Kaikkien lentoyhtiöiden lennot: Buenos Aires Jorge Newbery Airfield (AEP) - Esquel (EQS).

Valitse lentopäivä:
LENTOAIKATAULU
Suorat lennot:
Ke 07:30 Buenos Aires Jorge Newbery Airfield (AEP) 10:00 Esquel (EQS)
Aerolineas Argentinas AR 1816 Non-stop Boeing 737-800 (738) 2:30 Effective 2024-09-04 through 2024-09-11
Ke 07:30 Buenos Aires Jorge Newbery Airfield (AEP) 10:00 Esquel (EQS)
Aerolineas Argentinas AR 1816 Non-stop Boeing 737-800 (738) 2:30 Operates only on 2024-09-25
Su 08:30 Buenos Aires Jorge Newbery Airfield (AEP) 11:00 Esquel (EQS)
Aerolineas Argentinas AR 1816 Non-stop Boeing 737-200 Combi (73M) 2:30 Operates only on 2024-09-01
To 08:30 Buenos Aires Jorge Newbery Airfield (AEP) 11:00 Esquel (EQS)
Aerolineas Argentinas AR 1816 Non-stop Boeing 737-700 (73R) 2:30 Operates only on 2024-09-05
Su 08:30 Buenos Aires Jorge Newbery Airfield (AEP) 11:00 Esquel (EQS)
Aerolineas Argentinas AR 1816 Non-stop Boeing 737-800 (738) 2:30 Effective 2024-09-08 through 2024-09-15
To 08:30 Buenos Aires Jorge Newbery Airfield (AEP) 11:00 Esquel (EQS)
Aerolineas Argentinas AR 1816 Non-stop Boeing 737-200 Combi (73M) 2:30 Operates only on 2024-09-12
To,Su 08:30 Buenos Aires Jorge Newbery Airfield (AEP) 11:00 Esquel (EQS)
Aerolineas Argentinas AR 1816 Non-stop Boeing 737-800 (738) 2:30 Effective 2024-09-19 through 2024-09-22
To 08:30 Buenos Aires Jorge Newbery Airfield (AEP) 11:00 Esquel (EQS)
Aerolineas Argentinas AR 1816 Non-stop Boeing 737-200 Combi (73M) 2:30 Operates only on 2024-09-26
Su 08:30 Buenos Aires Jorge Newbery Airfield (AEP) 11:00 Esquel (EQS)
Aerolineas Argentinas AR 1816 Non-stop Boeing 737-800 (738) 2:30 Operates only on 2024-09-29
Ma 08:40 Buenos Aires Jorge Newbery Airfield (AEP) 11:10 Esquel (EQS)
Aerolineas Argentinas AR 1816 Non-stop Boeing 737-200 Combi (73M) 2:30 Operates only on 2024-10-07
Ma 08:40 Buenos Aires Jorge Newbery Airfield (AEP) 11:10 Esquel (EQS)
Aerolineas Argentinas AR 1816 Non-stop Boeing 737-800 (738) 2:30 Effective 2024-10-14 through 2024-12-30
Ma,Pe 09:10 Buenos Aires Jorge Newbery Airfield (AEP) 11:40 Esquel (EQS)
Aerolineas Argentinas AR 1816 Non-stop Boeing 737-800 (738) 2:30 Valid until 2024-09-16
Ma,Pe 09:10 Buenos Aires Jorge Newbery Airfield (AEP) 11:40 Esquel (EQS)
Aerolineas Argentinas AR 1816 Non-stop Boeing 737-800 (738) 2:30 Effective 2024-09-23 through 2024-09-30
Su 09:30 Buenos Aires Jorge Newbery Airfield (AEP) 12:00 Esquel (EQS)
Aerolineas Argentinas AR 1816 Non-stop Boeing 737-800 (738) 2:30 Effective 2024-10-06 through 2024-10-20
Su 09:30 Buenos Aires Jorge Newbery Airfield (AEP) 12:00 Esquel (EQS)
Aerolineas Argentinas AR 1816 Non-stop Boeing 737-800 (738) 2:30 Effective 2024-11-03 through 2024-12-29
Pe 09:45 Buenos Aires Jorge Newbery Airfield (AEP) 12:15 Esquel (EQS)
Aerolineas Argentinas AR 1816 Non-stop Boeing 737-800 (738) 2:30 Operates only on 2024-09-20
Su 09:55 Buenos Aires Jorge Newbery Airfield (AEP) 12:25 Esquel (EQS)
Aerolineas Argentinas AR 1816 Non-stop Boeing 737-800 (738) 2:30 Operates only on 2024-10-27
La 10:15 Buenos Aires Jorge Newbery Airfield (AEP) 12:45 Esquel (EQS)
Aerolineas Argentinas AR 1816 Non-stop Boeing 737-800 (738) 2:30 Operates only on 2024-10-05
La 10:15 Buenos Aires Jorge Newbery Airfield (AEP) 12:45 Esquel (EQS)
Aerolineas Argentinas AR 1816 Non-stop Boeing 737-800 (738) 2:30 Effective 2024-10-19 through 2024-12-28
Su 10:20 Buenos Aires Jorge Newbery Airfield (AEP) 12:50 Esquel (EQS)
Aerolineas Argentinas AR 1816 Non-stop Boeing 737-800 (738) 2:30 Effective from 2025-01-05
To 10:30 Buenos Aires Jorge Newbery Airfield (AEP) 13:00 Esquel (EQS)
Aerolineas Argentinas AR 1816 Non-stop Boeing 737-800 (738) 2:30 Effective 2024-10-03 through 2024-10-17
Pe 10:30 Buenos Aires Jorge Newbery Airfield (AEP) 13:00 Esquel (EQS)
Aerolineas Argentinas AR 1816 Non-stop Boeing 737-200 Combi (73M) 2:30 Operates only on 2024-10-11
Pe 10:30 Buenos Aires Jorge Newbery Airfield (AEP) 13:00 Esquel (EQS)
Aerolineas Argentinas AR 1816 Non-stop Boeing 737-800 (738) 2:30 Effective 2024-10-18 through 2024-10-25
To,Pe 10:30 Buenos Aires Jorge Newbery Airfield (AEP) 13:00 Esquel (EQS)
Aerolineas Argentinas AR 1816 Non-stop Boeing 737-800 (738) 2:30 Effective 2024-10-31 through 2024-11-01
Pe 10:30 Buenos Aires Jorge Newbery Airfield (AEP) 13:00 Esquel (EQS)
Aerolineas Argentinas AR 1816 Non-stop Boeing 737-800 (738) 2:30 Effective 2024-11-08 through 2024-12-27
Ke 10:35 Buenos Aires Jorge Newbery Airfield (AEP) 13:05 Esquel (EQS)
Aerolineas Argentinas AR 1816 Non-stop Boeing 737-800 (738) 2:30 Effective 2024-10-02 through 2024-12-25
Ke 09:40 Buenos Aires Jorge Newbery Airfield (AEP) 12:10 Esquel (EQS)
Aerolineas Argentinas AR 1818 Non-stop Boeing 737-800 (738) 2:30 Operates only on 2024-09-04
Ke 09:40 Buenos Aires Jorge Newbery Airfield (AEP) 12:10 Esquel (EQS)
Aerolineas Argentinas AR 1818 Non-stop Boeing 737-700 (73R) 2:30 Effective 2024-09-11 through 2024-09-18
Ke 09:40 Buenos Aires Jorge Newbery Airfield (AEP) 12:10 Esquel (EQS)
Aerolineas Argentinas AR 1818 Non-stop Boeing 737-800 (738) 2:30 Operates only on 2024-09-25
To 12:10 Buenos Aires Jorge Newbery Airfield (AEP) 14:40 Esquel (EQS)
Aerolineas Argentinas AR 1818 Non-stop Boeing 737-800 (738) 2:30 Effective from 2025-01-02
Pe 12:20 Buenos Aires Jorge Newbery Airfield (AEP) 14:50 Esquel (EQS)
Aerolineas Argentinas AR 1818 Non-stop Boeing 737-700 (73R) 2:30 Effective from 2025-01-03
Su 12:35 Buenos Aires Jorge Newbery Airfield (AEP) 15:05 Esquel (EQS)
Aerolineas Argentinas AR 1818 Non-stop Boeing 737-200 Combi (73M) 2:30 Effective 2024-10-06 through 2024-10-20
Su 12:35 Buenos Aires Jorge Newbery Airfield (AEP) 15:05 Esquel (EQS)
Aerolineas Argentinas AR 1818 Non-stop Boeing 737-800 (738) 2:30 Operates only on 2024-10-27
Su 12:35 Buenos Aires Jorge Newbery Airfield (AEP) 15:05 Esquel (EQS)
Aerolineas Argentinas AR 1818 Non-stop Boeing 737-200 Combi (73M) 2:30 Effective 2024-11-03 through 2024-12-29
Ma 12:50 Buenos Aires Jorge Newbery Airfield (AEP) 15:20 Esquel (EQS)
Aerolineas Argentinas AR 1818 Non-stop Boeing 737-800 (738) 2:30 Effective 2024-10-07 through 2024-10-28
La 12:55 Buenos Aires Jorge Newbery Airfield (AEP) 15:25 Esquel (EQS)
Aerolineas Argentinas AR 1818 Non-stop Boeing 737-800 (738) 2:30 Operates only on 2024-10-05
La 12:55 Buenos Aires Jorge Newbery Airfield (AEP) 15:25 Esquel (EQS)
Aerolineas Argentinas AR 1818 Non-stop Boeing 737-200 Combi (73M) 2:30 Operates only on 2024-10-12
La 12:55 Buenos Aires Jorge Newbery Airfield (AEP) 15:25 Esquel (EQS)
Aerolineas Argentinas AR 1818 Non-stop Boeing 737-800 (738) 2:30 Effective 2024-10-19 through 2024-11-02
Ma,La 12:55 Buenos Aires Jorge Newbery Airfield (AEP) 15:25 Esquel (EQS)
Aerolineas Argentinas AR 1818 Non-stop Boeing 737-800 (738) 2:30 Effective 2024-11-04 through 2024-12-30
To 13:55 Buenos Aires Jorge Newbery Airfield (AEP) 16:25 Esquel (EQS)
Aerolineas Argentinas AR 1818 Non-stop Boeing 737-800 (738) 2:30 Effective 2024-10-03 through 2024-10-10
To,Pe 13:55 Buenos Aires Jorge Newbery Airfield (AEP) 16:25 Esquel (EQS)
Aerolineas Argentinas AR 1818 Non-stop Boeing 737-800 (738) 2:30 Effective 2024-10-11 through 2024-10-17
Pe 13:55 Buenos Aires Jorge Newbery Airfield (AEP) 16:25 Esquel (EQS)
Aerolineas Argentinas AR 1818 Non-stop Boeing 737-200 Combi (73M) 2:30 Effective 2024-10-18 through 2024-10-25
To 13:55 Buenos Aires Jorge Newbery Airfield (AEP) 16:25 Esquel (EQS)
Aerolineas Argentinas AR 1818 Non-stop Boeing 737-800 (738) 2:30 Operates only on 2024-10-24
To,Pe 13:55 Buenos Aires Jorge Newbery Airfield (AEP) 16:25 Esquel (EQS)
Aerolineas Argentinas AR 1818 Non-stop Boeing 737-200 Combi (73M) 2:30 Effective 2024-10-31 through 2024-12-05
To 13:55 Buenos Aires Jorge Newbery Airfield (AEP) 16:25 Esquel (EQS)
Aerolineas Argentinas AR 1818 Non-stop Boeing 737-200 Combi (73M) 2:30 Effective 2024-12-12 through 2024-12-26
Su 14:05 Buenos Aires Jorge Newbery Airfield (AEP) 16:35 Esquel (EQS)
Aerolineas Argentinas AR 1820 Non-stop Boeing 737-800 (738) 2:30 Operates only on 2024-10-27
La 14:25 Buenos Aires Jorge Newbery Airfield (AEP) 16:55 Esquel (EQS)
Aerolineas Argentinas AR 1820 Non-stop Boeing 737-800 (738) 2:30 Operates only on 2024-10-26
La 14:30 Buenos Aires Jorge Newbery Airfield (AEP) 17:00 Esquel (EQS)
Aerolineas Argentinas AR 1820 Non-stop Boeing 737-800 (738) 2:30 Effective from 2025-01-04
Ke 14:45 Buenos Aires Jorge Newbery Airfield (AEP) 17:15 Esquel (EQS)
Aerolineas Argentinas AR 1820 Non-stop Boeing 737-800 (738) 2:30 Effective 2024-10-02 through 2024-12-25
Ma 15:20 Buenos Aires Jorge Newbery Airfield (AEP) 17:50 Esquel (EQS)
Aerolineas Argentinas AR 1820 Non-stop Boeing 737-800 (738) 2:30 Effective from 2025-01-06
1 2   next


Kaikkien lentoyhtiöiden lennot: Buenos Aires Jorge Newbery Airfield (AEP) - Esquel (EQS).
Valitse lentopäivä:
LENTOAIKATAULU
Suorat lennot:

Effective 2024-09-04 through 2024-09-11
Ma
-
Ti
-
Ke
To
-
Pe
-
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737-800 (738)

Operates only on 2024-09-25
Ma
-
Ti
-
Ke
To
-
Pe
-
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737-800 (738)

Operates only on 2024-09-01
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 2:30, non-stop
Boeing 737-200 Combi (73M)

Operates only on 2024-09-05
Ma
-
Ti
-
Ke
-
To
Pe
-
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737-700 (73R)

Effective 2024-09-08 through 2024-09-15
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 2:30, non-stop
Boeing 737-800 (738)

Operates only on 2024-09-12
Ma
-
Ti
-
Ke
-
To
Pe
-
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737-200 Combi (73M)

Effective 2024-09-19 through 2024-09-22
Ma
-
Ti
-
Ke
-
To
Pe
-
La
-
Su
Duration: 2:30, non-stop
Boeing 737-800 (738)

Operates only on 2024-09-26
Ma
-
Ti
-
Ke
-
To
Pe
-
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737-200 Combi (73M)

Operates only on 2024-09-29
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 2:30, non-stop
Boeing 737-800 (738)

Operates only on 2024-10-07
Ma
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737-200 Combi (73M)

Effective 2024-10-14 through 2024-12-30
Ma
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737-800 (738)

Valid until 2024-09-16
Ma
Ti
-
Ke
-
To
-
Pe
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737-800 (738)

Effective 2024-09-23 through 2024-09-30
Ma
Ti
-
Ke
-
To
-
Pe
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737-800 (738)

Effective 2024-10-06 through 2024-10-20
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 2:30, non-stop
Boeing 737-800 (738)

Effective 2024-11-03 through 2024-12-29
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 2:30, non-stop
Boeing 737-800 (738)

Operates only on 2024-09-20
Ma
-
Ti
-
Ke
-
To
-
Pe
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737-800 (738)

Operates only on 2024-10-27
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 2:30, non-stop
Boeing 737-800 (738)

Operates only on 2024-10-05
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 2:30, non-stop
Boeing 737-800 (738)

Effective 2024-10-19 through 2024-12-28
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 2:30, non-stop
Boeing 737-800 (738)

Effective from 2025-01-05
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 2:30, non-stop
Boeing 737-800 (738)

Effective 2024-10-03 through 2024-10-17
Ma
-
Ti
-
Ke
-
To
Pe
-
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737-800 (738)

Operates only on 2024-10-11
Ma
-
Ti
-
Ke
-
To
-
Pe
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737-200 Combi (73M)

Effective 2024-10-18 through 2024-10-25
Ma
-
Ti
-
Ke
-
To
-
Pe
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737-800 (738)

Effective 2024-10-31 through 2024-11-01
Ma
-
Ti
-
Ke
-
To
Pe
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737-800 (738)

Effective 2024-11-08 through 2024-12-27
Ma
-
Ti
-
Ke
-
To
-
Pe
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737-800 (738)

Effective 2024-10-02 through 2024-12-25
Ma
-
Ti
-
Ke
To
-
Pe
-
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737-800 (738)

Operates only on 2024-09-04
Ma
-
Ti
-
Ke
To
-
Pe
-
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737-800 (738)

Effective 2024-09-11 through 2024-09-18
Ma
-
Ti
-
Ke
To
-
Pe
-
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737-700 (73R)

Operates only on 2024-09-25
Ma
-
Ti
-
Ke
To
-
Pe
-
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737-800 (738)

Effective from 2025-01-02
Ma
-
Ti
-
Ke
-
To
Pe
-
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737-800 (738)

Effective from 2025-01-03
Ma
-
Ti
-
Ke
-
To
-
Pe
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737-700 (73R)

Effective 2024-10-06 through 2024-10-20
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 2:30, non-stop
Boeing 737-200 Combi (73M)

Operates only on 2024-10-27
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 2:30, non-stop
Boeing 737-800 (738)

Effective 2024-11-03 through 2024-12-29
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 2:30, non-stop
Boeing 737-200 Combi (73M)

Effective 2024-10-07 through 2024-10-28
Ma
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737-800 (738)

Operates only on 2024-10-05
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 2:30, non-stop
Boeing 737-800 (738)

Operates only on 2024-10-12
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 2:30, non-stop
Boeing 737-200 Combi (73M)

Effective 2024-10-19 through 2024-11-02
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 2:30, non-stop
Boeing 737-800 (738)

Effective 2024-11-04 through 2024-12-30
Ma
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 2:30, non-stop
Boeing 737-800 (738)

Effective 2024-10-03 through 2024-10-10
Ma
-
Ti
-
Ke
-
To
Pe
-
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737-800 (738)

Effective 2024-10-11 through 2024-10-17
Ma
-
Ti
-
Ke
-
To
Pe
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737-800 (738)

Effective 2024-10-18 through 2024-10-25
Ma
-
Ti
-
Ke
-
To
-
Pe
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737-200 Combi (73M)

Operates only on 2024-10-24
Ma
-
Ti
-
Ke
-
To
Pe
-
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737-800 (738)

Effective 2024-10-31 through 2024-12-05
Ma
-
Ti
-
Ke
-
To
Pe
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737-200 Combi (73M)

Effective 2024-12-12 through 2024-12-26
Ma
-
Ti
-
Ke
-
To
Pe
-
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737-200 Combi (73M)

Operates only on 2024-10-27
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 2:30, non-stop
Boeing 737-800 (738)

Operates only on 2024-10-26
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 2:30, non-stop
Boeing 737-800 (738)

Effective from 2025-01-04
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 2:30, non-stop
Boeing 737-800 (738)

Effective 2024-10-02 through 2024-12-25
Ma
-
Ti
-
Ke
To
-
Pe
-
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737-800 (738)

Effective from 2025-01-06
Ma
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 2:30, non-stop
Boeing 737-800 (738)
Page 1 / 2        next
  • Lentoreitti kentältä Buenos Aires Jorge Newbery Airfield (AEP) kentälle Esquel (EQS).
  • Lentoreitin pituus on 1439km (894 mailia).
  • Sekä lähtökentän että kohdekentän aikavyöhyke on UTC-3 . Kellonaika molemmilla lentokentillä on (loading...).
  • Suorien lentojen lentoaika on 2:30.