Kaikkien lentoyhtiöiden lennot: Denver (DEN) - San Jose (SJC).

Valitse lentopäivä:
LENTOAIKATAULU
Suorat lennot:
To,Pe,Su 18:20 Denver (DEN) 20:15 San Jose (SJC) B
Southwest Airlines WN 4530 Non-stop Boeing 737-700 (Scimitar Winglets) 2:55 Effective 2026-01-11 through 2026-01-16
Ma,Su 18:20 Denver (DEN) 20:15 San Jose (SJC) B
Southwest Airlines WN 4530 Non-stop Boeing 737-700 (Scimitar Winglets) 2:55 Effective 2026-01-19 through 2026-01-25
To,Pe,Su 18:20 Denver (DEN) 20:15 San Jose (SJC) B
Southwest Airlines WN 4530 Non-stop Boeing 737-700 (Scimitar Winglets) 2:55 Effective 2026-02-01 through 2026-02-06
Ma,Su 18:20 Denver (DEN) 20:15 San Jose (SJC) B
Southwest Airlines WN 4530 Non-stop Boeing 737-700 (Scimitar Winglets) 2:55 Effective 2026-02-09 through 2026-02-15
Ma,Ti,To 18:20 Denver (DEN) 20:15 San Jose (SJC) B
Southwest Airlines WN 4530 Non-stop Boeing 737-700 (Scimitar Winglets) 2:55 Effective 2026-02-17 through 2026-02-23
Ma 18:20 Denver (DEN) 20:15 San Jose (SJC) B
Southwest Airlines WN 4530 Non-stop Boeing 737-700 (Scimitar Winglets) 2:55 Operates only on 2026-03-02
La 18:40 Denver (DEN) 20:30 San Jose (SJC) B
Southwest Airlines WN 4530 Non-stop Boeing 737-800 (73H) 2:50 Effective 2026-01-10 through 2026-01-31
La 18:40 Denver (DEN) 20:30 San Jose (SJC) B
Southwest Airlines WN 4530 Non-stop Boeing 737-700 (Scimitar Winglets) 2:50 Operates only on 2026-02-07
Ma,To,Pe 19:05 Denver (DEN) 20:50 San Jose (SJC) B
Southwest Airlines WN 4530 Non-stop Boeing 737-700 (Scimitar Winglets) 2:45 Effective 2026-02-12 through 2026-02-16
To,Pe,Su 19:05 Denver (DEN) 20:50 San Jose (SJC) B
Southwest Airlines WN 4530 Non-stop Boeing 737-700 (Scimitar Winglets) 2:45 Effective 2026-02-20 through 2026-03-01
Ma-Ke 20:20 Denver (DEN) 22:10 San Jose (SJC) B
Southwest Airlines WN 4530 Non-stop Boeing 737 MAX 8 (7M8) 2:50 Effective 2026-01-06 through 2026-01-14
Ti-Pe,Su 20:20 Denver (DEN) 22:10 San Jose (SJC) B
Southwest Airlines WN 4530 Non-stop Boeing 737 MAX 8 (7M8) 2:50 Effective 2026-01-18 through 2026-01-23
Ma-Pe 20:20 Denver (DEN) 22:10 San Jose (SJC) B
Southwest Airlines WN 4530 Non-stop Boeing 737 MAX 8 (7M8) 2:50 Effective 2026-01-26 through 2026-02-04
Ti,Ke,Su 20:20 Denver (DEN) 22:10 San Jose (SJC) B
Southwest Airlines WN 4530 Non-stop Boeing 737 MAX 8 (7M8) 2:50 Effective 2026-02-08 through 2026-02-11
Ti,Ke 20:20 Denver (DEN) 22:10 San Jose (SJC) B
Southwest Airlines WN 4530 Non-stop Boeing 737 MAX 8 (7M8) 2:50 Effective 2026-02-18 through 2026-03-04
Ma,To,Pe 10:55 Denver (DEN) 12:35 San Jose (SJC) B
Southwest Airlines WN 4584 Non-stop Boeing 737-700 (Scimitar Winglets) 2:40 Effective 2026-02-12 through 2026-02-16
To,Pe,Su 10:55 Denver (DEN) 12:35 San Jose (SJC) B
Southwest Airlines WN 4584 Non-stop Boeing 737-700 (Scimitar Winglets) 2:40 Effective 2026-02-20 through 2026-03-01
To,Pe,Su 13:05 Denver (DEN) 14:50 San Jose (SJC) B
Southwest Airlines WN 4584 Non-stop Boeing 737 MAX 8 (7M8) 2:45 Effective 2026-01-11 through 2026-01-16
Ma,Su 13:05 Denver (DEN) 14:50 San Jose (SJC) B
Southwest Airlines WN 4584 Non-stop Boeing 737 MAX 8 (7M8) 2:45 Effective 2026-01-19 through 2026-01-25
To,Pe,Su 13:05 Denver (DEN) 14:50 San Jose (SJC) B
Southwest Airlines WN 4584 Non-stop Boeing 737 MAX 8 (7M8) 2:45 Effective 2026-02-01 through 2026-02-06
Ma,Su 13:05 Denver (DEN) 14:50 San Jose (SJC) B
Southwest Airlines WN 4584 Non-stop Boeing 737 MAX 8 (7M8) 2:45 Effective 2026-02-09 through 2026-02-15
Ma,Ti,To 13:05 Denver (DEN) 14:50 San Jose (SJC) B
Southwest Airlines WN 4584 Non-stop Boeing 737 MAX 8 (7M8) 2:45 Effective 2026-02-17 through 2026-02-23
Ma 13:05 Denver (DEN) 14:50 San Jose (SJC) B
Southwest Airlines WN 4584 Non-stop Boeing 737 MAX 8 (7M8) 2:45 Operates only on 2026-03-02
La 05:35 Denver (DEN) 07:25 San Jose (SJC) B
Southwest Airlines WN 4608 Non-stop Boeing 737 MAX 8 (7M8) 2:50 Valid until 2026-01-03
La 14:45 Denver (DEN) 16:30 San Jose (SJC) B
Southwest Airlines WN 4638 Non-stop Boeing 737 MAX 8 (7M8) 2:45 Effective 2026-01-10 through 2026-02-07
La 14:45 Denver (DEN) 16:30 San Jose (SJC) B
Southwest Airlines WN 4638 Non-stop Boeing 737-800 (73H) 2:45 Effective 2026-02-14 through 2026-02-28
Ma,To,Pe 15:40 Denver (DEN) 17:25 San Jose (SJC) B
Southwest Airlines WN 4638 Non-stop Boeing 737-700 (Scimitar Winglets) 2:45 Effective 2026-02-12 through 2026-02-16
To,Pe,Su 15:40 Denver (DEN) 17:25 San Jose (SJC) B
Southwest Airlines WN 4638 Non-stop Boeing 737-700 (Scimitar Winglets) 2:45 Effective 2026-02-20 through 2026-03-01
La 19:45 Denver (DEN) 21:20 San Jose (SJC) B
Southwest Airlines WN 4675 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Effective 2026-08-08 through 2026-09-26
La 16:05 Denver (DEN) 17:40 San Jose (SJC) B
Southwest Airlines WN 4744 Non-stop Boeing 737-800 (73H) 2:35 Effective 2026-08-08 through 2026-09-26
Ti,Ke 16:30 Denver (DEN) 18:05 San Jose (SJC) B
Southwest Airlines WN 4744 Non-stop Boeing 737-800 (73H) 2:35 Effective 2026-08-04 through 2026-09-30
Su 17:20 Denver (DEN) 18:55 San Jose (SJC) B
Southwest Airlines WN 4744 Non-stop Boeing 737-800 (73H) 2:35 Effective 2026-08-09 through 2026-09-27
La 09:45 Denver (DEN) 11:35 San Jose (SJC) B
Southwest Airlines WN 5120 Non-stop Boeing 737-700 (Scimitar Winglets) 2:50 Operates only on 2026-02-07
Pe 10:35 Denver (DEN) 12:20 San Jose (SJC) B
Southwest Airlines WN 5120 Non-stop Boeing 737-700 (Scimitar Winglets) 2:45 Operates only on 2026-02-06
Ma 12:15 Denver (DEN) 14:00 San Jose (SJC) B
Southwest Airlines WN 5120 Non-stop Boeing 737-700 (Scimitar Winglets) 2:45 Operates only on 2026-02-09
Välilaskulliset lennot:
La 17:25 Denver (DEN) 20:40 San Jose (SJC) B
Southwest Airlines WN 30 1-stop Boeing 737-700 (Scimitar Winglets) 4:15 Effective 2026-02-14 through 2026-02-28
Ma,To,Pe 08:35 Denver (DEN) 11:45 San Jose (SJC) B
Southwest Airlines WN 106 1-stop Boeing 737-700 (Scimitar Winglets) 4:10 Effective 2026-04-09 through 2026-06-01
Su 07:45 Denver (DEN) 10:55 San Jose (SJC) B
Southwest Airlines WN 439 1-stop Boeing 737-800 (73H) 4:10 Effective 2026-06-07 through 2026-08-02
Pe 14:10 Denver (DEN) 18:54 San Jose (SJC) A
United Airlines UA 618 1-stop Boeing 737-900 (739) 5:44 Operates only on 2026-01-09
Ma 12:05 Denver (DEN) 15:45 San Jose (SJC) B
Southwest Airlines WN 843 1-stop Boeing 737-700 (Scimitar Winglets) 4:40 Operates only on 2026-01-05
La 07:45 Denver (DEN) 11:05 San Jose (SJC) B
Southwest Airlines WN 1568 1-stop Boeing 737 MAX 8 (7M8) 4:20 Effective 2026-06-06 through 2026-08-01
Ma,To,Pe 13:05 Denver (DEN) 16:25 San Jose (SJC) B
Southwest Airlines WN 1570 1-stop Boeing 737-700 (Scimitar Winglets) 4:20 Effective 2026-06-04 through 2026-08-03
Ma,To,Pe 19:25 Denver (DEN) 23:25 San Jose (SJC) B
Southwest Airlines WN 1670 1-stop Boeing 737 MAX 8 (7M8) 5:00 Effective 2026-06-04 through 2026-08-03
Ma,To,Pe 11:00 Denver (DEN) 14:10 San Jose (SJC) B
Southwest Airlines WN 1691 1-stop Boeing 737-700 (Scimitar Winglets) 4:10 Effective 2026-03-05 through 2026-04-06
Ma 13:10 Denver (DEN) 16:30 San Jose (SJC) B
Southwest Airlines WN 1738 1-stop Boeing 737-700 (Scimitar Winglets) 4:20 Operates only on 2026-01-05
Su 17:45 Denver (DEN) 21:00 San Jose (SJC) B
Southwest Airlines WN 1855 1-stop Boeing 737-700 (Scimitar Winglets) 4:15 Effective 2026-03-08 through 2026-04-05
Ti,Ke 19:50 Denver (DEN) 23:00 San Jose (SJC) B
Southwest Airlines WN 1905 1-stop Boeing 737 MAX 8 (7M8) 4:10 Effective 2026-04-07 through 2026-06-03
Ma,Ti,Pe,Su 12:40 Denver (DEN) 16:00 San Jose (SJC) B
Southwest Airlines WN 1917 1-stop Boeing 737-800 (73H) 4:20 Valid until 2026-01-04
La 14:20 Denver (DEN) 17:30 San Jose (SJC) B
Southwest Airlines WN 1917 1-stop Boeing 737-700 (Scimitar Winglets) 4:10 Operates only on 2026-01-03
La 08:00 Denver (DEN) 11:40 San Jose (SJC) B
Southwest Airlines WN 1947 1-stop Boeing 737 MAX 8 (7M8) 4:40 Effective 2026-02-14 through 2026-02-28
prev   1 2 3 4 5 6 7 8   next


Kaikkien lentoyhtiöiden lennot: Denver (DEN) - San Jose (SJC).
Valitse lentopäivä:
LENTOAIKATAULU
Suorat lennot:

Effective 2026-01-11 through 2026-01-16
Ma
-
Ti
-
Ke
-
To
Pe
La
-
Su
Duration: 2:55, non-stop
Boeing 737-700 (Scimitar Winglets)

Suorat lennot:

Effective 2026-01-19 through 2026-01-25
Ma
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 2:55, non-stop
Boeing 737-700 (Scimitar Winglets)

Suorat lennot:

Effective 2026-02-01 through 2026-02-06
Ma
-
Ti
-
Ke
-
To
Pe
La
-
Su
Duration: 2:55, non-stop
Boeing 737-700 (Scimitar Winglets)

Suorat lennot:

Effective 2026-02-09 through 2026-02-15
Ma
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 2:55, non-stop
Boeing 737-700 (Scimitar Winglets)

Suorat lennot:

Effective 2026-02-17 through 2026-02-23
Ma
Ti
Ke
-
To
Pe
-
La
-
Su
-
Duration: 2:55, non-stop
Boeing 737-700 (Scimitar Winglets)

Suorat lennot:

Operates only on 2026-03-02
Ma
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 2:55, non-stop
Boeing 737-700 (Scimitar Winglets)

Suorat lennot:

Effective 2026-01-10 through 2026-01-31
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 2:50, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Operates only on 2026-02-07
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 2:50, non-stop
Boeing 737-700 (Scimitar Winglets)

Suorat lennot:

Effective 2026-02-12 through 2026-02-16
Ma
Ti
-
Ke
-
To
Pe
La
-
Su
-
Duration: 2:45, non-stop
Boeing 737-700 (Scimitar Winglets)

Suorat lennot:

Effective 2026-02-20 through 2026-03-01
Ma
-
Ti
-
Ke
-
To
Pe
La
-
Su
Duration: 2:45, non-stop
Boeing 737-700 (Scimitar Winglets)

Suorat lennot:

Effective 2026-01-06 through 2026-01-14
Ma
Ti
Ke
To
-
Pe
-
La
-
Su
-
Duration: 2:50, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Effective 2026-01-18 through 2026-01-23
Ma
-
Ti
Ke
To
Pe
La
-
Su
Duration: 2:50, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Effective 2026-01-26 through 2026-02-04
Ma
Ti
Ke
To
Pe
La
-
Su
-
Duration: 2:50, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Effective 2026-02-08 through 2026-02-11
Ma
-
Ti
Ke
To
-
Pe
-
La
-
Su
Duration: 2:50, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Effective 2026-02-18 through 2026-03-04
Ma
-
Ti
Ke
To
-
Pe
-
La
-
Su
-
Duration: 2:50, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Effective 2026-02-12 through 2026-02-16
Ma
Ti
-
Ke
-
To
Pe
La
-
Su
-
Duration: 2:40, non-stop
Boeing 737-700 (Scimitar Winglets)

Suorat lennot:

Effective 2026-02-20 through 2026-03-01
Ma
-
Ti
-
Ke
-
To
Pe
La
-
Su
Duration: 2:40, non-stop
Boeing 737-700 (Scimitar Winglets)

Suorat lennot:

Effective 2026-01-11 through 2026-01-16
Ma
-
Ti
-
Ke
-
To
Pe
La
-
Su
Duration: 2:45, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Effective 2026-01-19 through 2026-01-25
Ma
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 2:45, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Effective 2026-02-01 through 2026-02-06
Ma
-
Ti
-
Ke
-
To
Pe
La
-
Su
Duration: 2:45, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Effective 2026-02-09 through 2026-02-15
Ma
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 2:45, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Effective 2026-02-17 through 2026-02-23
Ma
Ti
Ke
-
To
Pe
-
La
-
Su
-
Duration: 2:45, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Operates only on 2026-03-02
Ma
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 2:45, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Valid until 2026-01-03
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 2:50, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Effective 2026-01-10 through 2026-02-07
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 2:45, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Effective 2026-02-14 through 2026-02-28
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 2:45, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Effective 2026-02-12 through 2026-02-16
Ma
Ti
-
Ke
-
To
Pe
La
-
Su
-
Duration: 2:45, non-stop
Boeing 737-700 (Scimitar Winglets)

Suorat lennot:

Effective 2026-02-20 through 2026-03-01
Ma
-
Ti
-
Ke
-
To
Pe
La
-
Su
Duration: 2:45, non-stop
Boeing 737-700 (Scimitar Winglets)

Suorat lennot:

Effective 2026-08-08 through 2026-09-26
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 2:35, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Effective 2026-08-08 through 2026-09-26
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 2:35, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Effective 2026-08-04 through 2026-09-30
Ma
-
Ti
Ke
To
-
Pe
-
La
-
Su
-
Duration: 2:35, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Effective 2026-08-09 through 2026-09-27
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 2:35, non-stop
Boeing 737-800 (73H)

Suorat lennot:

Operates only on 2026-02-07
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 2:50, non-stop
Boeing 737-700 (Scimitar Winglets)

Suorat lennot:

Operates only on 2026-02-06
Ma
-
Ti
-
Ke
-
To
-
Pe
La
-
Su
-
Duration: 2:45, non-stop
Boeing 737-700 (Scimitar Winglets)

Suorat lennot:

Operates only on 2026-02-09
Ma
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 2:45, non-stop
Boeing 737-700 (Scimitar Winglets)

Välilaskulliset lennot:

Effective 2026-02-14 through 2026-02-28
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 4:15, 1-stop
Boeing 737-700 (Scimitar Winglets)

Välilaskulliset lennot:

Effective 2026-04-09 through 2026-06-01
Ma
Ti
-
Ke
-
To
Pe
La
-
Su
-
Duration: 4:10, 1-stop
Boeing 737-700 (Scimitar Winglets)

Välilaskulliset lennot:

Effective 2026-06-07 through 2026-08-02
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 4:10, 1-stop
Boeing 737-800 (73H)

Välilaskulliset lennot:

Operates only on 2026-01-09
Ma
-
Ti
-
Ke
-
To
-
Pe
La
-
Su
-
Duration: 5:44, 1-stop
Boeing 737-900 (739)

Välilaskulliset lennot:

Operates only on 2026-01-05
Ma
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 4:40, 1-stop
Boeing 737-700 (Scimitar Winglets)

Välilaskulliset lennot:

Effective 2026-06-06 through 2026-08-01
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 4:20, 1-stop
Boeing 737 MAX 8 (7M8)

Välilaskulliset lennot:

Effective 2026-06-04 through 2026-08-03
Ma
Ti
-
Ke
-
To
Pe
La
-
Su
-
Duration: 4:20, 1-stop
Boeing 737-700 (Scimitar Winglets)

Välilaskulliset lennot:

Effective 2026-06-04 through 2026-08-03
Ma
Ti
-
Ke
-
To
Pe
La
-
Su
-
Duration: 5:00, 1-stop
Boeing 737 MAX 8 (7M8)

Välilaskulliset lennot:

Effective 2026-03-05 through 2026-04-06
Ma
Ti
-
Ke
-
To
Pe
La
-
Su
-
Duration: 4:10, 1-stop
Boeing 737-700 (Scimitar Winglets)

Välilaskulliset lennot:

Operates only on 2026-01-05
Ma
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 4:20, 1-stop
Boeing 737-700 (Scimitar Winglets)

Välilaskulliset lennot:

Effective 2026-03-08 through 2026-04-05
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 4:15, 1-stop
Boeing 737-700 (Scimitar Winglets)

Välilaskulliset lennot:

Effective 2026-04-07 through 2026-06-03
Ma
-
Ti
Ke
To
-
Pe
-
La
-
Su
-
Duration: 4:10, 1-stop
Boeing 737 MAX 8 (7M8)

Välilaskulliset lennot:

Valid until 2026-01-04
Ma
Ti
Ke
-
To
-
Pe
La
-
Su
Duration: 4:20, 1-stop
Boeing 737-800 (73H)

Välilaskulliset lennot:

Operates only on 2026-01-03
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 4:10, 1-stop
Boeing 737-700 (Scimitar Winglets)

Välilaskulliset lennot:

Effective 2026-02-14 through 2026-02-28
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 4:40, 1-stop
Boeing 737 MAX 8 (7M8)
prev        Page 4 / 8        next
  • Lentoreitti kentältä Denver (DEN) kentälle San Jose (SJC).
  • Lentoreitin pituus on 1521km (945 mailia).
  • Lähtökentän aikavyöhyke on UTC-7 , ja kohdekentän aikavyöhyke on UTC-8 . Kellonaika lähtökentällä on (loading...) ja kohdekentällä (loading...). Lentokenttien välillä on (loading...) tunnin aikaero.
  • Suorien lentojen lentoaika vaihtelee 2:30 ja 2:55 väliltä.