LENTOAIKATAULU |
---|
Suorat lennot: |
Ti
07:15
London Stansted (STN)
10:05
Grenoble-Isere, Lyon (GNB) Ryanair FR 1253 Non-stop Boeing 737-800 (73H) 1:50 Effective 2024-12-17 through 2025-03-25 |
La
07:50
London Stansted (STN)
10:40
Grenoble-Isere, Lyon (GNB) Ryanair FR 1253 Non-stop Boeing 737-800 (73H) 1:50 Effective 2024-12-14 through 2025-03-29 |
To
11:30
London Stansted (STN)
14:20
Grenoble-Isere, Lyon (GNB) Ryanair FR 1253 Non-stop Boeing 737-800 (73H) 1:50 Effective 2024-12-19 through 2025-03-27 |
Su
12:20
London Stansted (STN)
15:10
Grenoble-Isere, Lyon (GNB) Ryanair FR 1253 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Effective 2024-12-15 through 2025-03-23 |
La
06:50
London Stansted (STN)
09:40
Grenoble-Isere, Lyon (GNB) Jet2 LS 1437 Non-stop Boeing 737-800 (73H) 1:50 Effective 2024-12-14 through 2025-03-29 |
La
09:05
London Stansted (STN)
11:55
Grenoble-Isere, Lyon (GNB) Jet2 LS 1437 Non-stop Boeing 737-800 (73H) 1:50 Effective 2025-04-05 through 2025-04-19 |
La
15:55
London Stansted (STN)
18:45
Grenoble-Isere, Lyon (GNB) Ryanair FR 2188 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Effective 2024-12-14 through 2025-03-29 |