (SJC) B
WN 3310 1-stop Boeing 737 MAX 8 (7M8) 7:00 Effective 2025-12-06 through 2025-12-13
Sat 17:10 Rochester (ROC) 21:25 San Jose (SJC) B
WN 3310 1-stop Boeing 737 MAX 8 (7M8) 7:15 Effective 2025-11-22 through 2025-11-29
Sat 17:10 Rochester (ROC) 21:25 San Jose (SJC) B
WN 3310 1-stop Boeing 737 MAX 8 (7M8) 7:15 Effective 2025-12-20 through 2026-01-03
Mon,Thu,Fri 17:45 Orlando (MCO) 21:35 Los Angeles (LAX) 1
WN 3310 1-stop Boeing 737 MAX 8 (7M8) 6:50 Effective 2025-06-05 through 2025-07-03
Mon,Thu,Fri 17:45 Orlando (MCO) 21:35 Los Angeles (LAX) 1
WN 3310 1-stop Boeing 737 MAX 8 (7M8) 6:50 Effective 2025-07-07 through 2025-08-04
This flight number is listed as serving the following routes:
Southwest Airlines flight WN 3310: Multiple routes
Select flight date:
FLIGHT SCHEDULE
Direct Flights:

Southwest Airlines WN3310
Operates only on 2025-10-31
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 1:10, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3310
Effective 2025-10-05 through 2025-10-26
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:10, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN3310
Effective 2025-10-04 through 2025-11-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3310
Effective 2025-06-10 through 2025-07-30
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3310
Valid until 2025-06-02
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 5:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3310
Valid until 2025-06-04
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 5:10, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3310
Operates only on 2025-10-31
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 3:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3310
Operates only on 2025-05-25
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 5:10, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3310
Effective 2025-10-07 through 2025-10-29
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 3:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3310
Operates only on 2025-08-31
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3310
Effective 2025-11-08 through 2025-11-15
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 4:45, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3310
Effective 2025-12-06 through 2025-12-13
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 4:45, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3310
Operates only on 2025-07-04
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 4:50, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3310
Effective 2025-08-05 through 2025-10-01
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3310
Effective 2025-11-08 through 2025-11-15
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3310
Effective 2025-12-06 through 2025-12-13
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3310
Valid until 2025-05-31
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 5:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3310
Effective 2025-11-22 through 2025-11-29
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 5:05, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3310
Effective 2025-12-20 through 2026-01-03
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 5:05, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3310
Effective 2025-08-09 through 2025-09-27
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3310
Effective 2025-06-05 through 2025-07-03
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 4:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3310
Effective 2025-07-07 through 2025-08-04
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 4:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3310
Effective 2025-08-07 through 2025-09-29
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3310
Effective 2025-11-04 through 2025-11-12
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN3310
Effective 2025-11-17 through 2025-11-20
Mon
Tue
Wed
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN3310
Effective 2025-12-02 through 2025-12-11
Mon
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Duration: 1:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN3310
Effective 2025-12-15 through 2025-12-17
Mon
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN3310
Effective 2025-12-24 through 2026-01-01
Mon
-
Tue
-
Wed
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN3310
Effective 2025-08-10 through 2025-08-24
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3310
Effective 2025-09-07 through 2025-09-28
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3310
Effective 2025-06-07 through 2025-08-02
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 4:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3310
Effective 2025-11-22 through 2025-11-29
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3310
Effective 2025-12-20 through 2026-01-03
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3310
Effective 2025-06-05 through 2025-07-03
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 1:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3310
Effective 2025-07-06 through 2025-08-04
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 1:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3310
Effective 2025-11-25 through 2025-12-01
Mon
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN3310
Effective 2025-12-19 through 2026-01-04
Mon
Tue
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 1:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN3310
Effective 2025-11-02 through 2025-11-16
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 1:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3310
Effective 2025-11-21 through 2025-11-28
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 1:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3310
Effective 2025-12-07 through 2025-12-14
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 1:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3310
Operates only on 2025-12-18
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3310
Operates only on 2026-01-05
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:30, non-stop
Boeing 737 MAX 8 (7M8)

Non-Direct Flights:

Southwest Airlines WN3310
Operates only on 2025-10-31
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 5:30, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3310
Effective 2025-11-08 through 2025-11-15
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 7:00, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3310
Effective 2025-12-06 through 2025-12-13
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 7:00, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3310
Effective 2025-11-22 through 2025-11-29
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 7:15, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3310
Effective 2025-12-20 through 2026-01-03
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 7:15, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3310
Effective 2025-06-05 through 2025-07-03
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 6:50, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3310
Effective 2025-07-07 through 2025-08-04
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 6:50, 1-stop
Boeing 737 MAX 8 (7M8)
This flight number is listed as serving the following routes:
  • Austin (AUS) - Denver (DEN)
  • Fresno (FAT) - Las Vegas Harry Reid (LAS)
  • Fresno (FAT) - Midway, Chicago (MDW)
  • Las Vegas Harry Reid (LAS) - Los Angeles (LAX)
  • Las Vegas Harry Reid (LAS) - Midway, Chicago (MDW)
  • Las Vegas Harry Reid (LAS) - San Jose (SJC)
  • Orlando (MCO) - Las Vegas Harry Reid (LAS)
  • Orlando (MCO) - Los Angeles (LAX)
  • Phoenix Sky Harbor (PHX) - San Antonio (SAT)
  • Pittsburgh (PIT) - Las Vegas Harry Reid (LAS)
  • Pittsburgh (PIT) - San Jose (SJC)
  • Rochester (ROC) - Las Vegas Harry Reid (LAS)
  • Rochester (ROC) - San Jose (SJC)