LATAM Airlines lento LA 2274: Lima - Chiclayo

Valitse lentopäivä:
LENTOAIKATAULU
Suorat lennot:
To 09:40 Lima (LIM) 11:10 Chiclayo (CIX)
LA 2274 Non-stop Airbus A319 (319) 1:30 Operates only on 2025-05-01
Ma-La 09:40 Lima (LIM) 11:10 Chiclayo (CIX)
LA 2274 Non-stop Airbus A320 (320) 1:30 Effective 2025-05-02 through 2025-05-14
Ti,To,La 09:40 Lima (LIM) 11:10 Chiclayo (CIX)
LA 2274 Non-stop Airbus A319 (319) 1:30 Effective 2025-05-15 through 2025-05-22
Ma,Ke,Pe 09:40 Lima (LIM) 11:10 Chiclayo (CIX)
LA 2274 Non-stop Airbus A320 (320) 1:30 Effective 2025-05-16 through 2025-05-21
Ma,Ke,Pe 09:40 Lima (LIM) 11:10 Chiclayo (CIX)
LA 2274 Non-stop Airbus A319 (319) 1:30 Effective 2025-05-23 through 2025-05-28
Ti,To-La 09:40 Lima (LIM) 11:10 Chiclayo (CIX)
LA 2274 Non-stop Airbus A320 (320) 1:30 Effective 2025-05-24 through 2025-05-31
Su 09:40 Lima (LIM) 11:10 Chiclayo (CIX)
LA 2274 Non-stop Airbus A319 (319) 1:30 Operates only on 2025-06-01
Päivittäin 09:40 Lima (LIM) 11:10 Chiclayo (CIX)
LA 2274 Non-stop Airbus A320 (320) 1:30 Effective 2025-06-02 through 2025-06-16
Ti 09:40 Lima (LIM) 11:10 Chiclayo (CIX)
LA 2274 Non-stop Airbus A319 (319) 1:30 Operates only on 2025-06-17
Päivittäin 09:40 Lima (LIM) 11:10 Chiclayo (CIX)
LA 2274 Non-stop Airbus A320 (320) 1:30 Effective 2025-06-18 through 2025-06-25
Ti,To,La 09:40 Lima (LIM) 11:10 Chiclayo (CIX)
LA 2274 Non-stop Airbus A319 (319) 1:30 Effective 2025-06-26 through 2025-07-01
Ma,Ke-Pe,Su 09:40 Lima (LIM) 11:10 Chiclayo (CIX)
LA 2274 Non-stop Airbus A320 (320) 1:30 Effective 2025-06-27 through 2025-07-04
Ke-Su 09:40 Lima (LIM) 11:10 Chiclayo (CIX)
LA 2274 Non-stop Airbus A320 (320) 1:30 Effective 2025-07-05 through 2025-07-11
Ma,Ti,La 09:40 Lima (LIM) 11:10 Chiclayo (CIX)
LA 2274 Non-stop Airbus A319 (319) 1:30 Effective 2025-07-07 through 2025-07-21
Ke-Pe,Su 09:40 Lima (LIM) 11:10 Chiclayo (CIX)
LA 2274 Non-stop Airbus A320 (320) 1:30 Effective 2025-07-13 through 2025-07-20
Ma-To 09:40 Lima (LIM) 11:10 Chiclayo (CIX)
LA 2274 Non-stop Airbus A320 (320) 1:30 Effective 2025-07-22 through 2025-07-28
Ti,Ke,Pe-Su 09:40 Lima (LIM) 11:10 Chiclayo (CIX)
LA 2274 Non-stop Airbus A319 (319) 1:30 Effective 2025-07-25 through 2025-07-30
Ti-Su 09:40 Lima (LIM) 11:10 Chiclayo (CIX)
LA 2274 Non-stop Airbus A320 (320) 1:30 Effective 2025-07-31 through 2025-08-08
Ma,La 09:40 Lima (LIM) 11:10 Chiclayo (CIX)
LA 2274 Non-stop Airbus A319 (319) 1:30 Effective 2025-08-04 through 2025-08-09
Ma,Ke,Pe-Su 09:40 Lima (LIM) 11:10 Chiclayo (CIX)
LA 2274 Non-stop Airbus A320 (320) 1:30 Effective 2025-08-10 through 2025-08-17
Ma,Ti,To 09:40 Lima (LIM) 11:10 Chiclayo (CIX)
LA 2274 Non-stop Airbus A319 (319) 1:30 Effective 2025-08-12 through 2025-08-19
Ma-Ke,La 09:40 Lima (LIM) 11:10 Chiclayo (CIX)
LA 2274 Non-stop Airbus A319 (319) 1:30 Effective 2025-08-20 through 2025-08-26
Ke-Pe,Su 09:40 Lima (LIM) 11:10 Chiclayo (CIX)
LA 2274 Non-stop Airbus A320 (320) 1:30 Effective 2025-08-21 through 2025-08-31
Ma,To,La 09:40 Lima (LIM) 11:10 Chiclayo (CIX)
LA 2274 Non-stop Airbus A319 (319) 1:30 Effective 2025-08-30 through 2025-09-06
Ma-Ke,Pe,Su 09:40 Lima (LIM) 11:10 Chiclayo (CIX)
LA 2274 Non-stop Airbus A320 (320) 1:30 Effective 2025-09-02 through 2025-09-08
Ma,Ti,Su 09:40 Lima (LIM) 11:10 Chiclayo (CIX)
LA 2274 Non-stop Airbus A319 (319) 1:30 Effective 2025-09-09 through 2025-09-15
Ti-La 09:40 Lima (LIM) 11:10 Chiclayo (CIX)
LA 2274 Non-stop Airbus A320 (320) 1:30 Effective 2025-09-10 through 2025-09-16
Ti,Ke,La 09:40 Lima (LIM) 11:10 Chiclayo (CIX)
LA 2274 Non-stop Airbus A319 (319) 1:30 Effective 2025-09-17 through 2025-09-23
Ma,Ke-Pe,Su 09:40 Lima (LIM) 11:10 Chiclayo (CIX)
LA 2274 Non-stop Airbus A320 (320) 1:30 Effective 2025-09-18 through 2025-09-26
La,Su 09:40 Lima (LIM) 11:10 Chiclayo (CIX)
LA 2274 Non-stop Airbus A320 (320) 1:30 Effective 2025-09-27 through 2025-09-28
Ma,Ti 09:40 Lima (LIM) 11:10 Chiclayo (CIX)
LA 2274 Non-stop Airbus A319 (319) 1:30 Effective 2025-09-29 through 2025-09-30
Ke,Su 09:45 Lima (LIM) 11:10 Chiclayo (CIX)
LA 2274 Non-stop Airbus A320 (320) 1:25 Valid until 2025-05-04
Su 09:45 Lima (LIM) 11:10 Chiclayo (CIX)
LA 2274 Non-stop Airbus A320 (320) 1:25 Operates only on 2025-05-11
Su 09:45 Lima (LIM) 11:10 Chiclayo (CIX)
LA 2274 Non-stop Airbus A319 (319) 1:25 Operates only on 2025-05-18
Su 09:45 Lima (LIM) 11:10 Chiclayo (CIX)
LA 2274 Non-stop Airbus A320 (320) 1:25 Operates only on 2025-05-25
Ma-Pe 11:50 Lima (LIM) 13:20 Chiclayo (CIX)
LA 2274 Non-stop Airbus A320 (320) 1:30 Effective 2025-10-01 through 2025-10-08
To-La 11:50 Lima (LIM) 13:20 Chiclayo (CIX)
LA 2274 Non-stop Airbus A319 (319) 1:30 Effective 2025-10-04 through 2025-10-11
Ma-Pe 11:50 Lima (LIM) 13:20 Chiclayo (CIX)
LA 2274 Non-stop Airbus A320 (320) 1:30 Effective 2025-10-13 through 2025-10-22
To,La 11:50 Lima (LIM) 13:20 Chiclayo (CIX)
LA 2274 Non-stop Airbus A319 (319) 1:30 Effective 2025-10-18 through 2025-10-23
Ma,To-La 11:50 Lima (LIM) 13:20 Chiclayo (CIX)
LA 2274 Non-stop Airbus A320 (320) 1:30 Effective 2025-10-24 through 2025-11-03
Ti,Ke 11:50 Lima (LIM) 13:20 Chiclayo (CIX)
LA 2274 Non-stop Airbus A319 (319) 1:30 Effective 2025-10-28 through 2025-11-05
Ke,To 11:50 Lima (LIM) 13:20 Chiclayo (CIX)
LA 2274 Non-stop Airbus A319 (319) 1:30 Effective 2025-11-06 through 2025-11-13
Ma,Ti,Pe,La 11:50 Lima (LIM) 13:20 Chiclayo (CIX)
LA 2274 Non-stop Airbus A320 (320) 1:30 Effective 2025-11-07 through 2025-11-14
Ke,To,La 11:50 Lima (LIM) 13:20 Chiclayo (CIX)
LA 2274 Non-stop Airbus A319 (319) 1:30 Effective 2025-11-15 through 2025-11-20
Ma,Ti,Pe,La 11:50 Lima (LIM) 13:20 Chiclayo (CIX)
LA 2274 Non-stop Airbus A320 (320) 1:30 Effective 2025-11-17 through 2025-11-25
Ma-Ke,Pe 11:50 Lima (LIM) 13:20 Chiclayo (CIX)
LA 2274 Non-stop Airbus A320 (320) 1:30 Effective 2025-11-26 through 2025-12-03
To,La 11:50 Lima (LIM) 13:20 Chiclayo (CIX)
LA 2274 Non-stop Airbus A319 (319) 1:30 Effective 2025-11-27 through 2025-11-29
Ma,Ke-La 11:50 Lima (LIM) 13:20 Chiclayo (CIX)
LA 2274 Non-stop Airbus A320 (320) 1:30 Effective 2025-12-04 through 2025-12-22
Ti 11:50 Lima (LIM) 13:20 Chiclayo (CIX)
LA 2274 Non-stop Airbus A319 (319) 1:30 Effective 2025-12-09 through 2025-12-23
Ti,Ke 11:50 Lima (LIM) 13:20 Chiclayo (CIX)
LA 2274 Non-stop Airbus A319 (319) 1:30 Effective 2025-12-24 through 2025-12-31
Ma,To-La 11:50 Lima (LIM) 13:20 Chiclayo (CIX)
LA 2274 Non-stop Airbus A320 (320) 1:30 Effective 2025-12-25 through 2025-12-29
Ke,To 11:50 Lima (LIM) 13:20 Chiclayo (CIX)
LA 2274 Non-stop Airbus A319 (319) 1:30 Effective 2026-01-01 through 2026-01-15
Ma,Ti,Pe,La 11:50 Lima (LIM) 13:20 Chiclayo (CIX)
LA 2274 Non-stop Airbus A320 (320) 1:30 Effective 2026-01-02 through 2026-01-16
To,La 11:50 Lima (LIM) 13:20 Chiclayo (CIX)
LA 2274 Non-stop Airbus A319 (319) 1:30 Effective 2026-01-17 through 2026-01-22
Ma-Ke,Pe,La 11:50 Lima (LIM) 13:20 Chiclayo (CIX)
LA 2274 Non-stop Airbus A320 (320) 1:30 Effective 2026-01-19 through 2026-01-28
Ma,Ke-La 11:50 Lima (LIM) 13:20 Chiclayo (CIX)
LA 2274 Non-stop Airbus A320 (320) 1:30 Effective 2026-01-29 through 2026-02-06
Ti,La 11:50 Lima (LIM) 13:20 Chiclayo (CIX)
LA 2274 Non-stop Airbus A319 (319) 1:30 Effective 2026-02-03 through 2026-02-10
Ma,Ke-La 11:50 Lima (LIM) 13:20 Chiclayo (CIX)
LA 2274 Non-stop Airbus A320 (320) 1:30 Effective 2026-02-09 through 2026-02-16
Ti,Ke 11:50 Lima (LIM) 13:20 Chiclayo (CIX)
LA 2274 Non-stop Airbus A319 (319) 1:30 Effective 2026-02-17 through 2026-02-25
Ma,To-La 11:50 Lima (LIM) 13:20 Chiclayo (CIX)
LA 2274 Non-stop Airbus A320 (320) 1:30 Effective 2026-02-19 through 2026-02-23
Ke,To,La 11:50 Lima (LIM) 13:20 Chiclayo (CIX)
LA 2274 Non-stop Airbus A319 (319) 1:30 Effective from 2026-02-26
Ma,Ti,Pe 11:50 Lima (LIM) 13:20 Chiclayo (CIX)
LA 2274 Non-stop Airbus A320 (320) 1:30 Effective from 2026-02-27
LATAM Airlines lento LA 2274:
Lima - Chiclayo
Valitse lentopäivä:
LENTOAIKATAULU
Suorat lennot:

LATAM Airlines LA2274
Operates only on 2025-05-01
Ma
-
Ti
-
Ke
-
To
Pe
-
La
-
Su
-
Duration: 1:30, non-stop
Airbus A319 (319)

LATAM Airlines LA2274
Effective 2025-05-02 through 2025-05-14
Ma
Ti
Ke
To
Pe
La
Su
-
Duration: 1:30, non-stop
Airbus A320 (320)

LATAM Airlines LA2274
Effective 2025-05-15 through 2025-05-22
Ma
-
Ti
Ke
-
To
Pe
-
La
Su
-
Duration: 1:30, non-stop
Airbus A319 (319)

LATAM Airlines LA2274
Effective 2025-05-16 through 2025-05-21
Ma
Ti
-
Ke
To
-
Pe
La
-
Su
-
Duration: 1:30, non-stop
Airbus A320 (320)

LATAM Airlines LA2274
Effective 2025-05-23 through 2025-05-28
Ma
Ti
-
Ke
To
-
Pe
La
-
Su
-
Duration: 1:30, non-stop
Airbus A319 (319)

LATAM Airlines LA2274
Effective 2025-05-24 through 2025-05-31
Ma
-
Ti
Ke
-
To
Pe
La
Su
-
Duration: 1:30, non-stop
Airbus A320 (320)

LATAM Airlines LA2274
Operates only on 2025-06-01
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 1:30, non-stop
Airbus A319 (319)

LATAM Airlines LA2274
Effective 2025-06-02 through 2025-06-16
Ma
Ti
Ke
To
Pe
La
Su
Duration: 1:30, non-stop
Airbus A320 (320)

LATAM Airlines LA2274
Operates only on 2025-06-17
Ma
-
Ti
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 1:30, non-stop
Airbus A319 (319)

LATAM Airlines LA2274
Effective 2025-06-18 through 2025-06-25
Ma
Ti
Ke
To
Pe
La
Su
Duration: 1:30, non-stop
Airbus A320 (320)

LATAM Airlines LA2274
Effective 2025-06-26 through 2025-07-01
Ma
-
Ti
Ke
-
To
Pe
-
La
Su
-
Duration: 1:30, non-stop
Airbus A319 (319)

LATAM Airlines LA2274
Effective 2025-06-27 through 2025-07-04
Ma
Ti
-
Ke
To
Pe
La
-
Su
Duration: 1:30, non-stop
Airbus A320 (320)

LATAM Airlines LA2274
Effective 2025-07-05 through 2025-07-11
Ma
-
Ti
-
Ke
To
Pe
La
Su
Duration: 1:30, non-stop
Airbus A320 (320)

LATAM Airlines LA2274
Effective 2025-07-07 through 2025-07-21
Ma
Ti
Ke
-
To
-
Pe
-
La
Su
-
Duration: 1:30, non-stop
Airbus A319 (319)

LATAM Airlines LA2274
Effective 2025-07-13 through 2025-07-20
Ma
-
Ti
-
Ke
To
Pe
La
-
Su
Duration: 1:30, non-stop
Airbus A320 (320)

LATAM Airlines LA2274
Effective 2025-07-22 through 2025-07-28
Ma
Ti
Ke
To
Pe
-
La
-
Su
-
Duration: 1:30, non-stop
Airbus A320 (320)

LATAM Airlines LA2274
Effective 2025-07-25 through 2025-07-30
Ma
-
Ti
Ke
To
-
Pe
La
Su
Duration: 1:30, non-stop
Airbus A319 (319)

LATAM Airlines LA2274
Effective 2025-07-31 through 2025-08-08
Ma
-
Ti
Ke
To
Pe
La
Su
Duration: 1:30, non-stop
Airbus A320 (320)

LATAM Airlines LA2274
Effective 2025-08-04 through 2025-08-09
Ma
Ti
-
Ke
-
To
-
Pe
-
La
Su
-
Duration: 1:30, non-stop
Airbus A319 (319)

LATAM Airlines LA2274
Effective 2025-08-10 through 2025-08-17
Ma
Ti
-
Ke
To
-
Pe
La
Su
Duration: 1:30, non-stop
Airbus A320 (320)

LATAM Airlines LA2274
Effective 2025-08-12 through 2025-08-19
Ma
Ti
Ke
-
To
Pe
-
La
-
Su
-
Duration: 1:30, non-stop
Airbus A319 (319)

LATAM Airlines LA2274
Effective 2025-08-20 through 2025-08-26
Ma
Ti
Ke
To
-
Pe
-
La
Su
-
Duration: 1:30, non-stop
Airbus A319 (319)

LATAM Airlines LA2274
Effective 2025-08-21 through 2025-08-31
Ma
-
Ti
-
Ke
To
Pe
La
-
Su
Duration: 1:30, non-stop
Airbus A320 (320)

LATAM Airlines LA2274
Effective 2025-08-30 through 2025-09-06
Ma
Ti
-
Ke
-
To
Pe
-
La
Su
-
Duration: 1:30, non-stop
Airbus A319 (319)

LATAM Airlines LA2274
Effective 2025-09-02 through 2025-09-08
Ma
Ti
Ke
To
-
Pe
La
-
Su
Duration: 1:30, non-stop
Airbus A320 (320)

LATAM Airlines LA2274
Effective 2025-09-09 through 2025-09-15
Ma
Ti
Ke
-
To
-
Pe
-
La
-
Su
Duration: 1:30, non-stop
Airbus A319 (319)

LATAM Airlines LA2274
Effective 2025-09-10 through 2025-09-16
Ma
-
Ti
Ke
To
Pe
La
Su
-
Duration: 1:30, non-stop
Airbus A320 (320)

LATAM Airlines LA2274
Effective 2025-09-17 through 2025-09-23
Ma
-
Ti
Ke
To
-
Pe
-
La
Su
-
Duration: 1:30, non-stop
Airbus A319 (319)

LATAM Airlines LA2274
Effective 2025-09-18 through 2025-09-26
Ma
Ti
-
Ke
To
Pe
La
-
Su
Duration: 1:30, non-stop
Airbus A320 (320)

LATAM Airlines LA2274
Effective 2025-09-27 through 2025-09-28
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
Su
Duration: 1:30, non-stop
Airbus A320 (320)

LATAM Airlines LA2274
Effective 2025-09-29 through 2025-09-30
Ma
Ti
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 1:30, non-stop
Airbus A319 (319)

LATAM Airlines LA2274
Valid until 2025-05-04
Ma
-
Ti
-
Ke
To
-
Pe
-
La
-
Su
Duration: 1:25, non-stop
Airbus A320 (320)

LATAM Airlines LA2274
Operates only on 2025-05-11
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 1:25, non-stop
Airbus A320 (320)

LATAM Airlines LA2274
Operates only on 2025-05-18
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 1:25, non-stop
Airbus A319 (319)

LATAM Airlines LA2274
Operates only on 2025-05-25
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 1:25, non-stop
Airbus A320 (320)

LATAM Airlines LA2274
Effective 2025-10-01 through 2025-10-08
Ma
Ti
Ke
To
Pe
La
-
Su
-
Duration: 1:30, non-stop
Airbus A320 (320)

LATAM Airlines LA2274
Effective 2025-10-04 through 2025-10-11
Ma
-
Ti
-
Ke
-
To
Pe
La
Su
-
Duration: 1:30, non-stop
Airbus A319 (319)

LATAM Airlines LA2274
Effective 2025-10-13 through 2025-10-22
Ma
Ti
Ke
To
Pe
La
-
Su
-
Duration: 1:30, non-stop
Airbus A320 (320)

LATAM Airlines LA2274
Effective 2025-10-18 through 2025-10-23
Ma
-
Ti
-
Ke
-
To
Pe
-
La
Su
-
Duration: 1:30, non-stop
Airbus A319 (319)

LATAM Airlines LA2274
Effective 2025-10-24 through 2025-11-03
Ma
Ti
-
Ke
-
To
Pe
La
Su
-
Duration: 1:30, non-stop
Airbus A320 (320)

LATAM Airlines LA2274
Effective 2025-10-28 through 2025-11-05
Ma
-
Ti
Ke
To
-
Pe
-
La
-
Su
-
Duration: 1:30, non-stop
Airbus A319 (319)

LATAM Airlines LA2274
Effective 2025-11-06 through 2025-11-13
Ma
-
Ti
-
Ke
To
Pe
-
La
-
Su
-
Duration: 1:30, non-stop
Airbus A319 (319)

LATAM Airlines LA2274
Effective 2025-11-07 through 2025-11-14
Ma
Ti
Ke
-
To
-
Pe
La
Su
-
Duration: 1:30, non-stop
Airbus A320 (320)

LATAM Airlines LA2274
Effective 2025-11-15 through 2025-11-20
Ma
-
Ti
-
Ke
To
Pe
-
La
Su
-
Duration: 1:30, non-stop
Airbus A319 (319)

LATAM Airlines LA2274
Effective 2025-11-17 through 2025-11-25
Ma
Ti
Ke
-
To
-
Pe
La
Su
-
Duration: 1:30, non-stop
Airbus A320 (320)

LATAM Airlines LA2274
Effective 2025-11-26 through 2025-12-03
Ma
Ti
Ke
To
-
Pe
La
-
Su
-
Duration: 1:30, non-stop
Airbus A320 (320)

LATAM Airlines LA2274
Effective 2025-11-27 through 2025-11-29
Ma
-
Ti
-
Ke
-
To
Pe
-
La
Su
-
Duration: 1:30, non-stop
Airbus A319 (319)

LATAM Airlines LA2274
Effective 2025-12-04 through 2025-12-22
Ma
Ti
-
Ke
To
Pe
La
Su
-
Duration: 1:30, non-stop
Airbus A320 (320)

LATAM Airlines LA2274
Effective 2025-12-09 through 2025-12-23
Ma
-
Ti
Ke
-
To
-
Pe
-
La
-
Su
-
Duration: 1:30, non-stop
Airbus A319 (319)

LATAM Airlines LA2274
Effective 2025-12-24 through 2025-12-31
Ma
-
Ti
Ke
To
-
Pe
-
La
-
Su
-
Duration: 1:30, non-stop
Airbus A319 (319)

LATAM Airlines LA2274
Effective 2025-12-25 through 2025-12-29
Ma
Ti
-
Ke
-
To
Pe
La
Su
-
Duration: 1:30, non-stop
Airbus A320 (320)

LATAM Airlines LA2274
Effective 2026-01-01 through 2026-01-15
Ma
-
Ti
-
Ke
To
Pe
-
La
-
Su
-
Duration: 1:30, non-stop
Airbus A319 (319)

LATAM Airlines LA2274
Effective 2026-01-02 through 2026-01-16
Ma
Ti
Ke
-
To
-
Pe
La
Su
-
Duration: 1:30, non-stop
Airbus A320 (320)

LATAM Airlines LA2274
Effective 2026-01-17 through 2026-01-22
Ma
-
Ti
-
Ke
-
To
Pe
-
La
Su
-
Duration: 1:30, non-stop
Airbus A319 (319)

LATAM Airlines LA2274
Effective 2026-01-19 through 2026-01-28
Ma
Ti
Ke
To
-
Pe
La
Su
-
Duration: 1:30, non-stop
Airbus A320 (320)

LATAM Airlines LA2274
Effective 2026-01-29 through 2026-02-06
Ma
Ti
-
Ke
To
Pe
La
Su
-
Duration: 1:30, non-stop
Airbus A320 (320)

LATAM Airlines LA2274
Effective 2026-02-03 through 2026-02-10
Ma
-
Ti
Ke
-
To
-
Pe
-
La
Su
-
Duration: 1:30, non-stop
Airbus A319 (319)

LATAM Airlines LA2274
Effective 2026-02-09 through 2026-02-16
Ma
Ti
-
Ke
To
Pe
La
Su
-
Duration: 1:30, non-stop
Airbus A320 (320)

LATAM Airlines LA2274
Effective 2026-02-17 through 2026-02-25
Ma
-
Ti
Ke
To
-
Pe
-
La
-
Su
-
Duration: 1:30, non-stop
Airbus A319 (319)

LATAM Airlines LA2274
Effective 2026-02-19 through 2026-02-23
Ma
Ti
-
Ke
-
To
Pe
La
Su
-
Duration: 1:30, non-stop
Airbus A320 (320)

LATAM Airlines LA2274
Effective from 2026-02-26
Ma
-
Ti
-
Ke
To
Pe
-
La
Su
-
Duration: 1:30, non-stop
Airbus A319 (319)

LATAM Airlines LA2274
Effective from 2026-02-27
Ma
Ti
Ke
-
To
-
Pe
La
-
Su
-
Duration: 1:30, non-stop
Airbus A320 (320)
  • LA 2274 on lento kentältä Lima (LIM) kentälle Chiclayo (CIX).
  • Lentoreitin pituus on 653km (406 mailia).
  • Sekä lähtökentän että kohdekentän aikavyöhyke on UTC-5 . Kellonaika molemmilla lentokentillä on (loading...).
  • Suorien lentojen lentoaika vaihtelee 1:25 ja 1:30 väliltä.