| FLIGHT SCHEDULE |
|---|
| Direct Codeshare Flights: |
| Mon-Fri
08:20
Mackay (MKY)
09:50
Brisbane (BNE) D SQ 6499 Non-stop Boeing 737-800 (73H) 1:30 Valid until 2026-01-07 Codeshare flight, operated by Virgin Australia.(VA 604) |
| Mon
08:20
Mackay (MKY)
09:50
Brisbane (BNE) D SQ 6499 Non-stop Boeing 737-800 (73H) 1:30 Effective 2026-01-12 through 2026-01-26 Codeshare flight, operated by Virgin Australia.(VA 604) |
| Tue-Fri
08:20
Mackay (MKY)
09:50
Brisbane (BNE) D SQ 6499 Non-stop Boeing 737-800 (73H) 1:30 Effective 2026-01-27 through 2026-02-27 Codeshare flight, operated by Virgin Australia.(VA 604) |
| Mon
08:20
Mackay (MKY)
09:50
Brisbane (BNE) D SQ 6499 Non-stop Boeing 737-700 (73W) 1:30 Effective 2026-02-02 through 2026-02-23 Codeshare flight, operated by Virgin Australia.(VA 604) |
| Mon-Fri
08:20
Mackay (MKY)
09:50
Brisbane (BNE) D SQ 6499 Non-stop Boeing 737-800 (73H) 1:30 Effective 2026-03-02 through 2026-03-06 Codeshare flight, operated by Virgin Australia.(VA 604) |
| Mon-Fri
08:20
Mackay (MKY)
09:50
Brisbane (BNE) D SQ 6499 Non-stop Boeing 737-800 (73H) 1:30 Effective 2026-03-10 through 2026-03-27 Codeshare flight, operated by Virgin Australia.(VA 604) |
| Thu,Fri
08:25
Mackay (MKY)
10:05
Brisbane (BNE) D SQ 6499 Non-stop Fokker 100 (100) 1:40 Effective 2026-01-08 through 2026-01-23 Codeshare flight, operated by Virgin Australia.(VA 604) |
| Mon
08:25
Mackay (MKY)
10:05
Brisbane (BNE) D SQ 6499 Non-stop Fokker 100 (100) 1:40 Operates only on 2026-03-09 Codeshare flight, operated by Virgin Australia.(VA 604) |
| Mon-Fri
08:25
Mackay (MKY)
09:55
Brisbane (BNE) D SQ 6499 Non-stop Boeing 737-700 (73W) 1:30 Effective 2026-03-30 through 2026-04-03 Codeshare flight, operated by Virgin Australia.(VA 604) |
| Mon-Sat
08:25
Mackay (MKY)
09:55
Brisbane (BNE) D SQ 6499 Non-stop Boeing 737-800 (73H) 1:30 Effective 2026-04-06 through 2026-05-08 Codeshare flight, operated by Virgin Australia.(VA 604) |
| Sat
08:25
Mackay (MKY)
09:55
Brisbane (BNE) D SQ 6499 Non-stop Boeing 737-700 (73W) 1:30 Effective 2026-05-09 through 2026-05-30 Codeshare flight, operated by Virgin Australia.(VA 604) |
| Mon-Fri
08:25
Mackay (MKY)
09:55
Brisbane (BNE) D SQ 6499 Non-stop Boeing 737-800 (73H) 1:30 Effective 2026-05-11 through 2026-06-05 Codeshare flight, operated by Virgin Australia.(VA 604) |
| Mon-Sat
08:25
Mackay (MKY)
09:55
Brisbane (BNE) D SQ 6499 Non-stop Boeing 737-800 (73H) 1:30 Effective 2026-06-06 through 2026-06-12 Codeshare flight, operated by Virgin Australia.(VA 604) |
| Sat
08:25
Mackay (MKY)
09:55
Brisbane (BNE) D SQ 6499 Non-stop Boeing 737-700 (73W) 1:30 Operates only on 2026-06-13 Codeshare flight, operated by Virgin Australia.(VA 604) |
| Mon,Wed-Sat
08:25
Mackay (MKY)
09:55
Brisbane (BNE) D SQ 6499 Non-stop Boeing 737-800 (73H) 1:30 Effective 2026-06-15 through 2026-06-22 Codeshare flight, operated by Virgin Australia.(VA 604) |
| Mon-Sat
08:25
Mackay (MKY)
09:55
Brisbane (BNE) D SQ 6499 Non-stop Boeing 737-800 (73H) 1:30 Effective 2026-06-23 through 2026-06-29 Codeshare flight, operated by Virgin Australia.(VA 604) |
| Mon,Wed-Sat
08:25
Mackay (MKY)
09:55
Brisbane (BNE) D SQ 6499 Non-stop Boeing 737-800 (73H) 1:30 Effective 2026-07-01 through 2026-07-06 Codeshare flight, operated by Virgin Australia.(VA 604) |
| Mon,Thu,Fri
08:25
Mackay (MKY)
09:55
Brisbane (BNE) D SQ 6499 Non-stop Boeing 737-800 (73H) 1:30 Effective 2026-07-09 through 2026-07-27 Codeshare flight, operated by Virgin Australia.(VA 604) |
| Mon-Fri
08:25
Mackay (MKY)
09:55
Brisbane (BNE) D SQ 6499 Non-stop Boeing 737-800 (73H) 1:30 Effective 2026-07-29 through 2026-09-18 Codeshare flight, operated by Virgin Australia.(VA 604) |
| Sat
08:25
Mackay (MKY)
09:55
Brisbane (BNE) D SQ 6499 Non-stop Boeing 737-700 (73W) 1:30 Effective 2026-08-01 through 2026-09-12 Codeshare flight, operated by Virgin Australia.(VA 604) |
| Mon-Sat
08:25
Mackay (MKY)
09:55
Brisbane (BNE) D SQ 6499 Non-stop Boeing 737-800 (73H) 1:30 Effective 2026-09-19 through 2026-10-03 Codeshare flight, operated by Virgin Australia.(VA 604) |
| Mon-Fri
08:25
Mackay (MKY)
09:55
Brisbane (BNE) D SQ 6499 Non-stop Boeing 737-700 (73W) 1:30 Effective 2026-10-05 through 2026-10-23 Codeshare flight, operated by Virgin Australia.(VA 604) |
| Sat
08:25
Mackay (MKY)
09:55
Brisbane (BNE) D SQ 6499 Non-stop Boeing 737-800 (73H) 1:30 Effective 2026-10-10 through 2026-10-24 Codeshare flight, operated by Virgin Australia.(VA 604) |
| Tue
08:30
Mackay (MKY)
10:10
Brisbane (BNE) D SQ 6499 Non-stop Fokker 70 (F70) 1:40 Operates only on 2026-06-16 Codeshare flight, operated by Virgin Australia.(VA 604) |
| Tue
08:30
Mackay (MKY)
10:10
Brisbane (BNE) D SQ 6499 Non-stop Fokker 70 (F70) 1:40 Effective 2026-06-30 through 2026-07-07 Codeshare flight, operated by Virgin Australia.(VA 604) |
| Tue,Wed,Sat
08:30
Mackay (MKY)
10:10
Brisbane (BNE) D SQ 6499 Non-stop Fokker 70 (F70) 1:40 Effective 2026-07-08 through 2026-07-28 Codeshare flight, operated by Virgin Australia.(VA 604) |
| Daily
11:25
Mackay (MKY)
12:55
Brisbane (BNE) D SQ 6499 Non-stop Boeing 737-700 (73W) 1:30 Effective from 2026-10-25 Codeshare flight, operated by Virgin Australia.(VA 604) |