Kaikkien lentoyhtiöiden lennot: Dubai (DXB) - Batumi (BUS).

Valitse lentopäivä:
LENTOAIKATAULU
Suorat lennot:
Pe 10:00 Dubai (DXB) 2 13:35 Batumi (BUS)
Flydubai FZ 725 Non-stop Boeing 737 MAX 8 (7M8) 3:35 Operates only on 2026-05-29
Ti,To,La,Su 12:05 Dubai (DXB) 2 15:40 Batumi (BUS)
Flydubai FZ 725 Non-stop Boeing 737 MAX 8 (7M8) 3:35 Effective 2026-05-23 through 2026-06-02
Ti,Pe-Su 12:05 Dubai (DXB) 2 15:40 Batumi (BUS)
Flydubai FZ 725 Non-stop Boeing 737 MAX 8 (7M8) 3:35 Effective 2026-06-05 through 2026-06-30
Ti,To-Su 12:05 Dubai (DXB) 2 15:40 Batumi (BUS)
Flydubai FZ 725 Non-stop Boeing 737 MAX 8 (7M8) 3:35 Effective 2026-07-02 through 2026-08-30
Suorat codeshare-lennot:
Pe 10:00 Dubai (DXB) 2 13:35 Batumi (BUS)
Emirates EK 2412 Non-stop Boeing 737 MAX 8 (7M8) 3:35 Operates only on 2026-05-29
Codeshare lento, lennon lentää Flydubai.(FZ 725)
Ti,To,La,Su 12:05 Dubai (DXB) 2 15:40 Batumi (BUS)
Emirates EK 2412 Non-stop Boeing 737 MAX 8 (7M8) 3:35 Effective 2026-05-23 through 2026-06-02
Codeshare lento, lennon lentää Flydubai.(FZ 725)
Ti,Pe-Su 12:05 Dubai (DXB) 2 15:40 Batumi (BUS)
Emirates EK 2412 Non-stop Boeing 737 MAX 8 (7M8) 3:35 Effective 2026-06-05 through 2026-06-30
Codeshare lento, lennon lentää Flydubai.(FZ 725)
Ti,To-Su 12:05 Dubai (DXB) 2 15:40 Batumi (BUS)
Emirates EK 2412 Non-stop Boeing 737 MAX 8 (7M8) 3:35 Effective 2026-07-02 through 2026-08-30
Codeshare lento, lennon lentää Flydubai.(FZ 725)


Kaikkien lentoyhtiöiden lennot: Dubai (DXB) - Batumi (BUS).
Valitse lentopäivä:
LENTOAIKATAULU
Suorat lennot:

10:00

13:35
Operates only on 2026-05-29
Ma
-
Ti
-
Ke
-
To
-
Pe
La
-
Su
-
Duration: 3:35, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

12:05

15:40
Effective 2026-05-23 through 2026-06-02
Ma
-
Ti
Ke
-
To
Pe
-
La
Su
Duration: 3:35, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

12:05

15:40
Effective 2026-06-05 through 2026-06-30
Ma
-
Ti
Ke
-
To
-
Pe
La
Su
Duration: 3:35, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

12:05

15:40
Effective 2026-07-02 through 2026-08-30
Ma
-
Ti
Ke
-
To
Pe
La
Su
Duration: 3:35, non-stop
Boeing 737 MAX 8 (7M8)

Suorat codeshare-lennot:

10:00

13:35
Operates only on 2026-05-29
Ma
-
Ti
-
Ke
-
To
-
Pe
La
-
Su
-
Codeshare lento, lennon lentää Flydubai. (FZ 725)
Duration: 3:35, non-stop
Boeing 737 MAX 8 (7M8)

Suorat codeshare-lennot:

12:05

15:40
Effective 2026-05-23 through 2026-06-02
Ma
-
Ti
Ke
-
To
Pe
-
La
Su
Codeshare lento, lennon lentää Flydubai. (FZ 725)
Duration: 3:35, non-stop
Boeing 737 MAX 8 (7M8)

Suorat codeshare-lennot:

12:05

15:40
Effective 2026-06-05 through 2026-06-30
Ma
-
Ti
Ke
-
To
-
Pe
La
Su
Codeshare lento, lennon lentää Flydubai. (FZ 725)
Duration: 3:35, non-stop
Boeing 737 MAX 8 (7M8)

Suorat codeshare-lennot:

12:05

15:40
Effective 2026-07-02 through 2026-08-30
Ma
-
Ti
Ke
-
To
Pe
La
Su
Codeshare lento, lennon lentää Flydubai. (FZ 725)
Duration: 3:35, non-stop
Boeing 737 MAX 8 (7M8)
  • Kansainvälinen lentoreitti kentältä Dubai, United Arab Emirates (DXB) kentälle Batumi, Georgia (BUS).
  • Lentoreitin pituus on 2215km (1376 mailia).
  • Sekä lähtökentän että kohdekentän aikavyöhyke on UTC+4 . Kellonaika molemmilla lentokentillä on (loading...).
  • Suorien lentojen lentoaika on 3:35.