Kaikkien lentoyhtiöiden lennot: Pittsburgh (PIT) - Love Field, Dallas (DAL).

Valitse lentopäivä:
LENTOAIKATAULU
Välilaskulliset lennot:
Ma,Su 10:50 Pittsburgh (PIT) 15:50 Love Field, Dallas (DAL) 1
Southwest Airlines WN 855 1-stop Boeing 737-700 (73W) 6:00 Effective 2025-01-20 through 2025-01-26
To,Pe,Su 10:50 Pittsburgh (PIT) 15:50 Love Field, Dallas (DAL) 1
Southwest Airlines WN 855 1-stop Boeing 737-700 (73W) 6:00 Effective 2025-02-02 through 2025-02-07
Ma 10:50 Pittsburgh (PIT) 15:50 Love Field, Dallas (DAL) 1
Southwest Airlines WN 855 1-stop Boeing 737-700 (73W) 6:00 Operates only on 2025-02-10
Ma,Ti,To 10:50 Pittsburgh (PIT) 15:50 Love Field, Dallas (DAL) 1
Southwest Airlines WN 855 1-stop Boeing 737-700 (73W) 6:00 Effective 2025-02-18 through 2025-02-24
Ma 10:50 Pittsburgh (PIT) 15:50 Love Field, Dallas (DAL) 1
Southwest Airlines WN 855 1-stop Boeing 737-700 (73W) 6:00 Operates only on 2025-03-03
La 14:35 Pittsburgh (PIT) 19:45 Love Field, Dallas (DAL) 1
Southwest Airlines WN 914 1-stop Boeing 737 MAX 8 (7M8) 6:10 Effective 2024-11-23 through 2024-11-30
La 14:35 Pittsburgh (PIT) 19:45 Love Field, Dallas (DAL) 1
Southwest Airlines WN 914 1-stop Boeing 737 MAX 8 (7M8) 6:10 Effective 2024-12-21 through 2025-01-04
Su 06:00 Pittsburgh (PIT) 12:15 Love Field, Dallas (DAL) 1
Southwest Airlines WN 611 2-stop Boeing 737 MAX 8 (7M8) 7:15 Operates only on 2024-12-01
prev   1 2


Kaikkien lentoyhtiöiden lennot: Pittsburgh (PIT) - Love Field, Dallas (DAL).
Valitse lentopäivä:
LENTOAIKATAULU
Välilaskulliset lennot:

Effective 2025-01-20 through 2025-01-26
Ma
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 6:00, 1-stop
Boeing 737-700 (73W)

Effective 2025-02-02 through 2025-02-07
Ma
-
Ti
-
Ke
-
To
Pe
La
-
Su
Duration: 6:00, 1-stop
Boeing 737-700 (73W)

Operates only on 2025-02-10
Ma
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 6:00, 1-stop
Boeing 737-700 (73W)

Effective 2025-02-18 through 2025-02-24
Ma
Ti
Ke
-
To
Pe
-
La
-
Su
-
Duration: 6:00, 1-stop
Boeing 737-700 (73W)

Operates only on 2025-03-03
Ma
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 6:00, 1-stop
Boeing 737-700 (73W)

Effective 2024-11-23 through 2024-11-30
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 6:10, 1-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-12-21 through 2025-01-04
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 6:10, 1-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2024-12-01
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 7:15, 2-stop
Boeing 737 MAX 8 (7M8)
prev        Page 2 / 2
  • Lentoreitti kentältä Pittsburgh (PIT) kentälle Love Field, Dallas (DAL).
  • Lentoreitin pituus on 1703km (1058 mailia).
  • Lähtökentän aikavyöhyke on UTC-5 , ja kohdekentän aikavyöhyke on UTC-6 . Kellonaika lähtökentällä on (loading...) ja kohdekentällä (loading...). Lentokenttien välillä on (loading...) tunnin aikaero.
  • Suorien lentojen lentoaika vaihtelee 2:45 ja 3:10 väliltä.