Akasa Air lento QP 1504: Guwahati - Mumbai Chhatrapati Shivaji

Valitse lentopäivä:
LENTOAIKATAULU
Suorat lennot:
Päivittäin 17:20 Guwahati (GAU) 21:10 Mumbai Chhatrapati Shivaji (BOM) 1
QP 1504 Non-stop Boeing 737 MAX 8 (7M8) 3:50 Valid until 2026-01-25
Ti-La 17:20 Guwahati (GAU) 21:10 Mumbai Chhatrapati Shivaji (BOM) 1
QP 1504 Non-stop Boeing 737 MAX 8 (7M8) 3:50 Effective 2026-01-27 through 2026-01-31
Päivittäin 17:25 Guwahati (GAU) 21:10 Mumbai Chhatrapati Shivaji (BOM) 1
QP 1504 Non-stop Boeing 737 MAX 8 (7M8) 3:45 Effective 2026-02-01 through 2026-03-28
Ma-La 17:25 Guwahati (GAU) 21:10 Mumbai Chhatrapati Shivaji (BOM) 1
QP 1504 Non-stop Boeing 737 MAX 8 (7M8) 3:45 Effective from 2026-03-30
Su 17:55 Guwahati (GAU) 21:40 Mumbai Chhatrapati Shivaji (BOM) 1
QP 1504 Non-stop Boeing 737 MAX 8 (7M8) 3:45 Effective from 2026-03-29
Akasa Air lento QP 1504:
Guwahati - Mumbai Chhatrapati Shivaji
Valitse lentopäivä:
LENTOAIKATAULU
Suorat lennot:

Akasa Air QP1504
Valid until 2026-01-25
Ma
Ti
Ke
To
Pe
La
Su
Duration: 3:50, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Akasa Air QP1504
Effective 2026-01-27 through 2026-01-31
Ma
-
Ti
Ke
To
Pe
La
Su
-
Duration: 3:50, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Akasa Air QP1504
Effective 2026-02-01 through 2026-03-28
Ma
Ti
Ke
To
Pe
La
Su
Duration: 3:45, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Akasa Air QP1504
Effective from 2026-03-30
Ma
Ti
Ke
To
Pe
La
Su
-
Duration: 3:45, non-stop
Boeing 737 MAX 8 (7M8)

Suorat lennot:

Akasa Air QP1504
Effective from 2026-03-29
Ma
-
Ti
-
Ke
-
To
-
Pe
-
La
-
Su
Duration: 3:45, non-stop
Boeing 737 MAX 8 (7M8)
  • QP 1504 on lento kentältä Guwahati (GAU) kentälle Mumbai Chhatrapati Shivaji (BOM).
  • Lentoreitin pituus on 2071km (1287 mailia).
  • Sekä lähtökentän että kohdekentän aikavyöhyke on UTC+5.5 . Kellonaika molemmilla lentokentillä on (loading...).
  • Suorien lentojen lentoaika vaihtelee 3:45 ja 3:50 väliltä.