Kaikkien lentoyhtiöiden lennot: Sacramento (SMF) - Dallas Love Field (DAL).

Valitse lentopäivä:
LENTOAIKATAULU
Suorat lennot:
Su 06:00 Sacramento (SMF) B 11:20 Dallas Love Field (DAL) 1
Southwest Airlines WN 21 Non-stop Boeing 737 MAX 8 (7M8) 3:20 Effective 2026-03-08 through 2026-04-05
Ke,To 05:55 Sacramento (SMF) B 11:15 Dallas Love Field (DAL) 1
Southwest Airlines WN 209 Non-stop Boeing 737-700 (73W) 3:20 Valid until 2026-01-01
Ma,To,Pe 05:20 Sacramento (SMF) B 10:35 Dallas Love Field (DAL) 1
Southwest Airlines WN 391 Non-stop Boeing 737 MAX 8 (7M8) 3:15 Effective 2026-03-05 through 2026-04-06
Ti,Ke 05:30 Sacramento (SMF) B 10:45 Dallas Love Field (DAL) 1
Southwest Airlines WN 391 Non-stop Boeing 737-800 (73H) 3:15 Effective 2026-03-10 through 2026-04-01
La 15:40 Sacramento (SMF) B 20:55 Dallas Love Field (DAL) 1
Southwest Airlines WN 391 Non-stop Boeing 737-700 (Scimitar Winglets) 3:15 Effective 2026-03-07 through 2026-04-04
Ma,To,Pe 13:00 Sacramento (SMF) B 18:15 Dallas Love Field (DAL) 1
Southwest Airlines WN 644 Non-stop Boeing 737 MAX 8 (7M8) 3:15 Effective 2026-03-05 through 2026-04-06
Ma,To,Pe 05:00 Sacramento (SMF) B 10:15 Dallas Love Field (DAL) 1
Southwest Airlines WN 1290 Non-stop Boeing 737-800 (73H) 3:15 Effective 2026-04-09 through 2026-06-01
Ti,Ke 05:15 Sacramento (SMF) B 10:30 Dallas Love Field (DAL) 1
Southwest Airlines WN 1290 Non-stop Boeing 737-800 (73H) 3:15 Effective 2026-04-07 through 2026-06-03
Su 17:05 Sacramento (SMF) B 22:25 Dallas Love Field (DAL) 1
Southwest Airlines WN 1290 Non-stop Boeing 737-700 (Scimitar Winglets) 3:20 Operates only on 2026-05-24
Su 17:35 Sacramento (SMF) B 22:55 Dallas Love Field (DAL) 1
Southwest Airlines WN 1290 Non-stop Boeing 737 MAX 8 (7M8) 3:20 Effective 2026-04-12 through 2026-05-17
Su 17:35 Sacramento (SMF) B 22:55 Dallas Love Field (DAL) 1
Southwest Airlines WN 1290 Non-stop Boeing 737 MAX 8 (7M8) 3:20 Operates only on 2026-05-31
La 05:00 Sacramento (SMF) B 10:20 Dallas Love Field (DAL) 1
Southwest Airlines WN 1359 Non-stop Boeing 737-800 (73H) 3:20 Effective 2026-06-06 through 2026-08-01
Su 05:05 Sacramento (SMF) B 10:20 Dallas Love Field (DAL) 1
Southwest Airlines WN 1536 Non-stop Boeing 737 MAX 8 (7M8) 3:15 Effective 2026-06-07 through 2026-08-02
La 14:45 Sacramento (SMF) B 20:00 Dallas Love Field (DAL) 1
Southwest Airlines WN 1565 Non-stop Boeing 737-800 (73H) 3:15 Valid until 2026-01-03
Ma 15:45 Sacramento (SMF) B 21:00 Dallas Love Field (DAL) 1
Southwest Airlines WN 1709 Non-stop Boeing 737 MAX 8 (7M8) 3:15 Operates only on 2026-01-05
Ti,Ke 14:50 Sacramento (SMF) B 20:05 Dallas Love Field (DAL) 1
Southwest Airlines WN 2050 Non-stop Boeing 737-800 (73H) 3:15 Effective 2026-03-10 through 2026-04-01
La 05:00 Sacramento (SMF) B 10:15 Dallas Love Field (DAL) 1
Southwest Airlines WN 2252 Non-stop Boeing 737 MAX 8 (7M8) 3:15 Valid until 2026-01-03
Ma 05:15 Sacramento (SMF) B 10:30 Dallas Love Field (DAL) 1
Southwest Airlines WN 2252 Non-stop Boeing 737-800 (73H) 3:15 Operates only on 2026-01-05
Ma,Ti,Pe,Su 05:20 Sacramento (SMF) B 10:35 Dallas Love Field (DAL) 1
Southwest Airlines WN 2252 Non-stop Boeing 737-800 (73H) 3:15 Valid until 2026-01-04
Ma,To,Pe 14:55 Sacramento (SMF) B 20:15 Dallas Love Field (DAL) 1
Southwest Airlines WN 2395 Non-stop Boeing 737-700 (Scimitar Winglets) 3:20 Effective 2026-04-09 through 2026-06-01
Su 13:15 Sacramento (SMF) B 18:30 Dallas Love Field (DAL) 1
Southwest Airlines WN 2515 Non-stop Boeing 737-700 (Scimitar Winglets) 3:15 Operates only on 2026-01-04
Pe 12:55 Sacramento (SMF) B 18:10 Dallas Love Field (DAL) 1
Southwest Airlines WN 2627 Non-stop Boeing 737-700 (Scimitar Winglets) 3:15 Operates only on 2026-01-02
Ma,To,Pe 06:15 Sacramento (SMF) B 11:30 Dallas Love Field (DAL) 1
Southwest Airlines WN 2699 Non-stop Boeing 737-800 (73H) 3:15 Effective 2026-08-06 through 2026-09-28
Su 13:55 Sacramento (SMF) B 19:10 Dallas Love Field (DAL) 1
Southwest Airlines WN 2699 Non-stop Boeing 737 MAX 8 (7M8) 3:15 Effective 2026-08-09 through 2026-09-27
Ke,To 13:40 Sacramento (SMF) B 18:55 Dallas Love Field (DAL) 1
Southwest Airlines WN 2700 Non-stop Boeing 737 MAX 8 (7M8) 3:15 Valid until 2026-01-01
La 12:35 Sacramento (SMF) B 17:55 Dallas Love Field (DAL) 1
Southwest Airlines WN 3243 Non-stop Boeing 737 MAX 8 (7M8) 3:20 Effective 2026-04-11 through 2026-05-30
Ti,Ke 13:05 Sacramento (SMF) B 18:25 Dallas Love Field (DAL) 1
Southwest Airlines WN 3243 Non-stop Boeing 737-700 (Scimitar Winglets) 3:20 Effective 2026-04-07 through 2026-06-03
La 11:00 Sacramento (SMF) B 16:15 Dallas Love Field (DAL) 1
Southwest Airlines WN 3584 Non-stop Boeing 737 MAX 8 (7M8) 3:15 Effective 2026-08-08 through 2026-09-26
Ma,To,Pe 15:30 Sacramento (SMF) B 20:45 Dallas Love Field (DAL) 1
Southwest Airlines WN 3584 Non-stop Boeing 737-800 (73H) 3:15 Effective 2026-08-06 through 2026-09-28
To,Pe,Su 05:30 Sacramento (SMF) B 10:45 Dallas Love Field (DAL) 1
Southwest Airlines WN 3681 Non-stop Boeing 737 MAX 8 (7M8) 3:15 Effective 2026-01-11 through 2026-01-16
Ma,Su 05:30 Sacramento (SMF) B 10:45 Dallas Love Field (DAL) 1
Southwest Airlines WN 3681 Non-stop Boeing 737 MAX 8 (7M8) 3:15 Effective 2026-01-19 through 2026-01-25
To,Pe,Su 05:30 Sacramento (SMF) B 10:45 Dallas Love Field (DAL) 1
Southwest Airlines WN 3681 Non-stop Boeing 737 MAX 8 (7M8) 3:15 Effective 2026-02-01 through 2026-02-06
Ma,Su 05:30 Sacramento (SMF) B 10:45 Dallas Love Field (DAL) 1
Southwest Airlines WN 3681 Non-stop Boeing 737 MAX 8 (7M8) 3:15 Effective 2026-02-09 through 2026-02-15
Ma,Ti,To 05:30 Sacramento (SMF) B 10:45 Dallas Love Field (DAL) 1
Southwest Airlines WN 3681 Non-stop Boeing 737 MAX 8 (7M8) 3:15 Effective 2026-02-17 through 2026-02-23
Ma 05:30 Sacramento (SMF) B 10:45 Dallas Love Field (DAL) 1
Southwest Airlines WN 3681 Non-stop Boeing 737 MAX 8 (7M8) 3:15 Operates only on 2026-03-02
La 14:40 Sacramento (SMF) B 20:00 Dallas Love Field (DAL) 1
Southwest Airlines WN 3772 Non-stop Boeing 737 MAX 8 (7M8) 3:20 Effective 2026-06-06 through 2026-08-01
Su 15:15 Sacramento (SMF) B 20:35 Dallas Love Field (DAL) 1
Southwest Airlines WN 3772 Non-stop Boeing 737-800 (73H) 3:20 Effective 2026-06-07 through 2026-08-02
Ti,Ke 15:40 Sacramento (SMF) B 21:00 Dallas Love Field (DAL) 1
Southwest Airlines WN 3772 Non-stop Boeing 737-700 (Scimitar Winglets) 3:20 Effective 2026-06-09 through 2026-07-29
Ma,To,Pe 17:25 Sacramento (SMF) B 22:45 Dallas Love Field (DAL) 1
Southwest Airlines WN 3772 Non-stop Boeing 737 MAX 8 (7M8) 3:20 Effective 2026-06-04 through 2026-08-03
Su 05:40 Sacramento (SMF) B 10:55 Dallas Love Field (DAL) 1
Southwest Airlines WN 3850 Non-stop Boeing 737 MAX 8 (7M8) 3:15 Effective 2026-04-12 through 2026-05-17
Su 05:40 Sacramento (SMF) B 10:55 Dallas Love Field (DAL) 1
Southwest Airlines WN 3850 Non-stop Boeing 737 MAX 8 (7M8) 3:15 Operates only on 2026-05-31
La 06:35 Sacramento (SMF) B 11:50 Dallas Love Field (DAL) 1
Southwest Airlines WN 3850 Non-stop Boeing 737 MAX 8 (7M8) 3:15 Effective 2026-04-11 through 2026-05-30
Su 07:00 Sacramento (SMF) B 12:15 Dallas Love Field (DAL) 1
Southwest Airlines WN 3850 Non-stop Boeing 737-800 (73H) 3:15 Operates only on 2026-05-24
Ma-Pe 09:35 Sacramento (SMF) B 14:50 Dallas Love Field (DAL) 1
Southwest Airlines WN 4212 Non-stop Boeing 737-800 (73H) 3:15 Effective 2026-01-06 through 2026-01-14
Ti-Pe,Su 09:35 Sacramento (SMF) B 14:50 Dallas Love Field (DAL) 1
Southwest Airlines WN 4212 Non-stop Boeing 737-800 (73H) 3:15 Effective 2026-01-18 through 2026-01-23
Ma-Pe 09:35 Sacramento (SMF) B 14:50 Dallas Love Field (DAL) 1
Southwest Airlines WN 4212 Non-stop Boeing 737-800 (73H) 3:15 Effective 2026-01-26 through 2026-02-04
Ti,Ke,Su 09:35 Sacramento (SMF) B 14:50 Dallas Love Field (DAL) 1
Southwest Airlines WN 4212 Non-stop Boeing 737-800 (73H) 3:15 Effective 2026-02-08 through 2026-02-11
Ti,Ke 09:35 Sacramento (SMF) B 14:50 Dallas Love Field (DAL) 1
Southwest Airlines WN 4212 Non-stop Boeing 737-800 (73H) 3:15 Effective 2026-02-18 through 2026-03-04
To,Pe,Su 13:35 Sacramento (SMF) B 18:50 Dallas Love Field (DAL) 1
Southwest Airlines WN 4212 Non-stop Boeing 737-800 (73H) 3:15 Effective 2026-01-11 through 2026-01-16
Ma,Su 13:35 Sacramento (SMF) B 18:50 Dallas Love Field (DAL) 1
Southwest Airlines WN 4212 Non-stop Boeing 737-800 (73H) 3:15 Effective 2026-01-19 through 2026-01-25
1 2 3   next


Kaikkien lentoyhtiöiden lennot: Sacramento (SMF) - Dallas Love Field (DAL).
Valitse lentopäivä:
LENTOAIKATAULU
Suorat lennot:

Effective 2026-03-08 through 2026-04-05
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 3:20, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Valid until 2026-01-01
Ma
-
Ti
-
Ke
To
Pe
-
La
-
Su
-
Duration: 3:20, non-stop
Boeing 737-700 (73W)

Suorat lennot:

Effective 2026-03-05 through 2026-04-06
Ma
Ti
-
Ke
-
To
Pe
La
-
Su
-
Duration: 3:15, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Effective 2026-03-10 through 2026-04-01
Ma
-
Ti
Ke
To
-
Pe
-
La
-
Su
-
Duration: 3:15, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Effective 2026-03-07 through 2026-04-04
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 3:15, non-stop
Boeing 737-700 (Scimitar Winglets)

Suorat lennot:

Effective 2026-03-05 through 2026-04-06
Ma
Ti
-
Ke
-
To
Pe
La
-
Su
-
Duration: 3:15, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Effective 2026-04-09 through 2026-06-01
Ma
Ti
-
Ke
-
To
Pe
La
-
Su
-
Duration: 3:15, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Effective 2026-04-07 through 2026-06-03
Ma
-
Ti
Ke
To
-
Pe
-
La
-
Su
-
Duration: 3:15, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Operates only on 2026-05-24
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 3:20, non-stop
Boeing 737-700 (Scimitar Winglets)

Suorat lennot:

Effective 2026-04-12 through 2026-05-17
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 3:20, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Operates only on 2026-05-31
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 3:20, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Effective 2026-06-06 through 2026-08-01
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 3:20, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Effective 2026-06-07 through 2026-08-02
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 3:15, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Valid until 2026-01-03
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 3:15, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Operates only on 2026-01-05
Ma
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 3:15, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Effective 2026-03-10 through 2026-04-01
Ma
-
Ti
Ke
To
-
Pe
-
La
-
Su
-
Duration: 3:15, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Valid until 2026-01-03
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 3:15, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Operates only on 2026-01-05
Ma
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 3:15, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Valid until 2026-01-04
Ma
Ti
Ke
-
To
-
Pe
La
-
Su
Duration: 3:15, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Effective 2026-04-09 through 2026-06-01
Ma
Ti
-
Ke
-
To
Pe
La
-
Su
-
Duration: 3:20, non-stop
Boeing 737-700 (Scimitar Winglets)

Suorat lennot:

Operates only on 2026-01-04
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 3:15, non-stop
Boeing 737-700 (Scimitar Winglets)

Suorat lennot:

Operates only on 2026-01-02
Ma
-
Ti
-
Ke
-
To
-
Pe
La
-
Su
-
Duration: 3:15, non-stop
Boeing 737-700 (Scimitar Winglets)

Suorat lennot:

Effective 2026-08-06 through 2026-09-28
Ma
Ti
-
Ke
-
To
Pe
La
-
Su
-
Duration: 3:15, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Effective 2026-08-09 through 2026-09-27
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 3:15, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Valid until 2026-01-01
Ma
-
Ti
-
Ke
To
Pe
-
La
-
Su
-
Duration: 3:15, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Effective 2026-04-11 through 2026-05-30
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 3:20, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Effective 2026-04-07 through 2026-06-03
Ma
-
Ti
Ke
To
-
Pe
-
La
-
Su
-
Duration: 3:20, non-stop
Boeing 737-700 (Scimitar Winglets)

Suorat lennot:

Effective 2026-08-08 through 2026-09-26
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 3:15, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Effective 2026-08-06 through 2026-09-28
Ma
Ti
-
Ke
-
To
Pe
La
-
Su
-
Duration: 3:15, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Effective 2026-01-11 through 2026-01-16
Ma
-
Ti
-
Ke
-
To
Pe
La
-
Su
Duration: 3:15, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Effective 2026-01-19 through 2026-01-25
Ma
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 3:15, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Effective 2026-02-01 through 2026-02-06
Ma
-
Ti
-
Ke
-
To
Pe
La
-
Su
Duration: 3:15, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Effective 2026-02-09 through 2026-02-15
Ma
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 3:15, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Effective 2026-02-17 through 2026-02-23
Ma
Ti
Ke
-
To
Pe
-
La
-
Su
-
Duration: 3:15, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Operates only on 2026-03-02
Ma
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 3:15, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Effective 2026-06-06 through 2026-08-01
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 3:20, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Effective 2026-06-07 through 2026-08-02
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 3:20, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Effective 2026-06-09 through 2026-07-29
Ma
-
Ti
Ke
To
-
Pe
-
La
-
Su
-
Duration: 3:20, non-stop
Boeing 737-700 (Scimitar Winglets)

Suorat lennot:

Effective 2026-06-04 through 2026-08-03
Ma
Ti
-
Ke
-
To
Pe
La
-
Su
-
Duration: 3:20, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Effective 2026-04-12 through 2026-05-17
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 3:15, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Operates only on 2026-05-31
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 3:15, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Effective 2026-04-11 through 2026-05-30
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 3:15, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Operates only on 2026-05-24
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 3:15, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Effective 2026-01-06 through 2026-01-14
Ma
Ti
Ke
To
Pe
La
-
Su
-
Duration: 3:15, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Effective 2026-01-18 through 2026-01-23
Ma
-
Ti
Ke
To
Pe
La
-
Su
Duration: 3:15, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Effective 2026-01-26 through 2026-02-04
Ma
Ti
Ke
To
Pe
La
-
Su
-
Duration: 3:15, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Effective 2026-02-08 through 2026-02-11
Ma
-
Ti
Ke
To
-
Pe
-
La
-
Su
Duration: 3:15, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Effective 2026-02-18 through 2026-03-04
Ma
-
Ti
Ke
To
-
Pe
-
La
-
Su
-
Duration: 3:15, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Effective 2026-01-11 through 2026-01-16
Ma
-
Ti
-
Ke
-
To
Pe
La
-
Su
Duration: 3:15, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Effective 2026-01-19 through 2026-01-25
Ma
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 3:15, non-stop
Boeing 737-800 (73H)
Page 1 / 3        next
  • Lentoreitti kentältä Sacramento (SMF) kentälle Dallas Love Field (DAL).
  • Lentoreitin pituus on 2316km (1439 mailia).
  • Lähtökentän aikavyöhyke on UTC-8 , ja kohdekentän aikavyöhyke on UTC-6 . Kellonaika lähtökentällä on (loading...) ja kohdekentällä (loading...). Lentokenttien välillä on (loading...) tunnin aikaero.
  • Suorien lentojen lentoaika vaihtelee 3:10 ja 3:20 väliltä.