Kaikkien lentoyhtiöiden lennot: El Calafate (FTE) - Buenos Aires Jorge Newbery Airfield (AEP).

Valitse lentopäivä:
LENTOAIKATAULU
Suorat lennot:
Ke 20:25 El Calafate (FTE) 23:25 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1851 Non-stop Boeing 737-200 Combi (73M) 3:00 Effective 2026-02-11 through 2026-02-25
Ma 20:25 El Calafate (FTE) 23:25 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1851 Non-stop Boeing 737-200 Combi (73M) 3:00 Effective 2026-07-06 through 2026-08-31
Su 20:25 El Calafate (FTE) 23:25 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1851 Non-stop Boeing 737-800 (738) 3:00 Effective 2026-07-12 through 2026-08-30
Ma 20:55 El Calafate (FTE) 23:55 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1851 Non-stop Boeing 737-200 Combi (73M) 3:00 Operates only on 2026-01-05
Pe 21:05 El Calafate (FTE) 00:05 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1851 Non-stop Boeing 737-800 (738) 3:00 Operates only on 2026-01-02
Lento laskeutuu seuraavan päivän puolella.
Pe 21:05 El Calafate (FTE) 00:05 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1851 Non-stop Boeing 737-800 (738) 3:00 Operates only on 2026-01-30
Lento laskeutuu seuraavan päivän puolella.
Ma 17:50 El Calafate (FTE) 20:50 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1853 Non-stop Boeing 737-800 (738) 3:00 Effective 2026-01-05 through 2026-02-09
Ma 17:50 El Calafate (FTE) 20:50 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1853 Non-stop Boeing 737-800 (738) 3:00 Operates only on 2026-02-23
Ma 18:30 El Calafate (FTE) 21:30 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1853 Non-stop Boeing 737-800 (738) 3:00 Effective 2026-09-07 through 2026-09-28
Ma 19:00 El Calafate (FTE) 22:00 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1853 Non-stop Boeing 737-200 Combi (73M) 3:00 Effective 2026-04-06 through 2026-06-22
To 19:30 El Calafate (FTE) 22:30 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1853 Non-stop Boeing 737-800 (738) 3:00 Effective 2026-09-03 through 2026-09-24
La 20:50 El Calafate (FTE) 23:50 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1853 Non-stop Boeing 737-800 (738) 3:00 Effective from 2026-09-05
To 21:30 El Calafate (FTE) 00:30 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1853 Non-stop Boeing 737-800 (738) 3:00 Operates only on 2026-01-01
Lento laskeutuu seuraavan päivän puolella.
Ke 12:30 El Calafate (FTE) 15:30 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1893 Non-stop Boeing 737-200 Combi (73M) 3:00 Effective 2026-03-04 through 2026-03-25
To 14:30 El Calafate (FTE) 17:30 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1893 Non-stop Boeing 737-200 Combi (73M) 3:00 Effective 2026-04-02 through 2026-06-25
Ti 10:30 El Calafate (FTE) 13:30 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1895 Non-stop Boeing 737-800 (738) 3:00 Effective from 2026-09-01
Pe 11:30 El Calafate (FTE) 14:30 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1895 Non-stop Boeing 737-800 (738) 3:00 Effective from 2026-09-04
Ma 12:30 El Calafate (FTE) 15:30 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1895 Non-stop Boeing 737-800 (738) 3:00 Effective 2026-03-02 through 2026-03-30
Pe 12:40 El Calafate (FTE) 15:40 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1895 Non-stop Boeing 737-800 (738) 3:00 Effective 2026-01-02 through 2026-02-27
To 12:45 El Calafate (FTE) 15:45 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1895 Non-stop Boeing 737-800 (738) 3:00 Operates only on 2026-01-08
To 12:45 El Calafate (FTE) 15:45 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1895 Non-stop Boeing 737-200 Combi (73M) 3:00 Operates only on 2026-01-15
To 12:45 El Calafate (FTE) 15:45 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1895 Non-stop Boeing 737-800 (738) 3:00 Operates only on 2026-01-22
To 12:45 El Calafate (FTE) 15:45 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1895 Non-stop Boeing 737-200 Combi (73M) 3:00 Operates only on 2026-01-29
Ma 12:55 El Calafate (FTE) 15:55 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1895 Non-stop Boeing 737-200 Combi (73M) 3:00 Effective 2026-01-05 through 2026-02-23
To 12:55 El Calafate (FTE) 15:55 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1895 Non-stop Boeing 737-800 (738) 3:00 Effective 2026-02-05 through 2026-02-19
To 12:55 El Calafate (FTE) 15:55 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1895 Non-stop Boeing 737-200 Combi (73M) 3:00 Operates only on 2026-02-26
Ti,La 13:30 El Calafate (FTE) 16:30 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1895 Non-stop Boeing 737-200 Combi (73M) 3:00 Effective 2026-03-03 through 2026-03-31
Ke-Pe 13:30 El Calafate (FTE) 16:30 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1895 Non-stop Boeing 737-800 (738) 3:00 Effective 2026-03-04 through 2026-03-27
To 13:30 El Calafate (FTE) 16:30 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1895 Non-stop Boeing 737-800 (738) 3:00 Effective 2026-04-02 through 2026-06-25
Su 13:30 El Calafate (FTE) 16:30 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1895 Non-stop Boeing 737-200 Combi (73M) 3:00 Effective 2026-04-05 through 2026-06-28
Ke 13:30 El Calafate (FTE) 16:30 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1895 Non-stop Boeing 737-800 (738) 3:00 Effective 2026-09-02 through 2026-10-28
La 13:30 El Calafate (FTE) 16:30 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1895 Non-stop Boeing 737-200 Combi (73M) 3:00 Effective from 2026-09-05
Ti 13:40 El Calafate (FTE) 16:40 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1895 Non-stop Boeing 737-200 Combi (73M) 3:00 Effective 2026-01-06 through 2026-02-24
Su 13:45 El Calafate (FTE) 16:45 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1895 Non-stop Boeing 737-200 Combi (73M) 3:00 Operates only on 2026-01-11
La 13:55 El Calafate (FTE) 16:55 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1895 Non-stop Boeing 737-200 Combi (73M) 3:00 Effective 2026-01-03 through 2026-01-17
Ke,Su 13:55 El Calafate (FTE) 16:55 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1895 Non-stop Boeing 737-800 (738) 3:00 Effective 2026-01-04 through 2026-01-07
Ke 13:55 El Calafate (FTE) 16:55 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1895 Non-stop Boeing 737-800 (738) 3:00 Operates only on 2026-01-14
Ke,La,Su 13:55 El Calafate (FTE) 16:55 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1895 Non-stop Boeing 737-200 Combi (73M) 3:00 Effective 2026-01-18 through 2026-01-25
La 13:55 El Calafate (FTE) 16:55 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1895 Non-stop Boeing 737-200 Combi (73M) 3:00 Effective 2026-01-31 through 2026-02-07
Ke,Su 13:55 El Calafate (FTE) 16:55 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1895 Non-stop Boeing 737-800 (738) 3:00 Effective 2026-02-01 through 2026-02-04
La,Su 13:55 El Calafate (FTE) 16:55 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1895 Non-stop Boeing 737-200 Combi (73M) 3:00 Effective 2026-02-08 through 2026-02-15
Ke 13:55 El Calafate (FTE) 16:55 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1895 Non-stop Boeing 737-800 (738) 3:00 Operates only on 2026-02-11
Ke,La,Su 13:55 El Calafate (FTE) 16:55 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1895 Non-stop Boeing 737-200 Combi (73M) 3:00 Effective 2026-02-18 through 2026-02-22
Ke 13:55 El Calafate (FTE) 16:55 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1895 Non-stop Boeing 737-800 (738) 3:00 Operates only on 2026-02-25
La 13:55 El Calafate (FTE) 16:55 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1895 Non-stop Boeing 737-200 Combi (73M) 3:00 Operates only on 2026-02-28
Ke 14:25 El Calafate (FTE) 17:25 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1895 Non-stop Boeing 737-800 (738) 3:00 Operates only on 2026-01-28
Su 14:30 El Calafate (FTE) 17:30 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1895 Non-stop Boeing 737-800 (738) 3:00 Effective from 2026-09-06
Ma 14:30 El Calafate (FTE) 17:30 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1895 Non-stop Boeing 737-200 Combi (73M) 3:00 Effective from 2026-09-07
Ke 20:05 El Calafate (FTE) 23:05 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1895 Non-stop Boeing 737-800 (738) 3:00 Effective 2026-04-01 through 2026-06-24
Pe 20:05 El Calafate (FTE) 23:05 Buenos Aires Jorge Newbery Airfield (AEP)
Aerolineas Argentinas AR 1895 Non-stop Boeing 737-200 Combi (73M) 3:00 Effective 2026-04-03 through 2026-06-26
prev   1 2 3 4 5 6 ... 12 13 14   next


Kaikkien lentoyhtiöiden lennot: El Calafate (FTE) - Buenos Aires Jorge Newbery Airfield (AEP).
Valitse lentopäivä:
LENTOAIKATAULU
Suorat lennot:

Effective 2026-02-11 through 2026-02-25
Ma
-
Ti
-
Ke
To
-
Pe
-
La
-
Su
-
Duration: 3:00, non-stop
Boeing 737-200 Combi (73M)

Suorat lennot:

Effective 2026-07-06 through 2026-08-31
Ma
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 3:00, non-stop
Boeing 737-200 Combi (73M)

Suorat lennot:

Effective 2026-07-12 through 2026-08-30
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 3:00, non-stop
Boeing 737-800 (738)

Suorat lennot:

Operates only on 2026-01-05
Ma
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 3:00, non-stop
Boeing 737-200 Combi (73M)

Suorat lennot:

Operates only on 2026-01-02
Ma
-
Ti
-
Ke
-
To
-
Pe
La
-
Su
-
Duration: 3:00, non-stop
Boeing 737-800 (738)
Lento laskeutuu seuraavan päivän puolella.

Suorat lennot:

Operates only on 2026-01-30
Ma
-
Ti
-
Ke
-
To
-
Pe
La
-
Su
-
Duration: 3:00, non-stop
Boeing 737-800 (738)
Lento laskeutuu seuraavan päivän puolella.

Suorat lennot:

Effective 2026-01-05 through 2026-02-09
Ma
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 3:00, non-stop
Boeing 737-800 (738)

Suorat lennot:

Operates only on 2026-02-23
Ma
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 3:00, non-stop
Boeing 737-800 (738)

Suorat lennot:

Effective 2026-09-07 through 2026-09-28
Ma
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 3:00, non-stop
Boeing 737-800 (738)

Suorat lennot:

Effective 2026-04-06 through 2026-06-22
Ma
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 3:00, non-stop
Boeing 737-200 Combi (73M)

Suorat lennot:

Effective 2026-09-03 through 2026-09-24
Ma
-
Ti
-
Ke
-
To
Pe
-
La
-
Su
-
Duration: 3:00, non-stop
Boeing 737-800 (738)

Suorat lennot:

Effective from 2026-09-05
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 3:00, non-stop
Boeing 737-800 (738)

Suorat lennot:

Operates only on 2026-01-01
Ma
-
Ti
-
Ke
-
To
Pe
-
La
-
Su
-
Duration: 3:00, non-stop
Boeing 737-800 (738)
Lento laskeutuu seuraavan päivän puolella.

Suorat lennot:

Effective 2026-03-04 through 2026-03-25
Ma
-
Ti
-
Ke
To
-
Pe
-
La
-
Su
-
Duration: 3:00, non-stop
Boeing 737-200 Combi (73M)

Suorat lennot:

Effective 2026-04-02 through 2026-06-25
Ma
-
Ti
-
Ke
-
To
Pe
-
La
-
Su
-
Duration: 3:00, non-stop
Boeing 737-200 Combi (73M)

Suorat lennot:

Effective from 2026-09-01
Ma
-
Ti
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 3:00, non-stop
Boeing 737-800 (738)

Suorat lennot:

Effective from 2026-09-04
Ma
-
Ti
-
Ke
-
To
-
Pe
La
-
Su
-
Duration: 3:00, non-stop
Boeing 737-800 (738)

Suorat lennot:

Effective 2026-03-02 through 2026-03-30
Ma
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 3:00, non-stop
Boeing 737-800 (738)

Suorat lennot:

Effective 2026-01-02 through 2026-02-27
Ma
-
Ti
-
Ke
-
To
-
Pe
La
-
Su
-
Duration: 3:00, non-stop
Boeing 737-800 (738)

Suorat lennot:

Operates only on 2026-01-08
Ma
-
Ti
-
Ke
-
To
Pe
-
La
-
Su
-
Duration: 3:00, non-stop
Boeing 737-800 (738)

Suorat lennot:

Operates only on 2026-01-15
Ma
-
Ti
-
Ke
-
To
Pe
-
La
-
Su
-
Duration: 3:00, non-stop
Boeing 737-200 Combi (73M)

Suorat lennot:

Operates only on 2026-01-22
Ma
-
Ti
-
Ke
-
To
Pe
-
La
-
Su
-
Duration: 3:00, non-stop
Boeing 737-800 (738)

Suorat lennot:

Operates only on 2026-01-29
Ma
-
Ti
-
Ke
-
To
Pe
-
La
-
Su
-
Duration: 3:00, non-stop
Boeing 737-200 Combi (73M)

Suorat lennot:

Effective 2026-01-05 through 2026-02-23
Ma
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 3:00, non-stop
Boeing 737-200 Combi (73M)

Suorat lennot:

Effective 2026-02-05 through 2026-02-19
Ma
-
Ti
-
Ke
-
To
Pe
-
La
-
Su
-
Duration: 3:00, non-stop
Boeing 737-800 (738)

Suorat lennot:

Operates only on 2026-02-26
Ma
-
Ti
-
Ke
-
To
Pe
-
La
-
Su
-
Duration: 3:00, non-stop
Boeing 737-200 Combi (73M)

Suorat lennot:

Effective 2026-03-03 through 2026-03-31
Ma
-
Ti
Ke
-
To
-
Pe
-
La
Su
-
Duration: 3:00, non-stop
Boeing 737-200 Combi (73M)

Suorat lennot:

Effective 2026-03-04 through 2026-03-27
Ma
-
Ti
-
Ke
To
Pe
La
-
Su
-
Duration: 3:00, non-stop
Boeing 737-800 (738)

Suorat lennot:

Effective 2026-04-02 through 2026-06-25
Ma
-
Ti
-
Ke
-
To
Pe
-
La
-
Su
-
Duration: 3:00, non-stop
Boeing 737-800 (738)

Suorat lennot:

Effective 2026-04-05 through 2026-06-28
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 3:00, non-stop
Boeing 737-200 Combi (73M)

Suorat lennot:

Effective 2026-09-02 through 2026-10-28
Ma
-
Ti
-
Ke
To
-
Pe
-
La
-
Su
-
Duration: 3:00, non-stop
Boeing 737-800 (738)

Suorat lennot:

Effective from 2026-09-05
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 3:00, non-stop
Boeing 737-200 Combi (73M)

Suorat lennot:

Effective 2026-01-06 through 2026-02-24
Ma
-
Ti
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 3:00, non-stop
Boeing 737-200 Combi (73M)

Suorat lennot:

Operates only on 2026-01-11
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 3:00, non-stop
Boeing 737-200 Combi (73M)

Suorat lennot:

Effective 2026-01-03 through 2026-01-17
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 3:00, non-stop
Boeing 737-200 Combi (73M)

Suorat lennot:

Effective 2026-01-04 through 2026-01-07
Ma
-
Ti
-
Ke
To
-
Pe
-
La
-
Su
Duration: 3:00, non-stop
Boeing 737-800 (738)

Suorat lennot:

Operates only on 2026-01-14
Ma
-
Ti
-
Ke
To
-
Pe
-
La
-
Su
-
Duration: 3:00, non-stop
Boeing 737-800 (738)

Suorat lennot:

Effective 2026-01-18 through 2026-01-25
Ma
-
Ti
-
Ke
To
-
Pe
-
La
Su
Duration: 3:00, non-stop
Boeing 737-200 Combi (73M)

Suorat lennot:

Effective 2026-01-31 through 2026-02-07
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 3:00, non-stop
Boeing 737-200 Combi (73M)

Suorat lennot:

Effective 2026-02-01 through 2026-02-04
Ma
-
Ti
-
Ke
To
-
Pe
-
La
-
Su
Duration: 3:00, non-stop
Boeing 737-800 (738)

Suorat lennot:

Effective 2026-02-08 through 2026-02-15
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
Duration: 3:00, non-stop
Boeing 737-200 Combi (73M)

Suorat lennot:

Operates only on 2026-02-11
Ma
-
Ti
-
Ke
To
-
Pe
-
La
-
Su
-
Duration: 3:00, non-stop
Boeing 737-800 (738)

Suorat lennot:

Effective 2026-02-18 through 2026-02-22
Ma
-
Ti
-
Ke
To
-
Pe
-
La
Su
Duration: 3:00, non-stop
Boeing 737-200 Combi (73M)

Suorat lennot:

Operates only on 2026-02-25
Ma
-
Ti
-
Ke
To
-
Pe
-
La
-
Su
-
Duration: 3:00, non-stop
Boeing 737-800 (738)

Suorat lennot:

Operates only on 2026-02-28
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 3:00, non-stop
Boeing 737-200 Combi (73M)

Suorat lennot:

Operates only on 2026-01-28
Ma
-
Ti
-
Ke
To
-
Pe
-
La
-
Su
-
Duration: 3:00, non-stop
Boeing 737-800 (738)

Suorat lennot:

Effective from 2026-09-06
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 3:00, non-stop
Boeing 737-800 (738)

Suorat lennot:

Effective from 2026-09-07
Ma
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 3:00, non-stop
Boeing 737-200 Combi (73M)

Suorat lennot:

Effective 2026-04-01 through 2026-06-24
Ma
-
Ti
-
Ke
To
-
Pe
-
La
-
Su
-
Duration: 3:00, non-stop
Boeing 737-800 (738)

Suorat lennot:

Effective 2026-04-03 through 2026-06-26
Ma
-
Ti
-
Ke
-
To
-
Pe
La
-
Su
-
Duration: 3:00, non-stop
Boeing 737-200 Combi (73M)
prev        Page 3 / 14        next
  • Lentoreitti kentältä El Calafate (FTE) kentälle Buenos Aires Jorge Newbery Airfield (AEP).
  • Lentoreitin pituus on 2067km (1284 mailia).
  • Sekä lähtökentän että kohdekentän aikavyöhyke on UTC-3 . Kellonaika molemmilla lentokentillä on (loading...).
  • Suorien lentojen lentoaika on 3:00.