Todas las líneas aéreas volando desde Salvador (SSA) a Belo Horizonte (CNF).

Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:
Lun-Sab 04:10 Salvador (SSA) 06:00 Belo Horizonte (CNF)
Gol G3 1808 Non-stop Boeing 737-800 (738) 1:50 Effective 2024-12-16 through 2025-02-01
Mar,Mie,Vie,Dom 15:05 Salvador (SSA) 16:55 Belo Horizonte (CNF)
Gol G3 1879 Non-stop Boeing 737-800 (738) 1:50 Effective 2024-10-27 through 2024-11-17
Mar,Mie,Vie,Dom 15:05 Salvador (SSA) 16:55 Belo Horizonte (CNF)
Gol G3 1879 Non-stop Boeing 737-800 (738) 1:50 Effective 2024-11-20 through 2024-11-29
Mar 15:10 Salvador (SSA) 16:55 Belo Horizonte (CNF)
Gol G3 1879 Non-stop Boeing 737-800 (738) 1:45 Operates only on 2024-11-19
Mar,Mie,Vie,Dom 15:10 Salvador (SSA) 16:55 Belo Horizonte (CNF)
Gol G3 1879 Non-stop Boeing 737-800 (738) 1:45 Effective from 2024-12-01
Lun-Vie,Dom 15:20 Salvador (SSA) 17:10 Belo Horizonte (CNF)
Gol G3 1879 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Valid until 2024-09-04
Lun,Jue-Sab 15:20 Salvador (SSA) 17:10 Belo Horizonte (CNF)
Gol G3 1879 Non-stop Boeing 737-800 (738) 1:50 Effective 2024-09-05 through 2024-09-12
Mar,Mie,Vie,Dom 15:20 Salvador (SSA) 17:10 Belo Horizonte (CNF)
Gol G3 1879 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Effective 2024-09-08 through 2024-09-15
Lun-Mie,Sab 15:20 Salvador (SSA) 17:10 Belo Horizonte (CNF)
Gol G3 1879 Non-stop Boeing 737-800 (738) 1:50 Effective 2024-09-14 through 2024-09-21
Lun-Vie,Dom 15:20 Salvador (SSA) 17:10 Belo Horizonte (CNF)
Gol G3 1879 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Effective 2024-09-19 through 2024-09-25
Mar-Jue,Sab 15:20 Salvador (SSA) 17:10 Belo Horizonte (CNF)
Gol G3 1879 Non-stop Boeing 737-800 (738) 1:50 Effective 2024-09-26 through 2024-10-03
Lun,Vie,Dom 15:20 Salvador (SSA) 17:10 Belo Horizonte (CNF)
Gol G3 1879 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Effective 2024-09-27 through 2024-09-30
Lun-Vie,Dom 15:20 Salvador (SSA) 17:10 Belo Horizonte (CNF)
Gol G3 1879 Non-stop Boeing 737-800 (738) 1:50 Effective 2024-10-04 through 2024-10-25
Sab 15:20 Salvador (SSA) 17:10 Belo Horizonte (CNF)
Gol G3 1879 Non-stop Boeing 737-700 (73G) 1:50 Effective 2024-10-05 through 2024-10-19
Sab 15:20 Salvador (SSA) 17:10 Belo Horizonte (CNF)
Gol G3 1879 Non-stop Boeing 737-800 (738) 1:50 Operates only on 2024-10-26
Lun,Jue,Sab 13:30 Salvador (SSA) 15:05 Belo Horizonte (CNF)
Gol G3 2071 Non-stop Boeing 737-800 (738) 1:35 Effective from 2024-10-28
Lun,Jue,Sab 18:10 Salvador (SSA) 19:55 Belo Horizonte (CNF)
Gol G3 2085 Non-stop Boeing 737-800 (738) 1:45 Effective from 2024-10-28
Sab 10:30 Salvador (SSA) 12:10 Belo Horizonte (CNF)
Azul AD 2446 Non-stop Embraer EMB 195 (E95) 1:40 Valid until 2024-09-07
Sab 10:30 Salvador (SSA) 12:10 Belo Horizonte (CNF)
Azul AD 2446 Non-stop Airbus A320 (320) 1:40 Effective 2024-09-14 through 2024-10-05
Sab 10:30 Salvador (SSA) 12:10 Belo Horizonte (CNF)
Azul AD 2446 Non-stop Embraer E195-E2 (295) 1:40 Effective from 2024-10-12
Dom 20:00 Salvador (SSA) 21:40 Belo Horizonte (CNF)
Azul AD 2446 Non-stop Airbus A320 (320) 1:40 Effective from 2024-10-06
Lun-Vie,Dom 10:30 Salvador (SSA) 12:10 Belo Horizonte (CNF)
Azul AD 2868 Non-stop Airbus A320 (320) 1:40 Valid until 2024-09-05
Vie 10:30 Salvador (SSA) 12:10 Belo Horizonte (CNF)
Azul AD 2868 Non-stop Embraer E195-E2 (295) 1:40 Operates only on 2024-09-06
Lun-Vie,Dom 10:30 Salvador (SSA) 12:10 Belo Horizonte (CNF)
Azul AD 2868 Non-stop Airbus A320 (320) 1:40 Effective 2024-09-08 through 2024-09-13
Dom 10:30 Salvador (SSA) 12:10 Belo Horizonte (CNF)
Azul AD 2868 Non-stop Embraer E195-E2 (295) 1:40 Effective 2024-09-15 through 2024-09-22
Lun-Vie 10:30 Salvador (SSA) 12:10 Belo Horizonte (CNF)
Azul AD 2868 Non-stop Airbus A320 (320) 1:40 Effective 2024-09-16 through 2024-09-27
Lun,Dom 10:30 Salvador (SSA) 12:10 Belo Horizonte (CNF)
Azul AD 2868 Non-stop Airbus A320 (320) 1:40 Effective 2024-09-29 through 2024-09-30
Lun-Vie 12:40 Salvador (SSA) 14:20 Belo Horizonte (CNF)
Azul AD 2915 Non-stop Airbus A320 (320) 1:40 Effective from 2024-10-01
Jue 05:00 Salvador (SSA) 06:40 Belo Horizonte (CNF)
Azul AD 2923 Non-stop Airbus A320 (320) 1:40 Effective 2024-09-05 through 2024-10-03
Lun-Vie,Dom 14:55 Salvador (SSA) 16:35 Belo Horizonte (CNF)
Azul AD 2937 Non-stop Airbus A320 (320) 1:40 Valid until 2024-09-11
Sab 14:55 Salvador (SSA) 16:35 Belo Horizonte (CNF)
Azul AD 2937 Non-stop Embraer E195-E2 (295) 1:40 Valid until 2024-09-07
Lun,Jue-Sab 14:55 Salvador (SSA) 16:35 Belo Horizonte (CNF)
Azul AD 2937 Non-stop Embraer E195-E2 (295) 1:40 Effective 2024-09-12 through 2024-09-23
Mar,Mie,Dom 14:55 Salvador (SSA) 16:35 Belo Horizonte (CNF)
Azul AD 2937 Non-stop Airbus A320 (320) 1:40 Effective 2024-09-15 through 2024-09-25
Lun-Vie,Dom 14:55 Salvador (SSA) 16:35 Belo Horizonte (CNF)
Azul AD 2937 Non-stop Airbus A320 (320) 1:40 Effective 2024-09-26 through 2024-11-15
Sab 14:55 Salvador (SSA) 16:35 Belo Horizonte (CNF)
Azul AD 2937 Non-stop Embraer E195-E2 (295) 1:40 Effective 2024-09-28 through 2024-11-16
Sab,Dom 14:55 Salvador (SSA) 16:35 Belo Horizonte (CNF)
Azul AD 2937 Non-stop Embraer E195-E2 (295) 1:40 Effective 2024-11-17 through 2024-11-23
Lun-Vie,Dom 14:55 Salvador (SSA) 16:35 Belo Horizonte (CNF)
Azul AD 2937 Non-stop Airbus A320 (320) 1:40 Effective 2024-11-18 through 2024-12-31
Sab 14:55 Salvador (SSA) 16:35 Belo Horizonte (CNF)
Azul AD 2937 Non-stop Embraer E195-E2 (295) 1:40 Effective 2024-11-30 through 2024-12-28
Sab 14:55 Salvador (SSA) 16:35 Belo Horizonte (CNF)
Azul AD 2937 Non-stop Embraer E195-E2 (295) 1:40 Effective from 2025-02-01
Lun-Vie,Dom 14:55 Salvador (SSA) 16:35 Belo Horizonte (CNF)
Azul AD 2937 Non-stop Airbus A320 (320) 1:40 Effective from 2025-02-02
Lun-Vie,Dom 15:15 Salvador (SSA) 16:55 Belo Horizonte (CNF)
Azul AD 2937 Non-stop Airbus A320 (320) 1:40 Effective 2025-01-01 through 2025-01-31
Sab 15:15 Salvador (SSA) 16:55 Belo Horizonte (CNF)
Azul AD 2937 Non-stop Embraer E195-E2 (295) 1:40 Effective 2025-01-04 through 2025-01-25
Lun-Sab 18:05 Salvador (SSA) 19:45 Belo Horizonte (CNF)
Azul AD 4015 Non-stop Airbus A320 (320) 1:40 Valid until 2024-09-30
Sab 18:05 Salvador (SSA) 19:50 Belo Horizonte (CNF)
Azul AD 4015 Non-stop Airbus A320 (320) 1:45 Effective 2024-10-05 through 2024-11-30
Mar,Jue,Sab 18:05 Salvador (SSA) 19:50 Belo Horizonte (CNF)
Azul AD 4015 Non-stop Airbus A320 (320) 1:45 Effective from 2024-12-03
Dom 18:40 Salvador (SSA) 20:20 Belo Horizonte (CNF)
Azul AD 4015 Non-stop Embraer E195-E2 (295) 1:40 Valid until 2024-09-29
Jue 18:50 Salvador (SSA) 20:35 Belo Horizonte (CNF)
Azul AD 4015 Non-stop Airbus A320 (320) 1:45 Operates only on 2024-11-14
Mar,Mie 19:05 Salvador (SSA) 20:50 Belo Horizonte (CNF)
Azul AD 4015 Non-stop Airbus A320 (320) 1:45 Effective 2024-10-01 through 2024-10-08
Lun,Mie-Vie 19:05 Salvador (SSA) 20:50 Belo Horizonte (CNF)
Azul AD 4015 Non-stop Embraer E195-E2 (295) 1:45 Effective 2024-10-03 through 2024-10-30
Mar 19:05 Salvador (SSA) 20:50 Belo Horizonte (CNF)
Azul AD 4015 Non-stop Airbus A320 (320) 1:45 Effective 2024-10-15 through 2024-10-29
1 2 3 4   next


Todas las líneas aéreas volando desde Salvador (SSA) a Belo Horizonte (CNF).
Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:

Effective 2024-12-16 through 2025-02-01
Lun
Mar
Mie
Jue
Vie
Sab
Dom
-
Duration: 1:50, non-stop
Boeing 737-800 (738)

Effective 2024-10-27 through 2024-11-17
Lun
-
Mar
Mie
Jue
-
Vie
Sab
-
Dom
Duration: 1:50, non-stop
Boeing 737-800 (738)

Effective 2024-11-20 through 2024-11-29
Lun
-
Mar
Mie
Jue
-
Vie
Sab
-
Dom
Duration: 1:50, non-stop
Boeing 737-800 (738)

Operates only on 2024-11-19
Lun
-
Mar
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:45, non-stop
Boeing 737-800 (738)

Effective from 2024-12-01
Lun
-
Mar
Mie
Jue
-
Vie
Sab
-
Dom
Duration: 1:45, non-stop
Boeing 737-800 (738)

Valid until 2024-09-04
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-09-05 through 2024-09-12
Lun
Mar
-
Mie
-
Jue
Vie
Sab
Dom
-
Duration: 1:50, non-stop
Boeing 737-800 (738)

Effective 2024-09-08 through 2024-09-15
Lun
-
Mar
Mie
Jue
-
Vie
Sab
-
Dom
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-09-14 through 2024-09-21
Lun
Mar
Mie
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:50, non-stop
Boeing 737-800 (738)

Effective 2024-09-19 through 2024-09-25
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-09-26 through 2024-10-03
Lun
-
Mar
Mie
Jue
Vie
-
Sab
Dom
-
Duration: 1:50, non-stop
Boeing 737-800 (738)

Effective 2024-09-27 through 2024-09-30
Lun
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-10-04 through 2024-10-25
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
Duration: 1:50, non-stop
Boeing 737-800 (738)

Effective 2024-10-05 through 2024-10-19
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:50, non-stop
Boeing 737-700 (73G)

Operates only on 2024-10-26
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:50, non-stop
Boeing 737-800 (738)

Effective from 2024-10-28
Lun
Mar
-
Mie
-
Jue
Vie
-
Sab
Dom
-
Duration: 1:35, non-stop
Boeing 737-800 (738)

Effective from 2024-10-28
Lun
Mar
-
Mie
-
Jue
Vie
-
Sab
Dom
-
Duration: 1:45, non-stop
Boeing 737-800 (738)

Valid until 2024-09-07
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:40, non-stop
Embraer EMB 195 (E95)

Effective 2024-09-14 through 2024-10-05
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:40, non-stop
Airbus A320 (320)

Effective from 2024-10-12
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:40, non-stop
Embraer E195-E2 (295)

Effective from 2024-10-06
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:40, non-stop
Airbus A320 (320)

Valid until 2024-09-05
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
Duration: 1:40, non-stop
Airbus A320 (320)

Operates only on 2024-09-06
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 1:40, non-stop
Embraer E195-E2 (295)

Effective 2024-09-08 through 2024-09-13
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
Duration: 1:40, non-stop
Airbus A320 (320)

Effective 2024-09-15 through 2024-09-22
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:40, non-stop
Embraer E195-E2 (295)

Effective 2024-09-16 through 2024-09-27
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 1:40, non-stop
Airbus A320 (320)

Effective 2024-09-29 through 2024-09-30
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:40, non-stop
Airbus A320 (320)

Effective from 2024-10-01
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 1:40, non-stop
Airbus A320 (320)

Effective 2024-09-05 through 2024-10-03
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:40, non-stop
Airbus A320 (320)

Valid until 2024-09-11
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
Duration: 1:40, non-stop
Airbus A320 (320)

Valid until 2024-09-07
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:40, non-stop
Embraer E195-E2 (295)

Effective 2024-09-12 through 2024-09-23
Lun
Mar
-
Mie
-
Jue
Vie
Sab
Dom
-
Duration: 1:40, non-stop
Embraer E195-E2 (295)

Effective 2024-09-15 through 2024-09-25
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:40, non-stop
Airbus A320 (320)

Effective 2024-09-26 through 2024-11-15
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
Duration: 1:40, non-stop
Airbus A320 (320)

Effective 2024-09-28 through 2024-11-16
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:40, non-stop
Embraer E195-E2 (295)

Effective 2024-11-17 through 2024-11-23
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
Duration: 1:40, non-stop
Embraer E195-E2 (295)

Effective 2024-11-18 through 2024-12-31
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
Duration: 1:40, non-stop
Airbus A320 (320)

Effective 2024-11-30 through 2024-12-28
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:40, non-stop
Embraer E195-E2 (295)

Effective from 2025-02-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:40, non-stop
Embraer E195-E2 (295)

Effective from 2025-02-02
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
Duration: 1:40, non-stop
Airbus A320 (320)

Effective 2025-01-01 through 2025-01-31
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
Duration: 1:40, non-stop
Airbus A320 (320)

Effective 2025-01-04 through 2025-01-25
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:40, non-stop
Embraer E195-E2 (295)

Valid until 2024-09-30
Lun
Mar
Mie
Jue
Vie
Sab
Dom
-
Duration: 1:40, non-stop
Airbus A320 (320)

Effective 2024-10-05 through 2024-11-30
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:45, non-stop
Airbus A320 (320)

Effective from 2024-12-03
Lun
-
Mar
Mie
-
Jue
Vie
-
Sab
Dom
-
Duration: 1:45, non-stop
Airbus A320 (320)

Valid until 2024-09-29
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:40, non-stop
Embraer E195-E2 (295)

Operates only on 2024-11-14
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:45, non-stop
Airbus A320 (320)

Effective 2024-10-01 through 2024-10-08
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:45, non-stop
Airbus A320 (320)

Effective 2024-10-03 through 2024-10-30
Lun
Mar
-
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 1:45, non-stop
Embraer E195-E2 (295)

Effective 2024-10-15 through 2024-10-29
Lun
-
Mar
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:45, non-stop
Airbus A320 (320)
Page 1 / 4        next
  • Una ruta nacional saliendo desde el aeropuerto Salvador (SSA) y llegando al aeropuerto Belo Horizonte (CNF).
  • El vuelo tiene una distancia de 596 millas, o 959 km.
  • La zona horaria tanto del aeropuerto de salida como del de llegada es UTC-3 . La hora actual en ambos aeropuertos es (loading...).
  • Para vuelos directos, el tiempo de vuelo oscila entre 1:35 y 2:35.