Kaikkien lentoyhtiöiden lennot: Cordoba (COR) - Mendoza (MDZ).

Valitse lentopäivä:
LENTOAIKATAULU
Suorat lennot:
Su 12:10 Cordoba (COR) 13:20 Mendoza (MDZ)
Aerolineas Argentinas AR 1535 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:10 Effective 2026-04-05 through 2026-06-28
Pe 12:15 Cordoba (COR) 13:25 Mendoza (MDZ)
Aerolineas Argentinas AR 1535 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:10 Effective 2026-04-03 through 2026-06-26
Ti 13:15 Cordoba (COR) 14:25 Mendoza (MDZ)
Aerolineas Argentinas AR 1535 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:10 Effective 2026-04-07 through 2026-06-23
Ma 16:45 Cordoba (COR) 17:55 Mendoza (MDZ)
Aerolineas Argentinas AR 1554 Non-stop Boeing 737-700 (73R) 1:10 Effective 2026-04-06 through 2026-06-22
Pe 11:40 Cordoba (COR) 12:50 Mendoza (MDZ)
Aerolineas Argentinas AR 1568 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:10 Operates only on 2026-07-03
La 11:50 Cordoba (COR) 13:00 Mendoza (MDZ)
Aerolineas Argentinas AR 1568 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:10 Operates only on 2026-07-04
Ma 11:55 Cordoba (COR) 13:05 Mendoza (MDZ)
Aerolineas Argentinas AR 1568 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:10 Effective 2026-01-05 through 2026-02-23
Ma,Pe 12:00 Cordoba (COR) 13:10 Mendoza (MDZ)
Aerolineas Argentinas AR 1568 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:10 Effective from 2026-07-06
Su 12:10 Cordoba (COR) 13:20 Mendoza (MDZ)
Aerolineas Argentinas AR 1568 Non-stop Boeing 737-800 (738) 1:10 Effective 2026-07-05 through 2026-08-30
Ma 12:15 Cordoba (COR) 13:25 Mendoza (MDZ)
Aerolineas Argentinas AR 1568 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:10 Effective 2026-03-02 through 2026-03-30
La 12:15 Cordoba (COR) 13:25 Mendoza (MDZ)
Aerolineas Argentinas AR 1568 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:10 Effective 2026-04-04 through 2026-06-27
Ma 12:15 Cordoba (COR) 13:25 Mendoza (MDZ)
Aerolineas Argentinas AR 1568 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:10 Operates only on 2026-06-29
La 12:15 Cordoba (COR) 13:25 Mendoza (MDZ)
Aerolineas Argentinas AR 1568 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:10 Effective from 2026-07-11
Su 12:20 Cordoba (COR) 13:30 Mendoza (MDZ)
Aerolineas Argentinas AR 1568 Non-stop Boeing 737-800 (738) 1:10 Effective from 2026-09-06
La 12:30 Cordoba (COR) 13:40 Mendoza (MDZ)
Aerolineas Argentinas AR 1568 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:10 Effective 2026-01-03 through 2026-02-28
Ti 12:30 Cordoba (COR) 13:40 Mendoza (MDZ)
Aerolineas Argentinas AR 1568 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:10 Effective 2026-03-03 through 2026-03-31
La 12:45 Cordoba (COR) 13:55 Mendoza (MDZ)
Aerolineas Argentinas AR 1568 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:10 Effective 2026-03-07 through 2026-03-28
Ke 13:00 Cordoba (COR) 14:10 Mendoza (MDZ)
Aerolineas Argentinas AR 1568 Non-stop Boeing 737-800 (738) 1:10 Effective 2026-04-01 through 2026-06-24
Ti 16:25 Cordoba (COR) 17:35 Mendoza (MDZ)
Aerolineas Argentinas AR 1568 Non-stop Boeing 737-800 (738) 1:10 Effective 2026-01-13 through 2026-01-27
To 16:45 Cordoba (COR) 17:55 Mendoza (MDZ)
Aerolineas Argentinas AR 1568 Non-stop Boeing 737-800 (738) 1:10 Effective 2026-07-09 through 2026-08-27
Ti 16:50 Cordoba (COR) 18:00 Mendoza (MDZ)
Aerolineas Argentinas AR 1568 Non-stop Boeing 737-800 (738) 1:10 Operates only on 2026-01-06
Ti 16:50 Cordoba (COR) 18:00 Mendoza (MDZ)
Aerolineas Argentinas AR 1568 Non-stop Boeing 737-800 (738) 1:10 Effective 2026-02-03 through 2026-02-24
Ti 17:45 Cordoba (COR) 18:55 Mendoza (MDZ)
Aerolineas Argentinas AR 1568 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:10 Operates only on 2026-06-30
Ti 17:45 Cordoba (COR) 18:55 Mendoza (MDZ)
Aerolineas Argentinas AR 1568 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:10 Effective from 2026-09-01
Ke 11:45 Cordoba (COR) 12:55 Mendoza (MDZ)
Aerolineas Argentinas AR 1570 Non-stop Boeing 737-700 (73R) 1:10 Operates only on 2026-01-07
Ke 11:45 Cordoba (COR) 12:55 Mendoza (MDZ)
Aerolineas Argentinas AR 1570 Non-stop Boeing 737-200 Combi (73M) 1:10 Effective 2026-01-14 through 2026-01-28
Ke 11:55 Cordoba (COR) 13:05 Mendoza (MDZ)
Aerolineas Argentinas AR 1570 Non-stop Boeing 737-200 Combi (73M) 1:10 Effective 2026-02-04 through 2026-02-25
To 15:20 Cordoba (COR) 16:30 Mendoza (MDZ)
Aerolineas Argentinas AR 1570 Non-stop Boeing 737-800 (738) 1:10 Operates only on 2026-01-01
Ke 16:30 Cordoba (COR) 17:40 Mendoza (MDZ)
Aerolineas Argentinas AR 1570 Non-stop Boeing 737-800 (738) 1:10 Effective 2026-07-08 through 2026-08-26
Su 16:35 Cordoba (COR) 17:45 Mendoza (MDZ)
Aerolineas Argentinas AR 1570 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:10 Effective from 2026-07-05
Pe,Su 17:00 Cordoba (COR) 18:10 Mendoza (MDZ)
Aerolineas Argentinas AR 1570 Non-stop Boeing 737-800 (738) 1:10 Effective 2026-03-01 through 2026-03-29
Ke 17:00 Cordoba (COR) 18:10 Mendoza (MDZ)
Aerolineas Argentinas AR 1570 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:10 Effective 2026-03-04 through 2026-03-25
Ke 17:00 Cordoba (COR) 18:10 Mendoza (MDZ)
Aerolineas Argentinas AR 1570 Non-stop Boeing 737-800 (738) 1:10 Operates only on 2026-07-01
Ke 17:00 Cordoba (COR) 18:10 Mendoza (MDZ)
Aerolineas Argentinas AR 1570 Non-stop Boeing 737-800 (738) 1:10 Effective from 2026-09-02
Pe 17:05 Cordoba (COR) 18:15 Mendoza (MDZ)
Aerolineas Argentinas AR 1570 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:10 Effective 2026-01-02 through 2026-02-27
Pe 17:05 Cordoba (COR) 18:15 Mendoza (MDZ)
Aerolineas Argentinas AR 1570 Non-stop Boeing 737-800 (738) 1:10 Effective 2026-07-10 through 2026-08-28
To 17:05 Cordoba (COR) 18:15 Mendoza (MDZ)
Aerolineas Argentinas AR 1570 Non-stop Boeing 737-800 (738) 1:10 Effective from 2026-09-03
Su 17:10 Cordoba (COR) 18:20 Mendoza (MDZ)
Aerolineas Argentinas AR 1570 Non-stop Boeing 737-800 (738) 1:10 Effective 2026-04-05 through 2026-06-28
To 17:15 Cordoba (COR) 18:25 Mendoza (MDZ)
Aerolineas Argentinas AR 1570 Non-stop Boeing 737-200 Combi (73M) 1:10 Operates only on 2026-01-08
To 17:15 Cordoba (COR) 18:25 Mendoza (MDZ)
Aerolineas Argentinas AR 1570 Non-stop Boeing 737-700 (73R) 1:10 Effective 2026-01-15 through 2026-01-22
To 17:15 Cordoba (COR) 18:25 Mendoza (MDZ)
Aerolineas Argentinas AR 1570 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:10 Operates only on 2026-01-29
To 17:15 Cordoba (COR) 18:25 Mendoza (MDZ)
Aerolineas Argentinas AR 1570 Non-stop Boeing 737-200 Combi (73M) 1:10 Effective 2026-02-05 through 2026-02-26
Ke 17:20 Cordoba (COR) 18:30 Mendoza (MDZ)
Aerolineas Argentinas AR 1570 Non-stop Boeing 737-800 (738) 1:10 Effective 2026-04-01 through 2026-06-24
Pe 17:20 Cordoba (COR) 18:30 Mendoza (MDZ)
Aerolineas Argentinas AR 1570 Non-stop Boeing 737-800 (738) 1:10 Operates only on 2026-07-03
Pe 17:30 Cordoba (COR) 18:40 Mendoza (MDZ)
Aerolineas Argentinas AR 1570 Non-stop Boeing 737-800 (738) 1:10 Effective 2026-04-03 through 2026-06-26
Ti 17:30 Cordoba (COR) 18:40 Mendoza (MDZ)
Aerolineas Argentinas AR 1570 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:10 Effective 2026-04-07 through 2026-06-23
Pe 13:00 Cordoba (COR) 14:10 Mendoza (MDZ)
Aerolineas Argentinas AR 1577 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:10 Effective 2026-03-06 through 2026-03-27
To 12:45 Cordoba (COR) 13:55 Mendoza (MDZ)
Aerolineas Argentinas AR 1579 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:10 Effective 2026-03-05 through 2026-03-26
Su 13:00 Cordoba (COR) 14:10 Mendoza (MDZ)
Aerolineas Argentinas AR 1579 Non-stop Boeing 737-800 (738) 1:10 Effective 2026-03-01 through 2026-03-29
Suorat codeshare-lennot:
Pe 13:00 Cordoba (COR) 14:10 Mendoza (MDZ)
Gol G3 3010 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:10 Effective 2026-03-06 through 2026-03-27
Codeshare lento, lennon lentää Aerolineas Argentinas.(AR 1577)
1 2 3   next


Kaikkien lentoyhtiöiden lennot: Cordoba (COR) - Mendoza (MDZ).
Valitse lentopäivä:
LENTOAIKATAULU
Suorat lennot:

Effective 2026-04-05 through 2026-06-28
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 1:10, non-stop
Embraer EMB 190 / EMB 195 (E90)

Suorat lennot:

Effective 2026-04-03 through 2026-06-26
Ma
-
Ti
-
Ke
-
To
-
Pe
La
-
Su
-
Duration: 1:10, non-stop
Embraer EMB 190 / EMB 195 (E90)

Suorat lennot:

Effective 2026-04-07 through 2026-06-23
Ma
-
Ti
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 1:10, non-stop
Embraer EMB 190 / EMB 195 (E90)

Suorat lennot:

Effective 2026-04-06 through 2026-06-22
Ma
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 1:10, non-stop
Boeing 737-700 (73R)

Suorat lennot:

Operates only on 2026-07-03
Ma
-
Ti
-
Ke
-
To
-
Pe
La
-
Su
-
Duration: 1:10, non-stop
Embraer EMB 190 / EMB 195 (E90)

Suorat lennot:

Operates only on 2026-07-04
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 1:10, non-stop
Embraer EMB 190 / EMB 195 (E90)

Suorat lennot:

Effective 2026-01-05 through 2026-02-23
Ma
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 1:10, non-stop
Embraer EMB 190 / EMB 195 (E90)

Suorat lennot:

Effective from 2026-07-06
Ma
Ti
-
Ke
-
To
-
Pe
La
-
Su
-
Duration: 1:10, non-stop
Embraer EMB 190 / EMB 195 (E90)

Suorat lennot:

Effective 2026-07-05 through 2026-08-30
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 1:10, non-stop
Boeing 737-800 (738)

Suorat lennot:

Effective 2026-03-02 through 2026-03-30
Ma
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 1:10, non-stop
Embraer EMB 190 / EMB 195 (E90)

Suorat lennot:

Effective 2026-04-04 through 2026-06-27
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 1:10, non-stop
Embraer EMB 190 / EMB 195 (E90)

Suorat lennot:

Operates only on 2026-06-29
Ma
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 1:10, non-stop
Embraer EMB 190 / EMB 195 (E90)

Suorat lennot:

Effective from 2026-07-11
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 1:10, non-stop
Embraer EMB 190 / EMB 195 (E90)

Suorat lennot:

Effective from 2026-09-06
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 1:10, non-stop
Boeing 737-800 (738)

Suorat lennot:

Effective 2026-01-03 through 2026-02-28
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 1:10, non-stop
Embraer EMB 190 / EMB 195 (E90)

Suorat lennot:

Effective 2026-03-03 through 2026-03-31
Ma
-
Ti
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 1:10, non-stop
Embraer EMB 190 / EMB 195 (E90)

Suorat lennot:

Effective 2026-03-07 through 2026-03-28
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 1:10, non-stop
Embraer EMB 190 / EMB 195 (E90)

Suorat lennot:

Effective 2026-04-01 through 2026-06-24
Ma
-
Ti
-
Ke
To
-
Pe
-
La
-
Su
-
Duration: 1:10, non-stop
Boeing 737-800 (738)

Suorat lennot:

Effective 2026-01-13 through 2026-01-27
Ma
-
Ti
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 1:10, non-stop
Boeing 737-800 (738)

Suorat lennot:

Effective 2026-07-09 through 2026-08-27
Ma
-
Ti
-
Ke
-
To
Pe
-
La
-
Su
-
Duration: 1:10, non-stop
Boeing 737-800 (738)

Suorat lennot:

Operates only on 2026-01-06
Ma
-
Ti
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 1:10, non-stop
Boeing 737-800 (738)

Suorat lennot:

Effective 2026-02-03 through 2026-02-24
Ma
-
Ti
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 1:10, non-stop
Boeing 737-800 (738)

Suorat lennot:

Operates only on 2026-06-30
Ma
-
Ti
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 1:10, non-stop
Embraer EMB 190 / EMB 195 (E90)

Suorat lennot:

Effective from 2026-09-01
Ma
-
Ti
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 1:10, non-stop
Embraer EMB 190 / EMB 195 (E90)

Suorat lennot:

Operates only on 2026-01-07
Ma
-
Ti
-
Ke
To
-
Pe
-
La
-
Su
-
Duration: 1:10, non-stop
Boeing 737-700 (73R)

Suorat lennot:

Effective 2026-01-14 through 2026-01-28
Ma
-
Ti
-
Ke
To
-
Pe
-
La
-
Su
-
Duration: 1:10, non-stop
Boeing 737-200 Combi (73M)

Suorat lennot:

Effective 2026-02-04 through 2026-02-25
Ma
-
Ti
-
Ke
To
-
Pe
-
La
-
Su
-
Duration: 1:10, non-stop
Boeing 737-200 Combi (73M)

Suorat lennot:

Operates only on 2026-01-01
Ma
-
Ti
-
Ke
-
To
Pe
-
La
-
Su
-
Duration: 1:10, non-stop
Boeing 737-800 (738)

Suorat lennot:

Effective 2026-07-08 through 2026-08-26
Ma
-
Ti
-
Ke
To
-
Pe
-
La
-
Su
-
Duration: 1:10, non-stop
Boeing 737-800 (738)

Suorat lennot:

Effective from 2026-07-05
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 1:10, non-stop
Embraer EMB 190 / EMB 195 (E90)

Suorat lennot:

Effective 2026-03-01 through 2026-03-29
Ma
-
Ti
-
Ke
-
To
-
Pe
La
-
Su
Duration: 1:10, non-stop
Boeing 737-800 (738)

Suorat lennot:

Effective 2026-03-04 through 2026-03-25
Ma
-
Ti
-
Ke
To
-
Pe
-
La
-
Su
-
Duration: 1:10, non-stop
Embraer EMB 190 / EMB 195 (E90)

Suorat lennot:

Operates only on 2026-07-01
Ma
-
Ti
-
Ke
To
-
Pe
-
La
-
Su
-
Duration: 1:10, non-stop
Boeing 737-800 (738)

Suorat lennot:

Effective from 2026-09-02
Ma
-
Ti
-
Ke
To
-
Pe
-
La
-
Su
-
Duration: 1:10, non-stop
Boeing 737-800 (738)

Suorat lennot:

Effective 2026-01-02 through 2026-02-27
Ma
-
Ti
-
Ke
-
To
-
Pe
La
-
Su
-
Duration: 1:10, non-stop
Embraer EMB 190 / EMB 195 (E90)

Suorat lennot:

Effective 2026-07-10 through 2026-08-28
Ma
-
Ti
-
Ke
-
To
-
Pe
La
-
Su
-
Duration: 1:10, non-stop
Boeing 737-800 (738)

Suorat lennot:

Effective from 2026-09-03
Ma
-
Ti
-
Ke
-
To
Pe
-
La
-
Su
-
Duration: 1:10, non-stop
Boeing 737-800 (738)

Suorat lennot:

Effective 2026-04-05 through 2026-06-28
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 1:10, non-stop
Boeing 737-800 (738)

Suorat lennot:

Operates only on 2026-01-08
Ma
-
Ti
-
Ke
-
To
Pe
-
La
-
Su
-
Duration: 1:10, non-stop
Boeing 737-200 Combi (73M)

Suorat lennot:

Effective 2026-01-15 through 2026-01-22
Ma
-
Ti
-
Ke
-
To
Pe
-
La
-
Su
-
Duration: 1:10, non-stop
Boeing 737-700 (73R)

Suorat lennot:

Operates only on 2026-01-29
Ma
-
Ti
-
Ke
-
To
Pe
-
La
-
Su
-
Duration: 1:10, non-stop
Embraer EMB 190 / EMB 195 (E90)

Suorat lennot:

Effective 2026-02-05 through 2026-02-26
Ma
-
Ti
-
Ke
-
To
Pe
-
La
-
Su
-
Duration: 1:10, non-stop
Boeing 737-200 Combi (73M)

Suorat lennot:

Effective 2026-04-01 through 2026-06-24
Ma
-
Ti
-
Ke
To
-
Pe
-
La
-
Su
-
Duration: 1:10, non-stop
Boeing 737-800 (738)

Suorat lennot:

Operates only on 2026-07-03
Ma
-
Ti
-
Ke
-
To
-
Pe
La
-
Su
-
Duration: 1:10, non-stop
Boeing 737-800 (738)

Suorat lennot:

Effective 2026-04-03 through 2026-06-26
Ma
-
Ti
-
Ke
-
To
-
Pe
La
-
Su
-
Duration: 1:10, non-stop
Boeing 737-800 (738)

Suorat lennot:

Effective 2026-04-07 through 2026-06-23
Ma
-
Ti
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 1:10, non-stop
Embraer EMB 190 / EMB 195 (E90)

Suorat lennot:

Effective 2026-03-06 through 2026-03-27
Ma
-
Ti
-
Ke
-
To
-
Pe
La
-
Su
-
Duration: 1:10, non-stop
Embraer EMB 190 / EMB 195 (E90)

Suorat lennot:

Effective 2026-03-05 through 2026-03-26
Ma
-
Ti
-
Ke
-
To
Pe
-
La
-
Su
-
Duration: 1:10, non-stop
Embraer EMB 190 / EMB 195 (E90)

Suorat lennot:

Effective 2026-03-01 through 2026-03-29
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 1:10, non-stop
Boeing 737-800 (738)

Suorat codeshare-lennot:

Effective 2026-03-06 through 2026-03-27
Ma
-
Ti
-
Ke
-
To
-
Pe
La
-
Su
-
Codeshare lento, lennon lentää Aerolineas Argentinas. (AR 1577)
Duration: 1:10, non-stop
Embraer EMB 190 / EMB 195 (E90)
Page 1 / 3        next
  • Lentoreitti kentältä Cordoba (COR) kentälle Mendoza (MDZ).
  • Lentoreitin pituus on 463km (288 mailia).
  • Sekä lähtökentän että kohdekentän aikavyöhyke on UTC-3 . Kellonaika molemmilla lentokentillä on (loading...).
  • Suorien lentojen lentoaika on 1:10.