Todas las líneas aéreas volando desde Sharm el-Sheikh (SSH) a Cairo (CAI).

Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:
Vie 10:30 Sharm el-Sheikh (SSH) 2 11:30 Cairo (CAI) 3
EgyptAir MS 223 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2024-09-06
This is a Non-scheduled Passenger flight.
Vie,Dom 10:40 Sharm el-Sheikh (SSH) 2 11:40 Cairo (CAI) 3
EgyptAir MS 223 Non-stop Airbus A320 (320) 1:00 Effective 2025-03-30 through 2025-04-20
This is a Non-scheduled Passenger flight.
Mar,Dom 11:30 Sharm el-Sheikh (SSH) 2 12:30 Cairo (CAI) 3
EgyptAir MS 223 Non-stop Boeing 737-800 (738) 1:00 Valid until 2024-09-03
This is a Non-scheduled Passenger flight.
Dom 11:40 Sharm el-Sheikh (SSH) 2 12:40 Cairo (CAI) 3
EgyptAir MS 223 Non-stop Airbus A320neo (32N) 1:00 Operates only on 2024-09-08
This is a Non-scheduled Passenger flight.
Vie 11:40 Sharm el-Sheikh (SSH) 2 12:40 Cairo (CAI) 3
EgyptAir MS 223 Non-stop Boeing 737-800 (738) 1:00 Effective 2024-09-13 through 2024-09-20
This is a Non-scheduled Passenger flight.
Dom 11:40 Sharm el-Sheikh (SSH) 2 12:40 Cairo (CAI) 3
EgyptAir MS 223 Non-stop Boeing 737-800 (738) 1:00 Effective 2024-09-15 through 2024-09-29
This is a Non-scheduled Passenger flight.
Vie 11:40 Sharm el-Sheikh (SSH) 2 12:40 Cairo (CAI) 3
EgyptAir MS 223 Non-stop Airbus A220-300 (223) 1:00 Effective 2024-09-27 through 2024-10-04
This is a Non-scheduled Passenger flight.
Vie,Dom 11:40 Sharm el-Sheikh (SSH) 2 12:40 Cairo (CAI) 3
EgyptAir MS 223 Non-stop Airbus A220-300 (223) 1:00 Effective 2024-10-06 through 2024-10-25
This is a Non-scheduled Passenger flight.
Lun-Mie 11:40 Sharm el-Sheikh (SSH) 2 12:40 Cairo (CAI) 3
EgyptAir MS 223 Non-stop Boeing 737-800 (738) 1:00 Effective 2025-03-31 through 2025-04-23
This is a Non-scheduled Passenger flight.
Jue 11:40 Sharm el-Sheikh (SSH) 2 12:40 Cairo (CAI) 3
EgyptAir MS 223 Non-stop Airbus A320neo (32N) 1:00 Effective 2025-04-03 through 2025-04-24
This is a Non-scheduled Passenger flight.
Vie,Dom 11:40 Sharm el-Sheikh (SSH) 2 12:40 Cairo (CAI) 3
EgyptAir MS 223 Non-stop Airbus A320 (320) 1:00 Effective from 2025-04-25
This is a Non-scheduled Passenger flight.
Jue 12:00 Sharm el-Sheikh (SSH) 2 13:00 Cairo (CAI) 3
EgyptAir MS 223 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2024-09-05
This is a Non-scheduled Passenger flight.
Mar 12:10 Sharm el-Sheikh (SSH) 2 13:10 Cairo (CAI) 3
EgyptAir MS 223 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2024-10-01
This is a Non-scheduled Passenger flight.
Mar,Mie 12:40 Sharm el-Sheikh (SSH) 2 13:40 Cairo (CAI) 3
EgyptAir MS 223 Non-stop Boeing 737-800 (738) 1:00 Effective 2024-09-04 through 2024-09-11
This is a Non-scheduled Passenger flight.
Mar-Jue 12:40 Sharm el-Sheikh (SSH) 2 13:40 Cairo (CAI) 3
EgyptAir MS 223 Non-stop Boeing 737-800 (738) 1:00 Effective 2024-09-12 through 2024-09-18
This is a Non-scheduled Passenger flight.
Jue 12:40 Sharm el-Sheikh (SSH) 2 13:40 Cairo (CAI) 3
EgyptAir MS 223 Non-stop Airbus A320neo (32N) 1:00 Effective 2024-09-19 through 2024-09-26
This is a Non-scheduled Passenger flight.
Mar,Mie 12:40 Sharm el-Sheikh (SSH) 2 13:40 Cairo (CAI) 3
EgyptAir MS 223 Non-stop Boeing 737-800 (738) 1:00 Effective 2024-09-24 through 2024-09-25
This is a Non-scheduled Passenger flight.
Mar-Jue 12:40 Sharm el-Sheikh (SSH) 2 13:40 Cairo (CAI) 3
EgyptAir MS 223 Non-stop Boeing 737-800 (738) 1:00 Effective 2024-10-02 through 2024-10-09
This is a Non-scheduled Passenger flight.
Jue 12:40 Sharm el-Sheikh (SSH) 2 13:40 Cairo (CAI) 3
EgyptAir MS 223 Non-stop Airbus A320neo (32N) 1:00 Effective 2024-10-10 through 2024-10-24
This is a Non-scheduled Passenger flight.
Mar,Mie 12:40 Sharm el-Sheikh (SSH) 2 13:40 Cairo (CAI) 3
EgyptAir MS 223 Non-stop Boeing 737-800 (738) 1:00 Effective 2024-10-15 through 2024-10-23
This is a Non-scheduled Passenger flight.
Lun-Mie 12:40 Sharm el-Sheikh (SSH) 2 13:40 Cairo (CAI) 3
EgyptAir MS 223 Non-stop Boeing 737-800 (738) 1:00 Effective from 2025-04-28
This is a Non-scheduled Passenger flight.
Jue 12:40 Sharm el-Sheikh (SSH) 2 13:40 Cairo (CAI) 3
EgyptAir MS 223 Non-stop Airbus A320neo (32N) 1:00 Effective from 2025-05-01
This is a Non-scheduled Passenger flight.
Dom 19:15 Sharm el-Sheikh (SSH) 2 20:15 Cairo (CAI) 3
EgyptAir MS 227 Non-stop Airbus A320neo (32N) 1:00 Effective 2025-03-30 through 2025-04-20
This is a Non-scheduled Passenger flight.
Sab 19:15 Sharm el-Sheikh (SSH) 2 20:15 Cairo (CAI) 3
EgyptAir MS 227 Non-stop Boeing 737-800 (738) 1:00 Effective 2025-04-05 through 2025-04-19
This is a Non-scheduled Passenger flight.
Sab 20:15 Sharm el-Sheikh (SSH) 2 21:15 Cairo (CAI) 3
EgyptAir MS 227 Non-stop Boeing 737-800 (738) 1:00 Valid until 2024-09-21
This is a Non-scheduled Passenger flight.
Dom 20:15 Sharm el-Sheikh (SSH) 2 21:15 Cairo (CAI) 3
EgyptAir MS 227 Non-stop Airbus A320neo (32N) 1:00 Valid until 2024-10-20
This is a Non-scheduled Passenger flight.
Sab 20:15 Sharm el-Sheikh (SSH) 2 21:15 Cairo (CAI) 3
EgyptAir MS 227 Non-stop Boeing 737-800 (738) 1:00 Effective 2024-10-05 through 2024-10-26
This is a Non-scheduled Passenger flight.
Sab 20:15 Sharm el-Sheikh (SSH) 2 21:15 Cairo (CAI) 3
EgyptAir MS 227 Non-stop Boeing 737-800 (738) 1:00 Effective from 2025-04-26
This is a Non-scheduled Passenger flight.
Dom 20:15 Sharm el-Sheikh (SSH) 2 21:15 Cairo (CAI) 3
EgyptAir MS 227 Non-stop Airbus A320neo (32N) 1:00 Effective from 2025-04-27
This is a Non-scheduled Passenger flight.
Sab 20:45 Sharm el-Sheikh (SSH) 2 21:45 Cairo (CAI) 3
EgyptAir MS 227 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2024-09-28
This is a Non-scheduled Passenger flight.
Dom 23:35 Sharm el-Sheikh (SSH) 2 00:35 Cairo (CAI) 3
EgyptAir MS 229 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2024-10-27
The flight arrives 1 day after departure.
Mie 11:10 Sharm el-Sheikh (SSH) 2 12:10 Cairo (CAI) 3
EgyptAir MS 233 Non-stop Boeing 737-800 (738) 1:00 Effective 2024-11-06 through 2025-03-26
This is a Non-scheduled Passenger flight.
Mie 12:10 Sharm el-Sheikh (SSH) 2 13:10 Cairo (CAI) 3
EgyptAir MS 233 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2024-10-30
This is a Non-scheduled Passenger flight.
Dom 18:50 Sharm el-Sheikh (SSH) 2 19:50 Cairo (CAI) 3
EgyptAir MS 256 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2024-11-10
This is a Non-scheduled Passenger flight.
Jue,Sab 08:25 Sharm el-Sheikh (SSH) 2 09:25 Cairo (CAI) 3
EgyptAir MS 323 Non-stop Boeing 737-800 (738) 1:00 Effective 2024-09-05 through 2024-09-07
This is a Non-scheduled Passenger flight.
Lun 09:30 Sharm el-Sheikh (SSH) 2 10:30 Cairo (CAI) 3
EgyptAir MS 323 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2024-09-02
This is a Non-scheduled Passenger flight.
Lun 06:00 Sharm el-Sheikh (SSH) 2 07:00 Cairo (CAI) 3
EgyptAir MS 325 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2024-09-09
This is a Non-scheduled Passenger flight.
Dom 15:15 Sharm el-Sheikh (SSH) 2 16:15 Cairo (CAI) 3
EgyptAir MS 325 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2024-09-22
This is a Non-scheduled Passenger flight.
Vie 00:10 Sharm el-Sheikh (SSH) 2 01:10 Cairo (CAI) 2
Neos NO 4018 Non-stop Boeing 737 (737) 1:00 Operates only on 2024-09-20
Vie 00:25 Sharm el-Sheikh (SSH) 2 01:25 Cairo (CAI) 2
Neos NO 4018 Non-stop Boeing 737 (737) 1:00 Operates only on 2024-09-27
Vie 00:25 Sharm el-Sheikh (SSH) 2 01:25 Cairo (CAI) 2
Neos NO 4480 Non-stop Boeing 737 (737) 1:00 Operates only on 2024-10-04
Vie 00:25 Sharm el-Sheikh (SSH) 2 01:25 Cairo (CAI) 2
Neos NO 4481 Non-stop Boeing 737 (737) 1:00 Operates only on 2024-10-04
Jue 13:10 Sharm el-Sheikh (SSH) 2 14:10 Cairo (CAI) 2
Neos NO 4930 Non-stop Boeing 737 (737) 1:00 Effective 2024-09-05 through 2024-09-12
Jue 13:10 Sharm el-Sheikh (SSH) 2 14:10 Cairo (CAI) 2
Neos NO 4931 Non-stop Boeing 737 (737) 1:00 Effective 2024-09-05 through 2024-09-12
Vuelos no directos:
Diario 15:30 Sharm el-Sheikh (SSH) 2 17:55 Cairo (CAI) 3
EgyptAir MS 24 1-stop Boeing 737-800 (738) 2:25 Effective 2024-11-01 through 2025-03-29
Mar-Jue,Dom 16:30 Sharm el-Sheikh (SSH) 2 18:55 Cairo (CAI) 3
EgyptAir MS 24 1-stop Boeing 737-800 (738) 2:25 Effective 2024-10-27 through 2024-10-31
Vuelos directos de código compartido:
Vie,Dom 21:30 Sharm el-Sheikh (SSH) 2 22:40 Cairo (CAI) 3
Air Canada AC 2863 Non-stop Airbus A320neo (32N) 1:10 Effective 2025-03-30 through 2025-04-20
Codeshare flight, operated by EgyptAir.(MS 29)
Mar-Jue,Sab 21:30 Sharm el-Sheikh (SSH) 2 22:40 Cairo (CAI) 3
Air Canada AC 2863 Non-stop Boeing 737-800 (73H) 1:10 Effective 2025-04-01 through 2025-04-24
Codeshare flight, operated by EgyptAir.(MS 29)
Sab 21:35 Sharm el-Sheikh (SSH) 2 22:40 Cairo (CAI) 3
Air Canada AC 2863 Non-stop Boeing 737-800 (73H) 1:05 Effective 2024-11-02 through 2025-03-29
Codeshare flight, operated by EgyptAir.(MS 29)
Lun-Jue 21:35 Sharm el-Sheikh (SSH) 2 22:40 Cairo (CAI) 3
Air Canada AC 2863 Non-stop Airbus A320neo (32N) 1:05 Effective 2024-11-04 through 2025-03-27
Codeshare flight, operated by EgyptAir.(MS 29)
prev   1 2 3 4 5 6 7   next


Todas las líneas aéreas volando desde Sharm el-Sheikh (SSH) a Cairo (CAI).
Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:

Operates only on 2024-09-06
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Effective 2025-03-30 through 2025-04-20
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
Duration: 1:00, non-stop
Airbus A320 (320)

Valid until 2024-09-03
This is a Non-scheduled Passenger flight.
Lun
-
Mar
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:00, non-stop
Boeing 737-800 (738)

Operates only on 2024-09-08
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:00, non-stop
Airbus A320neo (32N)

Effective 2024-09-13 through 2024-09-20
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Effective 2024-09-15 through 2024-09-29
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:00, non-stop
Boeing 737-800 (738)

Effective 2024-09-27 through 2024-10-04
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 1:00, non-stop
Airbus A220-300 (223)

Effective 2024-10-06 through 2024-10-25
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
Duration: 1:00, non-stop
Airbus A220-300 (223)

Effective 2025-03-31 through 2025-04-23
This is a Non-scheduled Passenger flight.
Lun
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Effective 2025-04-03 through 2025-04-24
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:00, non-stop
Airbus A320neo (32N)

Effective from 2025-04-25
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
Duration: 1:00, non-stop
Airbus A320 (320)

Operates only on 2024-09-05
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Operates only on 2024-10-01
This is a Non-scheduled Passenger flight.
Lun
-
Mar
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Effective 2024-09-04 through 2024-09-11
This is a Non-scheduled Passenger flight.
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Effective 2024-09-12 through 2024-09-18
This is a Non-scheduled Passenger flight.
Lun
-
Mar
Mie
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Effective 2024-09-19 through 2024-09-26
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:00, non-stop
Airbus A320neo (32N)

Effective 2024-09-24 through 2024-09-25
This is a Non-scheduled Passenger flight.
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Effective 2024-10-02 through 2024-10-09
This is a Non-scheduled Passenger flight.
Lun
-
Mar
Mie
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Effective 2024-10-10 through 2024-10-24
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:00, non-stop
Airbus A320neo (32N)

Effective 2024-10-15 through 2024-10-23
This is a Non-scheduled Passenger flight.
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Effective from 2025-04-28
This is a Non-scheduled Passenger flight.
Lun
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Effective from 2025-05-01
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:00, non-stop
Airbus A320neo (32N)

Effective 2025-03-30 through 2025-04-20
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:00, non-stop
Airbus A320neo (32N)

Effective 2025-04-05 through 2025-04-19
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Valid until 2024-09-21
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Valid until 2024-10-20
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:00, non-stop
Airbus A320neo (32N)

Effective 2024-10-05 through 2024-10-26
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Effective from 2025-04-26
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Effective from 2025-04-27
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:00, non-stop
Airbus A320neo (32N)

Operates only on 2024-09-28
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

23:35

00:35(+1)
Operates only on 2024-10-27
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:00, non-stop
Boeing 737-800 (738)
The flight arrives 1 day after departure.

Effective 2024-11-06 through 2025-03-26
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Operates only on 2024-10-30
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Operates only on 2024-11-10
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:00, non-stop
Boeing 737-800 (738)

Effective 2024-09-05 through 2024-09-07
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
Dom
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Operates only on 2024-09-02
This is a Non-scheduled Passenger flight.
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Operates only on 2024-09-09
This is a Non-scheduled Passenger flight.
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Operates only on 2024-09-22
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:00, non-stop
Boeing 737-800 (738)

Operates only on 2024-09-20
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 1:00, non-stop
Boeing 737 (737)

Operates only on 2024-09-27
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 1:00, non-stop
Boeing 737 (737)

Operates only on 2024-10-04
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 1:00, non-stop
Boeing 737 (737)

Operates only on 2024-10-04
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 1:00, non-stop
Boeing 737 (737)

Effective 2024-09-05 through 2024-09-12
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:00, non-stop
Boeing 737 (737)

Effective 2024-09-05 through 2024-09-12
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:00, non-stop
Boeing 737 (737)

Vuelos no directos:

Effective 2024-11-01 through 2025-03-29
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Duration: 2:25, 1-stop
Boeing 737-800 (738)

Effective 2024-10-27 through 2024-10-31
Lun
-
Mar
Mie
Jue
Vie
-
Sab
-
Dom
Duration: 2:25, 1-stop
Boeing 737-800 (738)

Vuelos directos de código compartido:

Effective 2025-03-30 through 2025-04-20
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
Codeshare flight, operated by EgyptAir. (MS 29)
Duration: 1:10, non-stop
Airbus A320neo (32N)

Effective 2025-04-01 through 2025-04-24
Lun
-
Mar
Mie
Jue
Vie
-
Sab
Dom
-
Codeshare flight, operated by EgyptAir. (MS 29)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Effective 2024-11-02 through 2025-03-29
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Codeshare flight, operated by EgyptAir. (MS 29)
Duration: 1:05, non-stop
Boeing 737-800 (73H)

Effective 2024-11-04 through 2025-03-27
Lun
Mar
Mie
Jue
Vie
-
Sab
-
Dom
-
Codeshare flight, operated by EgyptAir. (MS 29)
Duration: 1:05, non-stop
Airbus A320neo (32N)
prev        Page 3 / 7        next
  • Una ruta nacional saliendo desde el aeropuerto Sharm el-Sheikh (SSH) y llegando al aeropuerto Cairo (CAI).
  • El vuelo tiene una distancia de 234 millas, o 377 km.
  • La zona horaria tanto del aeropuerto de salida como del de llegada es UTC+2 . La hora actual en ambos aeropuertos es (loading...).
  • Para vuelos directos, el tiempo de vuelo oscila entre 1:00 y 1:35.