Kaikkien lentoyhtiöiden lennot: San Jose (SJC) - Denver (DEN).

Valitse lentopäivä:
LENTOAIKATAULU
Suorat lennot:
Ma,Su 07:00 San Jose (SJC) B 10:30 Denver (DEN)
Southwest Airlines WN 3522 Non-stop Boeing 737-700 (Scimitar Winglets) 2:30 Effective 2026-02-09 through 2026-02-15
Ma,Ti,To 07:00 San Jose (SJC) B 10:30 Denver (DEN)
Southwest Airlines WN 3522 Non-stop Boeing 737-700 (Scimitar Winglets) 2:30 Effective 2026-02-17 through 2026-02-23
Ma 07:00 San Jose (SJC) B 10:30 Denver (DEN)
Southwest Airlines WN 3522 Non-stop Boeing 737-700 (Scimitar Winglets) 2:30 Operates only on 2026-03-02
La 08:10 San Jose (SJC) B 11:40 Denver (DEN)
Southwest Airlines WN 3522 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2026-01-10 through 2026-02-07
Ti 08:25 San Jose (SJC) B 11:55 Denver (DEN)
Southwest Airlines WN 3522 Non-stop Boeing 737-700 (Scimitar Winglets) 2:30 Operates only on 2026-01-06
Ma-Pe 08:25 San Jose (SJC) B 11:55 Denver (DEN)
Southwest Airlines WN 3522 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2026-01-07 through 2026-01-14
Ti-Pe,Su 08:25 San Jose (SJC) B 11:55 Denver (DEN)
Southwest Airlines WN 3522 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2026-01-18 through 2026-01-23
Ma-Pe 08:25 San Jose (SJC) B 11:55 Denver (DEN)
Southwest Airlines WN 3522 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2026-01-26 through 2026-02-04
Su 08:25 San Jose (SJC) B 11:55 Denver (DEN)
Southwest Airlines WN 3522 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Operates only on 2026-02-08
Ti,Ke 08:25 San Jose (SJC) B 11:55 Denver (DEN)
Southwest Airlines WN 3522 Non-stop Boeing 737-700 (Scimitar Winglets) 2:30 Effective 2026-02-10 through 2026-02-11
Ti,Ke 08:25 San Jose (SJC) B 11:55 Denver (DEN)
Southwest Airlines WN 3522 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2026-02-18 through 2026-03-04
Ti 06:30 San Jose (SJC) B 10:05 Denver (DEN)
Southwest Airlines WN 3523 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Operates only on 2026-01-06
Ma-Pe 06:30 San Jose (SJC) B 10:05 Denver (DEN)
Southwest Airlines WN 3523 Non-stop Boeing 737-800 (73H) 2:35 Effective 2026-01-07 through 2026-01-14
Ti-Pe,Su 06:30 San Jose (SJC) B 10:05 Denver (DEN)
Southwest Airlines WN 3523 Non-stop Boeing 737-800 (73H) 2:35 Effective 2026-01-18 through 2026-01-23
Ma-Pe 06:30 San Jose (SJC) B 10:05 Denver (DEN)
Southwest Airlines WN 3523 Non-stop Boeing 737-800 (73H) 2:35 Effective 2026-01-26 through 2026-02-04
Ti,Ke,Su 06:30 San Jose (SJC) B 10:05 Denver (DEN)
Southwest Airlines WN 3523 Non-stop Boeing 737-800 (73H) 2:35 Effective 2026-02-08 through 2026-02-11
Ti,Ke 06:30 San Jose (SJC) B 10:05 Denver (DEN)
Southwest Airlines WN 3523 Non-stop Boeing 737-800 (73H) 2:35 Effective 2026-02-18 through 2026-03-04
La 08:35 San Jose (SJC) B 12:05 Denver (DEN)
Southwest Airlines WN 3523 Non-stop Boeing 737-700 (Scimitar Winglets) 2:30 Effective 2026-02-14 through 2026-02-28
Ma,To,Pe 09:05 San Jose (SJC) B 12:35 Denver (DEN)
Southwest Airlines WN 3523 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2026-02-12 through 2026-02-16
To,Pe,Su 09:05 San Jose (SJC) B 12:35 Denver (DEN)
Southwest Airlines WN 3523 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2026-02-20 through 2026-03-01
Ti 11:55 San Jose (SJC) B 15:25 Denver (DEN)
Southwest Airlines WN 3524 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Operates only on 2026-01-06
Ma-Pe 12:10 San Jose (SJC) B 15:40 Denver (DEN)
Southwest Airlines WN 3524 Non-stop Boeing 737-800 (73H) 2:30 Effective 2026-01-07 through 2026-01-14
Ti-Pe,Su 12:10 San Jose (SJC) B 15:40 Denver (DEN)
Southwest Airlines WN 3524 Non-stop Boeing 737-800 (73H) 2:30 Effective 2026-01-18 through 2026-01-23
Ma-Pe 12:10 San Jose (SJC) B 15:40 Denver (DEN)
Southwest Airlines WN 3524 Non-stop Boeing 737-800 (73H) 2:30 Effective 2026-01-26 through 2026-02-04
Ti,Ke,Su 12:10 San Jose (SJC) B 15:40 Denver (DEN)
Southwest Airlines WN 3524 Non-stop Boeing 737-800 (73H) 2:30 Effective 2026-02-08 through 2026-02-11
Ti,Ke 12:10 San Jose (SJC) B 15:40 Denver (DEN)
Southwest Airlines WN 3524 Non-stop Boeing 737-800 (73H) 2:30 Effective 2026-02-18 through 2026-03-04
To,Pe,Su 12:15 San Jose (SJC) B 15:40 Denver (DEN)
Southwest Airlines WN 3524 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-01-11 through 2026-01-16
Ma,Su 12:15 San Jose (SJC) B 15:40 Denver (DEN)
Southwest Airlines WN 3524 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-01-19 through 2026-01-25
To,Pe,Su 12:15 San Jose (SJC) B 15:40 Denver (DEN)
Southwest Airlines WN 3524 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-02-01 through 2026-02-06
Ma,Su 12:15 San Jose (SJC) B 15:40 Denver (DEN)
Southwest Airlines WN 3524 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-02-09 through 2026-02-15
Ma,Ti,To 12:15 San Jose (SJC) B 15:40 Denver (DEN)
Southwest Airlines WN 3524 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-02-17 through 2026-02-23
Ma 12:15 San Jose (SJC) B 15:40 Denver (DEN)
Southwest Airlines WN 3524 Non-stop Boeing 737-800 (73H) 2:25 Operates only on 2026-03-02
Ma,To-La 12:20 San Jose (SJC) B 15:45 Denver (DEN)
Southwest Airlines WN 3524 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2026-02-12 through 2026-02-16
To-Su 12:20 San Jose (SJC) B 15:45 Denver (DEN)
Southwest Airlines WN 3524 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2026-02-20 through 2026-03-01
La 12:35 San Jose (SJC) B 16:00 Denver (DEN)
Southwest Airlines WN 3524 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2026-01-10 through 2026-02-07
La 14:20 San Jose (SJC) B 17:50 Denver (DEN)
Southwest Airlines WN 3525 Non-stop Boeing 737-700 (Scimitar Winglets) 2:30 Effective 2026-02-14 through 2026-02-28
Ma,To,Pe 15:40 San Jose (SJC) B 19:10 Denver (DEN)
Southwest Airlines WN 3525 Non-stop Boeing 737-800 (73H) 2:30 Effective 2026-02-12 through 2026-02-16
To,Pe,Su 15:40 San Jose (SJC) B 19:10 Denver (DEN)
Southwest Airlines WN 3525 Non-stop Boeing 737-800 (73H) 2:30 Effective 2026-02-20 through 2026-03-01
Ti,Ke 06:00 San Jose (SJC) B 09:30 Denver (DEN)
Southwest Airlines WN 3526 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2026-06-09 through 2026-07-29
Su 06:15 San Jose (SJC) B 09:45 Denver (DEN)
Southwest Airlines WN 3573 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2026-06-07 through 2026-08-02
Su 06:10 San Jose (SJC) B 09:40 Denver (DEN)
Southwest Airlines WN 3578 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2026-08-09 through 2026-09-27
Ti,Ke 06:45 San Jose (SJC) B 10:15 Denver (DEN)
Southwest Airlines WN 3578 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2026-08-04 through 2026-09-30
La 06:50 San Jose (SJC) B 10:20 Denver (DEN)
Southwest Airlines WN 3578 Non-stop Boeing 737-800 (73H) 2:30 Effective 2026-08-08 through 2026-09-26
Ma,To,Pe 08:40 San Jose (SJC) B 12:05 Denver (DEN)
Southwest Airlines WN 3578 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2026-08-06 through 2026-09-28
Su 08:35 San Jose (SJC) B 12:00 Denver (DEN)
Southwest Airlines WN 3579 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-08-09 through 2026-09-27
La 08:55 San Jose (SJC) B 12:20 Denver (DEN)
Southwest Airlines WN 3579 Non-stop Boeing 737-700 (Scimitar Winglets) 2:25 Effective 2026-08-08 through 2026-09-26
Ti,Ke 10:45 San Jose (SJC) B 14:15 Denver (DEN)
Southwest Airlines WN 3579 Non-stop Boeing 737-700 (Scimitar Winglets) 2:30 Effective 2026-08-04 through 2026-09-30
La 12:50 San Jose (SJC) B 16:20 Denver (DEN)
Southwest Airlines WN 3580 Non-stop Boeing 737-800 (73H) 2:30 Effective 2026-08-08 through 2026-09-26
Ma-Pe 13:25 San Jose (SJC) B 16:55 Denver (DEN)
Southwest Airlines WN 3580 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2026-08-04 through 2026-09-30
Su 14:20 San Jose (SJC) B 17:50 Denver (DEN)
Southwest Airlines WN 3580 Non-stop Boeing 737-700 (Scimitar Winglets) 2:30 Effective 2026-08-09 through 2026-09-27
prev   1 2 3 4 5 6 7   next


Kaikkien lentoyhtiöiden lennot: San Jose (SJC) - Denver (DEN).
Valitse lentopäivä:
LENTOAIKATAULU
Suorat lennot:

Effective 2026-02-09 through 2026-02-15
Ma
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 2:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Suorat lennot:

Effective 2026-02-17 through 2026-02-23
Ma
Ti
Ke
-
To
Pe
-
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Suorat lennot:

Operates only on 2026-03-02
Ma
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Suorat lennot:

Effective 2026-01-10 through 2026-02-07
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Operates only on 2026-01-06
Ma
-
Ti
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Suorat lennot:

Effective 2026-01-07 through 2026-01-14
Ma
Ti
Ke
To
Pe
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Effective 2026-01-18 through 2026-01-23
Ma
-
Ti
Ke
To
Pe
La
-
Su
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Effective 2026-01-26 through 2026-02-04
Ma
Ti
Ke
To
Pe
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Operates only on 2026-02-08
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Effective 2026-02-10 through 2026-02-11
Ma
-
Ti
Ke
To
-
Pe
-
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Suorat lennot:

Effective 2026-02-18 through 2026-03-04
Ma
-
Ti
Ke
To
-
Pe
-
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Operates only on 2026-01-06
Ma
-
Ti
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 2:35, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Effective 2026-01-07 through 2026-01-14
Ma
Ti
Ke
To
Pe
La
-
Su
-
Duration: 2:35, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Effective 2026-01-18 through 2026-01-23
Ma
-
Ti
Ke
To
Pe
La
-
Su
Duration: 2:35, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Effective 2026-01-26 through 2026-02-04
Ma
Ti
Ke
To
Pe
La
-
Su
-
Duration: 2:35, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Effective 2026-02-08 through 2026-02-11
Ma
-
Ti
Ke
To
-
Pe
-
La
-
Su
Duration: 2:35, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Effective 2026-02-18 through 2026-03-04
Ma
-
Ti
Ke
To
-
Pe
-
La
-
Su
-
Duration: 2:35, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Effective 2026-02-14 through 2026-02-28
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 2:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Suorat lennot:

Effective 2026-02-12 through 2026-02-16
Ma
Ti
-
Ke
-
To
Pe
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Effective 2026-02-20 through 2026-03-01
Ma
-
Ti
-
Ke
-
To
Pe
La
-
Su
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Operates only on 2026-01-06
Ma
-
Ti
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Effective 2026-01-07 through 2026-01-14
Ma
Ti
Ke
To
Pe
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Effective 2026-01-18 through 2026-01-23
Ma
-
Ti
Ke
To
Pe
La
-
Su
Duration: 2:30, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Effective 2026-01-26 through 2026-02-04
Ma
Ti
Ke
To
Pe
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Effective 2026-02-08 through 2026-02-11
Ma
-
Ti
Ke
To
-
Pe
-
La
-
Su
Duration: 2:30, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Effective 2026-02-18 through 2026-03-04
Ma
-
Ti
Ke
To
-
Pe
-
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Effective 2026-01-11 through 2026-01-16
Ma
-
Ti
-
Ke
-
To
Pe
La
-
Su
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Effective 2026-01-19 through 2026-01-25
Ma
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Effective 2026-02-01 through 2026-02-06
Ma
-
Ti
-
Ke
-
To
Pe
La
-
Su
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Effective 2026-02-09 through 2026-02-15
Ma
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Effective 2026-02-17 through 2026-02-23
Ma
Ti
Ke
-
To
Pe
-
La
-
Su
-
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Operates only on 2026-03-02
Ma
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Effective 2026-02-12 through 2026-02-16
Ma
Ti
-
Ke
-
To
Pe
La
Su
-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Effective 2026-02-20 through 2026-03-01
Ma
-
Ti
-
Ke
-
To
Pe
La
Su
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Effective 2026-01-10 through 2026-02-07
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Effective 2026-02-14 through 2026-02-28
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 2:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Suorat lennot:

Effective 2026-02-12 through 2026-02-16
Ma
Ti
-
Ke
-
To
Pe
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Effective 2026-02-20 through 2026-03-01
Ma
-
Ti
-
Ke
-
To
Pe
La
-
Su
Duration: 2:30, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Effective 2026-06-09 through 2026-07-29
Ma
-
Ti
Ke
To
-
Pe
-
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Effective 2026-06-07 through 2026-08-02
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Effective 2026-08-09 through 2026-09-27
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Effective 2026-08-04 through 2026-09-30
Ma
-
Ti
Ke
To
-
Pe
-
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Effective 2026-08-08 through 2026-09-26
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 2:30, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Effective 2026-08-06 through 2026-09-28
Ma
Ti
-
Ke
-
To
Pe
La
-
Su
-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Effective 2026-08-09 through 2026-09-27
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Effective 2026-08-08 through 2026-09-26
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 2:25, non-stop
Boeing 737-700 (Scimitar Winglets)

Suorat lennot:

Effective 2026-08-04 through 2026-09-30
Ma
-
Ti
Ke
To
-
Pe
-
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Suorat lennot:

Effective 2026-08-08 through 2026-09-26
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 2:30, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Effective 2026-08-04 through 2026-09-30
Ma
Ti
Ke
To
Pe
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Effective 2026-08-09 through 2026-09-27
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 2:30, non-stop
Boeing 737-700 (Scimitar Winglets)
prev        Page 3 / 7        next
  • Lentoreitti kentältä San Jose (SJC) kentälle Denver (DEN).
  • Lentoreitin pituus on 1521km (945 mailia).
  • Lähtökentän aikavyöhyke on UTC-8 , ja kohdekentän aikavyöhyke on UTC-7 . Kellonaika lähtökentällä on (loading...) ja kohdekentällä (loading...). Lentokenttien välillä on (loading...) tunnin aikaero.
  • Suorien lentojen lentoaika vaihtelee 2:25 ja 2:40 väliltä.