Qatar Airways flight QR 12: Heathrow, London - Doha

Select flight date:
FLIGHT SCHEDULE
Direct Flights:
Mon-Thu,Sun 18:55 Heathrow, London (LHR) 4 04:35 Doha (DOH)
QR 12 Non-stop Boeing 777-300ER (77W) 6:40 Valid until 2024-01-07
The flight arrives 1 day after departure.
Fri 18:55 Heathrow, London (LHR) 4 04:35 Doha (DOH)
QR 12 Non-stop Airbus A350-1000 (351) 6:40 Operates only on 2024-01-05
The flight arrives 1 day after departure.
Mon,Sat 18:55 Heathrow, London (LHR) 4 04:35 Doha (DOH)
QR 12 Non-stop Airbus A350-900 (359) 6:40 Effective 2024-01-06 through 2024-01-08
The flight arrives 1 day after departure.
Daily 18:55 Heathrow, London (LHR) 4 04:35 Doha (DOH)
QR 12 Non-stop Boeing 777-300ER (77W) 6:40 Effective 2024-01-09 through 2024-01-15
The flight arrives 1 day after departure.
Mon,Tue 18:55 Heathrow, London (LHR) 4 04:35 Doha (DOH)
QR 12 Non-stop Airbus A350-900 (359) 6:40 Effective 2024-01-16 through 2024-01-22
The flight arrives 1 day after departure.
Wed-Fri,Sun 18:55 Heathrow, London (LHR) 4 04:35 Doha (DOH)
QR 12 Non-stop Airbus A350-1000 (351) 6:40 Effective 2024-01-17 through 2024-01-24
The flight arrives 1 day after departure.
Tue,Thu,Sat 18:55 Heathrow, London (LHR) 4 04:35 Doha (DOH)
QR 12 Non-stop Boeing 777-300ER (77W) 6:40 Effective 2024-01-20 through 2024-01-25
The flight arrives 1 day after departure.
Tue,Thu-Sat 18:55 Heathrow, London (LHR) 4 04:35 Doha (DOH)
QR 12 Non-stop Airbus A350-900 (359) 6:40 Effective 2024-01-26 through 2024-02-02
The flight arrives 1 day after departure.
Sun 18:55 Heathrow, London (LHR) 4 04:35 Doha (DOH)
QR 12 Non-stop Airbus A350-1000 (351) 6:40 Operates only on 2024-01-28
The flight arrives 1 day after departure.
Mon,Wed,Sat,Sun 18:55 Heathrow, London (LHR) 4 04:35 Doha (DOH)
QR 12 Non-stop Boeing 777-300ER (77W) 6:40 Effective 2024-01-29 through 2024-02-04
The flight arrives 1 day after departure.
Mon,Wed-Fri,Sun 18:55 Heathrow, London (LHR) 4 04:35 Doha (DOH)
QR 12 Non-stop Airbus A350-1000 (351) 6:40 Effective 2024-02-05 through 2024-02-12
The flight arrives 1 day after departure.
Tue 18:55 Heathrow, London (LHR) 4 04:35 Doha (DOH)
QR 12 Non-stop Airbus A350-900 (359) 6:40 Operates only on 2024-02-06
The flight arrives 1 day after departure.
Fri,Sat 18:55 Heathrow, London (LHR) 4 04:35 Doha (DOH)
QR 12 Non-stop Boeing 777-300ER (77W) 6:40 Effective 2024-02-10 through 2024-02-17
The flight arrives 1 day after departure.
Mon-Wed,Sun 18:55 Heathrow, London (LHR) 4 04:35 Doha (DOH)
QR 12 Non-stop Airbus A350-1000 (351) 6:40 Effective 2024-02-13 through 2024-02-21
The flight arrives 1 day after departure.
Thu 18:55 Heathrow, London (LHR) 4 04:35 Doha (DOH)
QR 12 Non-stop Airbus A350-900 (359) 6:40 Effective 2024-02-15 through 2024-02-22
The flight arrives 1 day after departure.
Fri-Sun 18:55 Heathrow, London (LHR) 4 04:35 Doha (DOH)
QR 12 Non-stop Airbus A350-900 (359) 6:40 Effective 2024-02-23 through 2024-02-25
The flight arrives 1 day after departure.
Mon-Wed,Fri 18:55 Heathrow, London (LHR) 4 04:35 Doha (DOH)
QR 12 Non-stop Airbus A350-1000 (351) 6:40 Effective 2024-02-26 through 2024-03-04
The flight arrives 1 day after departure.
Tue,Thu,Sun 18:55 Heathrow, London (LHR) 4 04:35 Doha (DOH)
QR 12 Non-stop Boeing 777-300ER (77W) 6:40 Effective 2024-02-29 through 2024-03-05
The flight arrives 1 day after departure.
Wed,Sat 18:55 Heathrow, London (LHR) 4 04:35 Doha (DOH)
QR 12 Non-stop Airbus A350-900 (359) 6:40 Effective 2024-03-02 through 2024-03-09
The flight arrives 1 day after departure.
Thu,Sun 18:55 Heathrow, London (LHR) 4 04:35 Doha (DOH)
QR 12 Non-stop Airbus A350-1000 (351) 6:40 Effective 2024-03-07 through 2024-03-10
The flight arrives 1 day after departure.
Mon-Wed,Fri 18:55 Heathrow, London (LHR) 4 04:35 Doha (DOH)
QR 12 Non-stop Boeing 777-300ER (77W) 6:40 Effective 2024-03-08 through 2024-03-13
The flight arrives 1 day after departure.
Mon,Thu,Sun 18:55 Heathrow, London (LHR) 4 04:35 Doha (DOH)
QR 12 Non-stop Airbus A350-900 (359) 6:40 Effective 2024-03-14 through 2024-03-18
The flight arrives 1 day after departure.
Fri 18:55 Heathrow, London (LHR) 4 04:35 Doha (DOH)
QR 12 Non-stop Boeing 777-200LR (77L) 6:40 Operates only on 2024-03-15
The flight arrives 1 day after departure.
Tue,Wed,Fri,Sat 18:55 Heathrow, London (LHR) 4 04:35 Doha (DOH)
QR 12 Non-stop Boeing 777-300ER (77W) 6:40 Effective 2024-03-16 through 2024-03-22
The flight arrives 1 day after departure.
Thu,Sat 18:55 Heathrow, London (LHR) 4 04:35 Doha (DOH)
QR 12 Non-stop Airbus A350-1000 (351) 6:40 Effective 2024-03-21 through 2024-03-23
The flight arrives 1 day after departure.
Sat,Sun 18:55 Heathrow, London (LHR) 4 04:35 Doha (DOH)
QR 12 Non-stop Boeing 777-300ER (77W) 6:40 Effective 2024-03-24 through 2024-03-30
The flight arrives 1 day after departure.
Mon-Thu 18:55 Heathrow, London (LHR) 4 04:35 Doha (DOH)
QR 12 Non-stop Airbus A350-900 (359) 6:40 Effective 2024-03-25 through 2024-03-28
The flight arrives 1 day after departure.
Fri 18:55 Heathrow, London (LHR) 4 04:35 Doha (DOH)
QR 12 Non-stop Airbus A350-1000 (351) 6:40 Operates only on 2024-03-29
The flight arrives 1 day after departure.
Daily 18:55 Heathrow, London (LHR) 4 04:35 Doha (DOH)
QR 12 Non-stop Airbus A350-900 (359) 6:40 Effective from 2024-10-27
The flight arrives 1 day after departure.
Sun 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Airbus A350-1000 (351) 6:45 Operates only on 2024-03-31
The flight arrives 1 day after departure.
Mon,Tue,Thu-Sun 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Boeing 777-300ER (77W) 6:45 Effective 2024-04-01 through 2024-04-09
The flight arrives 1 day after departure.
Wed 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Airbus A350-900 (359) 6:45 Operates only on 2024-04-03
The flight arrives 1 day after departure.
Mon-Thu,Sat,Sun 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Boeing 777-300ER (77W) 6:45 Effective 2024-04-10 through 2024-04-18
The flight arrives 1 day after departure.
Fri 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Airbus A350-1000 (351) 6:45 Operates only on 2024-04-12
The flight arrives 1 day after departure.
Mon,Tue,Thu-Sun 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Boeing 777-300ER (77W) 6:45 Effective 2024-04-19 through 2024-05-02
The flight arrives 1 day after departure.
Wed 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Boeing 777-200LR (77L) 6:45 Effective 2024-04-24 through 2024-05-01
The flight arrives 1 day after departure.
Tue-Fri 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Boeing 777-200LR (77L) 6:45 Effective 2024-05-03 through 2024-05-15
The flight arrives 1 day after departure.
Mon,Sat,Sun 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Boeing 777-300ER (77W) 6:45 Effective 2024-05-04 through 2024-05-13
The flight arrives 1 day after departure.
Mon,Tue,Thu,Sat,Sun 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Boeing 777-300ER (77W) 6:45 Effective 2024-05-16 through 2024-05-21
The flight arrives 1 day after departure.
Wed-Fri 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Boeing 777-200LR (77L) 6:45 Effective 2024-05-17 through 2024-05-24
The flight arrives 1 day after departure.
Thu,Sat 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Boeing 777-300ER (77W) 6:45 Effective 2024-05-25 through 2024-06-01
The flight arrives 1 day after departure.
Mon-Wed,Fri,Sun 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Boeing 777-200LR (77L) 6:45 Effective 2024-05-26 through 2024-05-31
The flight arrives 1 day after departure.
Sat,Sun 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Boeing 777-300ER (77W) 6:45 Effective 2024-06-02 through 2024-06-09
The flight arrives 1 day after departure.
Mon-Fri 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Airbus A350-900 (359) 6:45 Effective 2024-06-03 through 2024-06-07
The flight arrives 1 day after departure.
Mon,Tue,Sat,Sun 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Boeing 777-300ER (77W) 6:45 Effective 2024-06-10 through 2024-06-16
The flight arrives 1 day after departure.
Mon-Fri 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Airbus A350-900 (359) 6:45 Effective 2024-06-12 through 2024-06-18
The flight arrives 1 day after departure.
Wed,Thu,Sat,Sun 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Boeing 777-300ER (77W) 6:45 Effective 2024-06-19 through 2024-06-23
The flight arrives 1 day after departure.
Thu,Fri 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Airbus A350-900 (359) 6:45 Effective 2024-06-21 through 2024-06-28
The flight arrives 1 day after departure.
Mon 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Airbus A350-1000 (351) 6:45 Operates only on 2024-06-24
The flight arrives 1 day after departure.
Tue,Wed 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Boeing 777-200LR (77L) 6:45 Effective 2024-06-25 through 2024-06-26
The flight arrives 1 day after departure.
Mon,Tue,Sat,Sun 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Boeing 777-300ER (77W) 6:45 Effective 2024-06-29 through 2024-07-06
The flight arrives 1 day after departure.
Mon,Wed-Fri,Sun 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Airbus A350-900 (359) 6:45 Effective 2024-07-03 through 2024-07-08
The flight arrives 1 day after departure.
Daily 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Boeing 777-300ER (77W) 6:45 Effective 2024-07-09 through 2024-07-15
The flight arrives 1 day after departure.
Tue 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Boeing 777-200LR (77L) 6:45 Operates only on 2024-07-16
The flight arrives 1 day after departure.
Mon-Thu 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Airbus A350-900 (359) 6:45 Effective 2024-07-17 through 2024-07-23
The flight arrives 1 day after departure.
Thu-Sun 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Boeing 777-300ER (77W) 6:45 Effective 2024-07-19 through 2024-07-25
The flight arrives 1 day after departure.
Wed,Fri 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Airbus A350-1000 (351) 6:45 Effective 2024-07-24 through 2024-07-26
The flight arrives 1 day after departure.
Mon,Tue,Sat,Sun 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Boeing 777-300ER (77W) 6:45 Effective 2024-07-27 through 2024-07-30
The flight arrives 1 day after departure.
Mon-Sat 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Airbus A350-900 (359) 6:45 Effective 2024-07-31 through 2024-08-07
The flight arrives 1 day after departure.
Thu,Sat,Sun 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Boeing 777-300ER (77W) 6:45 Effective 2024-08-04 through 2024-08-10
The flight arrives 1 day after departure.
Mon-Wed,Fri,Sun 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Airbus A350-900 (359) 6:45 Effective 2024-08-09 through 2024-08-14
The flight arrives 1 day after departure.
Tue,Thu,Sat,Sun 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Boeing 777-300ER (77W) 6:45 Effective 2024-08-15 through 2024-08-22
The flight arrives 1 day after departure.
Fri 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Boeing 777-200LR (77L) 6:45 Operates only on 2024-08-16
The flight arrives 1 day after departure.
Mon,Wed 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Airbus A350-900 (359) 6:45 Effective 2024-08-19 through 2024-08-21
The flight arrives 1 day after departure.
Mon,Tue,Fri-Sun 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Boeing 777-300ER (77W) 6:45 Effective 2024-08-23 through 2024-08-27
The flight arrives 1 day after departure.
Tue-Thu,Sat 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Airbus A350-900 (359) 6:45 Effective 2024-08-28 through 2024-09-03
The flight arrives 1 day after departure.
Fri 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Boeing 777-200LR (77L) 6:45 Operates only on 2024-08-30
The flight arrives 1 day after departure.
Mon,Wed,Thu,Sat,Sun 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Boeing 777-300ER (77W) 6:45 Effective 2024-09-01 through 2024-09-09
The flight arrives 1 day after departure.
Fri 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Airbus A350-1000 (351) 6:45 Operates only on 2024-09-06
The flight arrives 1 day after departure.
Daily 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Boeing 777-300ER (77W) 6:45 Effective 2024-09-10 through 2024-09-22
The flight arrives 1 day after departure.
Mon 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Boeing 777-200LR (77L) 6:45 Operates only on 2024-09-23
The flight arrives 1 day after departure.
Daily 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Boeing 777-300ER (77W) 6:45 Effective 2024-09-24 through 2024-09-30
The flight arrives 1 day after departure.
Tue,Thu 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Airbus A350-1000 (351) 6:45 Effective 2024-10-01 through 2024-10-03
The flight arrives 1 day after departure.
Wed 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Airbus A350-900 (359) 6:45 Operates only on 2024-10-02
The flight arrives 1 day after departure.
Mon,Tue,Fri-Sun 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Boeing 777-300ER (77W) 6:45 Effective 2024-10-04 through 2024-10-08
The flight arrives 1 day after departure.
Wed 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Boeing 777-200LR (77L) 6:45 Operates only on 2024-10-09
The flight arrives 1 day after departure.
Mon,Thu-Sat 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Airbus A350-1000 (351) 6:45 Effective 2024-10-10 through 2024-10-17
The flight arrives 1 day after departure.
Tue,Fri,Sun 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Boeing 777-300ER (77W) 6:45 Effective 2024-10-13 through 2024-10-22
The flight arrives 1 day after departure.
Wed 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Airbus A350-900 (359) 6:45 Operates only on 2024-10-16
The flight arrives 1 day after departure.
Mon,Wed,Sat 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Airbus A350-1000 (351) 6:45 Effective 2024-10-19 through 2024-10-23
The flight arrives 1 day after departure.
Thu,Sat 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Boeing 777-300ER (77W) 6:45 Effective 2024-10-24 through 2024-10-26
The flight arrives 1 day after departure.
Fri 19:45 Heathrow, London (LHR) 4 04:30 Doha (DOH)
QR 12 Non-stop Boeing 777-200LR (77L) 6:45 Operates only on 2024-10-25
The flight arrives 1 day after departure.
Qatar Airways flight QR 12:
Heathrow, London - Doha
Select flight date:
FLIGHT SCHEDULE
Direct Flights:

Qatar Airways QR12
Valid until 2024-01-07
Mon
Tue
Wed
Thu
Fri
-
Sat
-
Sun
Duration: 6:40, non-stop
Boeing 777-300ER (77W)
The flight arrives 1 day after departure.

Qatar Airways QR12
Operates only on 2024-01-05
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 6:40, non-stop
Airbus A350-1000 (351)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-01-06 through 2024-01-08
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 6:40, non-stop
Airbus A350-900 (359)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-01-09 through 2024-01-15
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 6:40, non-stop
Boeing 777-300ER (77W)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-01-16 through 2024-01-22
Mon
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 6:40, non-stop
Airbus A350-900 (359)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-01-17 through 2024-01-24
Mon
-
Tue
-
Wed
Thu
Fri
Sat
-
Sun
Duration: 6:40, non-stop
Airbus A350-1000 (351)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-01-20 through 2024-01-25
Mon
-
Tue
Wed
-
Thu
Fri
-
Sat
Sun
-
Duration: 6:40, non-stop
Boeing 777-300ER (77W)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-01-26 through 2024-02-02
Mon
-
Tue
Wed
-
Thu
Fri
Sat
Sun
-
Duration: 6:40, non-stop
Airbus A350-900 (359)
The flight arrives 1 day after departure.

Qatar Airways QR12
Operates only on 2024-01-28
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 6:40, non-stop
Airbus A350-1000 (351)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-01-29 through 2024-02-04
Mon
Tue
-
Wed
Thu
-
Fri
-
Sat
Sun
Duration: 6:40, non-stop
Boeing 777-300ER (77W)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-02-05 through 2024-02-12
Mon
Tue
-
Wed
Thu
Fri
Sat
-
Sun
Duration: 6:40, non-stop
Airbus A350-1000 (351)
The flight arrives 1 day after departure.

Qatar Airways QR12
Operates only on 2024-02-06
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 6:40, non-stop
Airbus A350-900 (359)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-02-10 through 2024-02-17
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
Sun
-
Duration: 6:40, non-stop
Boeing 777-300ER (77W)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-02-13 through 2024-02-21
Mon
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
Duration: 6:40, non-stop
Airbus A350-1000 (351)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-02-15 through 2024-02-22
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 6:40, non-stop
Airbus A350-900 (359)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-02-23 through 2024-02-25
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
Sun
Duration: 6:40, non-stop
Airbus A350-900 (359)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-02-26 through 2024-03-04
Mon
Tue
Wed
Thu
-
Fri
Sat
-
Sun
-
Duration: 6:40, non-stop
Airbus A350-1000 (351)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-02-29 through 2024-03-05
Mon
-
Tue
Wed
-
Thu
Fri
-
Sat
-
Sun
Duration: 6:40, non-stop
Boeing 777-300ER (77W)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-03-02 through 2024-03-09
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
Sun
-
Duration: 6:40, non-stop
Airbus A350-900 (359)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-03-07 through 2024-03-10
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
Duration: 6:40, non-stop
Airbus A350-1000 (351)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-03-08 through 2024-03-13
Mon
Tue
Wed
Thu
-
Fri
Sat
-
Sun
-
Duration: 6:40, non-stop
Boeing 777-300ER (77W)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-03-14 through 2024-03-18
Mon
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
Duration: 6:40, non-stop
Airbus A350-900 (359)
The flight arrives 1 day after departure.

Qatar Airways QR12
Operates only on 2024-03-15
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 6:40, non-stop
Boeing 777-200LR (77L)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-03-16 through 2024-03-22
Mon
-
Tue
Wed
Thu
-
Fri
Sat
Sun
-
Duration: 6:40, non-stop
Boeing 777-300ER (77W)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-03-21 through 2024-03-23
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
Sun
-
Duration: 6:40, non-stop
Airbus A350-1000 (351)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-03-24 through 2024-03-30
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
Duration: 6:40, non-stop
Boeing 777-300ER (77W)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-03-25 through 2024-03-28
Mon
Tue
Wed
Thu
Fri
-
Sat
-
Sun
-
Duration: 6:40, non-stop
Airbus A350-900 (359)
The flight arrives 1 day after departure.

Qatar Airways QR12
Operates only on 2024-03-29
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 6:40, non-stop
Airbus A350-1000 (351)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective from 2024-10-27
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 6:40, non-stop
Airbus A350-900 (359)
The flight arrives 1 day after departure.

Qatar Airways QR12
Operates only on 2024-03-31
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 6:45, non-stop
Airbus A350-1000 (351)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-04-01 through 2024-04-09
Mon
Tue
Wed
-
Thu
Fri
Sat
Sun
Duration: 6:45, non-stop
Boeing 777-300ER (77W)
The flight arrives 1 day after departure.

Qatar Airways QR12
Operates only on 2024-04-03
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 6:45, non-stop
Airbus A350-900 (359)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-04-10 through 2024-04-18
Mon
Tue
Wed
Thu
Fri
-
Sat
Sun
Duration: 6:45, non-stop
Boeing 777-300ER (77W)
The flight arrives 1 day after departure.

Qatar Airways QR12
Operates only on 2024-04-12
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 6:45, non-stop
Airbus A350-1000 (351)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-04-19 through 2024-05-02
Mon
Tue
Wed
-
Thu
Fri
Sat
Sun
Duration: 6:45, non-stop
Boeing 777-300ER (77W)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-04-24 through 2024-05-01
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 6:45, non-stop
Boeing 777-200LR (77L)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-05-03 through 2024-05-15
Mon
-
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Duration: 6:45, non-stop
Boeing 777-200LR (77L)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-05-04 through 2024-05-13
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
Duration: 6:45, non-stop
Boeing 777-300ER (77W)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-05-16 through 2024-05-21
Mon
Tue
Wed
-
Thu
Fri
-
Sat
Sun
Duration: 6:45, non-stop
Boeing 777-300ER (77W)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-05-17 through 2024-05-24
Mon
-
Tue
-
Wed
Thu
Fri
Sat
-
Sun
-
Duration: 6:45, non-stop
Boeing 777-200LR (77L)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-05-25 through 2024-06-01
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
Sun
-
Duration: 6:45, non-stop
Boeing 777-300ER (77W)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-05-26 through 2024-05-31
Mon
Tue
Wed
Thu
-
Fri
Sat
-
Sun
Duration: 6:45, non-stop
Boeing 777-200LR (77L)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-06-02 through 2024-06-09
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
Duration: 6:45, non-stop
Boeing 777-300ER (77W)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-06-03 through 2024-06-07
Mon
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Duration: 6:45, non-stop
Airbus A350-900 (359)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-06-10 through 2024-06-16
Mon
Tue
Wed
-
Thu
-
Fri
-
Sat
Sun
Duration: 6:45, non-stop
Boeing 777-300ER (77W)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-06-12 through 2024-06-18
Mon
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Duration: 6:45, non-stop
Airbus A350-900 (359)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-06-19 through 2024-06-23
Mon
-
Tue
-
Wed
Thu
Fri
-
Sat
Sun
Duration: 6:45, non-stop
Boeing 777-300ER (77W)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-06-21 through 2024-06-28
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 6:45, non-stop
Airbus A350-900 (359)
The flight arrives 1 day after departure.

Qatar Airways QR12
Operates only on 2024-06-24
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 6:45, non-stop
Airbus A350-1000 (351)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-06-25 through 2024-06-26
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 6:45, non-stop
Boeing 777-200LR (77L)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-06-29 through 2024-07-06
Mon
Tue
Wed
-
Thu
-
Fri
-
Sat
Sun
Duration: 6:45, non-stop
Boeing 777-300ER (77W)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-07-03 through 2024-07-08
Mon
Tue
-
Wed
Thu
Fri
Sat
-
Sun
Duration: 6:45, non-stop
Airbus A350-900 (359)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-07-09 through 2024-07-15
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 6:45, non-stop
Boeing 777-300ER (77W)
The flight arrives 1 day after departure.

Qatar Airways QR12
Operates only on 2024-07-16
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 6:45, non-stop
Boeing 777-200LR (77L)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-07-17 through 2024-07-23
Mon
Tue
Wed
Thu
Fri
-
Sat
-
Sun
-
Duration: 6:45, non-stop
Airbus A350-900 (359)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-07-19 through 2024-07-25
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
Sun
Duration: 6:45, non-stop
Boeing 777-300ER (77W)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-07-24 through 2024-07-26
Mon
-
Tue
-
Wed
Thu
-
Fri
Sat
-
Sun
-
Duration: 6:45, non-stop
Airbus A350-1000 (351)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-07-27 through 2024-07-30
Mon
Tue
Wed
-
Thu
-
Fri
-
Sat
Sun
Duration: 6:45, non-stop
Boeing 777-300ER (77W)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-07-31 through 2024-08-07
Mon
Tue
Wed
Thu
Fri
Sat
Sun
-
Duration: 6:45, non-stop
Airbus A350-900 (359)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-08-04 through 2024-08-10
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
Sun
Duration: 6:45, non-stop
Boeing 777-300ER (77W)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-08-09 through 2024-08-14
Mon
Tue
Wed
Thu
-
Fri
Sat
-
Sun
Duration: 6:45, non-stop
Airbus A350-900 (359)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-08-15 through 2024-08-22
Mon
-
Tue
Wed
-
Thu
Fri
-
Sat
Sun
Duration: 6:45, non-stop
Boeing 777-300ER (77W)
The flight arrives 1 day after departure.

Qatar Airways QR12
Operates only on 2024-08-16
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 6:45, non-stop
Boeing 777-200LR (77L)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-08-19 through 2024-08-21
Mon
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 6:45, non-stop
Airbus A350-900 (359)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-08-23 through 2024-08-27
Mon
Tue
Wed
-
Thu
-
Fri
Sat
Sun
Duration: 6:45, non-stop
Boeing 777-300ER (77W)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-08-28 through 2024-09-03
Mon
-
Tue
Wed
Thu
Fri
-
Sat
Sun
-
Duration: 6:45, non-stop
Airbus A350-900 (359)
The flight arrives 1 day after departure.

Qatar Airways QR12
Operates only on 2024-08-30
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 6:45, non-stop
Boeing 777-200LR (77L)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-09-01 through 2024-09-09
Mon
Tue
-
Wed
Thu
Fri
-
Sat
Sun
Duration: 6:45, non-stop
Boeing 777-300ER (77W)
The flight arrives 1 day after departure.

Qatar Airways QR12
Operates only on 2024-09-06
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 6:45, non-stop
Airbus A350-1000 (351)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-09-10 through 2024-09-22
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 6:45, non-stop
Boeing 777-300ER (77W)
The flight arrives 1 day after departure.

Qatar Airways QR12
Operates only on 2024-09-23
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 6:45, non-stop
Boeing 777-200LR (77L)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-09-24 through 2024-09-30
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 6:45, non-stop
Boeing 777-300ER (77W)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-10-01 through 2024-10-03
Mon
-
Tue
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 6:45, non-stop
Airbus A350-1000 (351)
The flight arrives 1 day after departure.

Qatar Airways QR12
Operates only on 2024-10-02
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 6:45, non-stop
Airbus A350-900 (359)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-10-04 through 2024-10-08
Mon
Tue
Wed
-
Thu
-
Fri
Sat
Sun
Duration: 6:45, non-stop
Boeing 777-300ER (77W)
The flight arrives 1 day after departure.

Qatar Airways QR12
Operates only on 2024-10-09
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 6:45, non-stop
Boeing 777-200LR (77L)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-10-10 through 2024-10-17
Mon
Tue
-
Wed
-
Thu
Fri
Sat
Sun
-
Duration: 6:45, non-stop
Airbus A350-1000 (351)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-10-13 through 2024-10-22
Mon
-
Tue
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 6:45, non-stop
Boeing 777-300ER (77W)
The flight arrives 1 day after departure.

Qatar Airways QR12
Operates only on 2024-10-16
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 6:45, non-stop
Airbus A350-900 (359)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-10-19 through 2024-10-23
Mon
Tue
-
Wed
Thu
-
Fri
-
Sat
Sun
-
Duration: 6:45, non-stop
Airbus A350-1000 (351)
The flight arrives 1 day after departure.

Qatar Airways QR12
Effective 2024-10-24 through 2024-10-26
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
Sun
-
Duration: 6:45, non-stop
Boeing 777-300ER (77W)
The flight arrives 1 day after departure.

Qatar Airways QR12
Operates only on 2024-10-25
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 6:45, non-stop
Boeing 777-200LR (77L)
The flight arrives 1 day after departure.
  • QR 12 is an international flight departing from Heathrow, London airport, United Kingdom (LHR) and arriving at Doha airport, Qatar (DOH).
  • The flight distance is 3254 miles, or 5237 km.
  • The timezone of the departure airport is UTC+0 , and the timezone of the arrival airport is UTC+3 . Current time at the point of departure is (loading...), and (loading...) at the point of arrival. There is a (loading...) hour time difference between the airports.
  • For direct flights, the flight time varies between 6:40 and 6:45.