Todas las líneas aéreas volando desde San Antonio (SAT) a Nashville (BNA).

Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:
Mar,Mie 08:00 San Antonio (SAT) A 10:05 Nashville (BNA)
Southwest Airlines WN 653 Non-stop Boeing 737 MAX 8 (7M8) 2:05 Effective 2024-12-24 through 2025-01-01
Lun 08:00 San Antonio (SAT) A 10:05 Nashville (BNA)
Southwest Airlines WN 653 Non-stop Boeing 737 MAX 8 (7M8) 2:05 Operates only on 2025-01-06
Lun-Mie 17:55 San Antonio (SAT) A 20:00 Nashville (BNA)
Southwest Airlines WN 653 Non-stop Boeing 737 MAX 8 (7M8) 2:05 Effective 2024-11-26 through 2024-12-02
Lun,Jue,Vie,Dom 17:55 San Antonio (SAT) A 20:00 Nashville (BNA)
Southwest Airlines WN 653 Non-stop Boeing 737 MAX 8 (7M8) 2:05 Effective 2024-12-20 through 2025-01-02
Dom 17:55 San Antonio (SAT) A 20:00 Nashville (BNA)
Southwest Airlines WN 653 Non-stop Boeing 737 MAX 8 (7M8) 2:05 Operates only on 2025-01-05
Lun,Jue,Vie 06:50 San Antonio (SAT) A 09:05 Nashville (BNA)
Southwest Airlines WN 998 Non-stop Boeing 737-800 (73H) 2:15 Valid until 2024-09-30
Sab,Dom 07:15 San Antonio (SAT) A 09:30 Nashville (BNA)
Southwest Airlines WN 998 Non-stop Boeing 737-800 (73H) 2:15 Effective 2024-09-07 through 2024-09-29
Mar,Mie 07:50 San Antonio (SAT) A 10:05 Nashville (BNA)
Southwest Airlines WN 998 Non-stop Boeing 737-700 (73W) 2:15 Valid until 2024-09-11
Mar 07:50 San Antonio (SAT) A 10:05 Nashville (BNA)
Southwest Airlines WN 998 Non-stop Boeing 737-800 (73H) 2:15 Operates only on 2024-09-17
Mar,Mie 07:50 San Antonio (SAT) A 10:05 Nashville (BNA)
Southwest Airlines WN 998 Non-stop Boeing 737-700 (73W) 2:15 Effective 2024-09-18 through 2024-10-02
Dom 08:25 San Antonio (SAT) A 10:35 Nashville (BNA)
Southwest Airlines WN 998 Non-stop Boeing 737-700 (73W) 2:10 Operates only on 2024-09-01
Lun,Jue,Vie 06:55 San Antonio (SAT) A 09:05 Nashville (BNA)
Southwest Airlines WN 1816 Non-stop Boeing 737-800 (73H) 2:10 Effective 2024-10-03 through 2024-10-28
Vie 06:55 San Antonio (SAT) A 09:05 Nashville (BNA)
Southwest Airlines WN 1816 Non-stop Boeing 737-800 (73H) 2:10 Operates only on 2024-11-01
Sab 07:20 San Antonio (SAT) A 09:25 Nashville (BNA)
Southwest Airlines WN 1967 Non-stop Boeing 737 MAX 8 (7M8) 2:05 Effective 2024-10-05 through 2024-11-02
Mar,Mie 07:40 San Antonio (SAT) A 09:45 Nashville (BNA)
Southwest Airlines WN 1967 Non-stop Boeing 737-800 (73H) 2:05 Effective 2024-10-08 through 2024-10-30
Dom 11:00 San Antonio (SAT) A 13:05 Nashville (BNA)
Southwest Airlines WN 1967 Non-stop Boeing 737 MAX 8 (7M8) 2:05 Effective 2024-10-06 through 2024-10-27
Jue,Vie,Dom 16:20 San Antonio (SAT) A 18:30 Nashville (BNA)
Southwest Airlines WN 2015 Non-stop Boeing 737-700 (73W) 2:10 Effective 2025-01-12 through 2025-01-17
Lun,Dom 16:20 San Antonio (SAT) A 18:30 Nashville (BNA)
Southwest Airlines WN 2015 Non-stop Boeing 737-700 (73W) 2:10 Effective 2025-01-20 through 2025-01-26
Jue,Vie,Dom 16:20 San Antonio (SAT) A 18:30 Nashville (BNA)
Southwest Airlines WN 2015 Non-stop Boeing 737-700 (73W) 2:10 Effective 2025-02-02 through 2025-02-07
Lun 16:20 San Antonio (SAT) A 18:30 Nashville (BNA)
Southwest Airlines WN 2015 Non-stop Boeing 737-700 (73W) 2:10 Operates only on 2025-02-10
Lun,Mar,Jue 16:20 San Antonio (SAT) A 18:30 Nashville (BNA)
Southwest Airlines WN 2015 Non-stop Boeing 737-700 (73W) 2:10 Effective 2025-02-18 through 2025-02-24
Lun 16:20 San Antonio (SAT) A 18:30 Nashville (BNA)
Southwest Airlines WN 2015 Non-stop Boeing 737-700 (73W) 2:10 Operates only on 2025-03-03
Sab 13:50 San Antonio (SAT) A 15:55 Nashville (BNA)
Southwest Airlines WN 2019 Non-stop Boeing 737-800 (73H) 2:05 Effective 2024-10-05 through 2024-11-02
Jue 14:40 San Antonio (SAT) A 16:50 Nashville (BNA)
Southwest Airlines WN 2019 Non-stop Boeing 737-800 (73H) 2:10 Operates only on 2024-10-31
Mar,Mie 15:25 San Antonio (SAT) A 17:30 Nashville (BNA)
Southwest Airlines WN 2019 Non-stop Boeing 737 MAX 8 (7M8) 2:05 Effective 2024-10-08 through 2024-10-30
Lun,Jue,Vie 16:55 San Antonio (SAT) A 19:05 Nashville (BNA)
Southwest Airlines WN 2019 Non-stop Boeing 737-700 (73W) 2:10 Effective 2024-10-03 through 2024-10-28
Vie 16:55 San Antonio (SAT) A 19:05 Nashville (BNA)
Southwest Airlines WN 2019 Non-stop Boeing 737-700 (73W) 2:10 Operates only on 2024-11-01
Dom 17:55 San Antonio (SAT) A 20:00 Nashville (BNA)
Southwest Airlines WN 2142 Non-stop Boeing 737 MAX 8 (7M8) 2:05 Operates only on 2024-12-01
Lun,Jue,Vie,Dom 12:55 San Antonio (SAT) A 15:05 Nashville (BNA)
Southwest Airlines WN 2640 Non-stop Boeing 737-700 (73W) 2:10 Effective 2025-02-13 through 2025-02-17
Jue,Vie,Dom 12:55 San Antonio (SAT) A 15:05 Nashville (BNA)
Southwest Airlines WN 2640 Non-stop Boeing 737-700 (73W) 2:10 Effective 2025-02-21 through 2025-03-02
Mar,Mie 15:05 San Antonio (SAT) A 17:20 Nashville (BNA)
Southwest Airlines WN 2778 Non-stop Boeing 737 MAX 8 (7M8) 2:15 Valid until 2024-10-02
Lun-Mie 06:05 San Antonio (SAT) A 08:15 Nashville (BNA)
Southwest Airlines WN 3761 Non-stop Boeing 737 MAX 8 (7M8) 2:10 Effective 2024-11-26 through 2024-12-02
Lun,Jue,Vie,Dom 06:05 San Antonio (SAT) A 08:15 Nashville (BNA)
Southwest Airlines WN 3761 Non-stop Boeing 737 MAX 8 (7M8) 2:10 Effective 2024-12-20 through 2025-01-02
Dom 06:05 San Antonio (SAT) A 08:15 Nashville (BNA)
Southwest Airlines WN 3761 Non-stop Boeing 737 MAX 8 (7M8) 2:10 Operates only on 2025-01-05
Sab 17:55 San Antonio (SAT) A 20:00 Nashville (BNA)
Southwest Airlines WN 3761 Non-stop Boeing 737-700 (73W) 2:05 Effective 2024-11-23 through 2024-11-30
Sab 17:55 San Antonio (SAT) A 20:00 Nashville (BNA)
Southwest Airlines WN 3761 Non-stop Boeing 737-700 (73W) 2:05 Effective 2024-12-21 through 2025-01-04
Dom 07:20 San Antonio (SAT) A 09:25 Nashville (BNA)
Southwest Airlines WN 4040 Non-stop Boeing 737-800 (73H) 2:05 Effective 2024-10-06 through 2024-10-27
Jue 07:25 San Antonio (SAT) A 09:30 Nashville (BNA)
Southwest Airlines WN 4040 Non-stop Boeing 737-700 (73W) 2:05 Operates only on 2024-10-31
Jue,Vie,Dom 17:20 San Antonio (SAT) A 19:25 Nashville (BNA)
Southwest Airlines WN 4181 Non-stop Boeing 737 MAX 8 (7M8) 2:05 Effective 2024-11-03 through 2024-11-10
Lun,Jue,Vie,Dom 17:20 San Antonio (SAT) A 19:25 Nashville (BNA)
Southwest Airlines WN 4181 Non-stop Boeing 737 MAX 8 (7M8) 2:05 Effective 2024-11-11 through 2024-11-25
Vie,Dom 17:20 San Antonio (SAT) A 19:25 Nashville (BNA)
Southwest Airlines WN 4181 Non-stop Boeing 737 MAX 8 (7M8) 2:05 Effective 2024-12-08 through 2024-12-15
Jue 17:20 San Antonio (SAT) A 19:25 Nashville (BNA)
Southwest Airlines WN 4181 Non-stop Boeing 737 MAX 8 (7M8) 2:05 Operates only on 2024-12-19
Vie 17:20 San Antonio (SAT) A 19:25 Nashville (BNA)
Southwest Airlines WN 4181 Non-stop Boeing 737 MAX 8 (7M8) 2:05 Operates only on 2025-01-03
Dom 17:05 San Antonio (SAT) A 19:15 Nashville (BNA)
Southwest Airlines WN 4341 Non-stop Boeing 737-700 (73W) 2:10 Effective 2024-10-06 through 2024-10-27
Lun,Jue,Vie 16:15 San Antonio (SAT) A 18:30 Nashville (BNA)
Southwest Airlines WN 4443 Non-stop Boeing 737-700 (73W) 2:15 Valid until 2024-09-30
Vuelos no directos:
Jue,Vie,Dom 07:50 San Antonio (SAT) A 11:20 Nashville (BNA)
Southwest Airlines WN 775 1-stop Boeing 737-700 (73W) 3:30 Effective 2025-01-12 through 2025-01-17
Lun,Dom 07:50 San Antonio (SAT) A 11:20 Nashville (BNA)
Southwest Airlines WN 775 1-stop Boeing 737-700 (73W) 3:30 Effective 2025-01-20 through 2025-01-26
Jue,Vie,Dom 07:50 San Antonio (SAT) A 11:20 Nashville (BNA)
Southwest Airlines WN 775 1-stop Boeing 737-700 (73W) 3:30 Effective 2025-02-02 through 2025-02-07
Lun 07:50 San Antonio (SAT) A 11:20 Nashville (BNA)
Southwest Airlines WN 775 1-stop Boeing 737-700 (73W) 3:30 Operates only on 2025-02-10
Lun,Mar,Jue 07:50 San Antonio (SAT) A 11:20 Nashville (BNA)
Southwest Airlines WN 775 1-stop Boeing 737-700 (73W) 3:30 Effective 2025-02-18 through 2025-02-24
prev   1 2 3   next


Todas las líneas aéreas volando desde San Antonio (SAT) a Nashville (BNA).
Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:

Effective 2024-12-24 through 2025-01-01
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:05, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-01-06
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:05, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:05, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:05, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-01-05
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:05, non-stop
Boeing 737 MAX 8 (7M8)

Valid until 2024-09-30
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 2:15, non-stop
Boeing 737-800 (73H)

Effective 2024-09-07 through 2024-09-29
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
Duration: 2:15, non-stop
Boeing 737-800 (73H)

Valid until 2024-09-11
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:15, non-stop
Boeing 737-700 (73W)

Operates only on 2024-09-17
Lun
-
Mar
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:15, non-stop
Boeing 737-800 (73H)

Effective 2024-09-18 through 2024-10-02
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:15, non-stop
Boeing 737-700 (73W)

Operates only on 2024-09-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Effective 2024-10-03 through 2024-10-28
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Operates only on 2024-11-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Effective 2024-10-05 through 2024-11-02
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:05, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-10-08 through 2024-10-30
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Effective 2024-10-06 through 2024-10-27
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:05, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-01-12 through 2025-01-17
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Effective 2025-01-20 through 2025-01-26
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Effective 2025-02-02 through 2025-02-07
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Operates only on 2025-02-10
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Effective 2025-02-18 through 2025-02-24
Lun
Mar
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Operates only on 2025-03-03
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Effective 2024-10-05 through 2024-11-02
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Operates only on 2024-10-31
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Effective 2024-10-08 through 2024-10-30
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:05, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-10-03 through 2024-10-28
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Operates only on 2024-11-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Operates only on 2024-12-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:05, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-02-13 through 2025-02-17
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Effective 2025-02-21 through 2025-03-02
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Valid until 2024-10-02
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:15, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:10, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:10, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-01-05
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:10, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-11-23 through 2024-11-30
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:05, non-stop
Boeing 737-700 (73W)

Effective 2024-12-21 through 2025-01-04
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:05, non-stop
Boeing 737-700 (73W)

Effective 2024-10-06 through 2024-10-27
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Operates only on 2024-10-31
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 2:05, non-stop
Boeing 737-700 (73W)

Effective 2024-11-03 through 2024-11-10
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:05, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-11-11 through 2024-11-25
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:05, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-12-08 through 2024-12-15
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
Duration: 2:05, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2024-12-19
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 2:05, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-01-03
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 2:05, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-10-06 through 2024-10-27
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Valid until 2024-09-30
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 2:15, non-stop
Boeing 737-700 (73W)

Vuelos no directos:

Effective 2025-01-12 through 2025-01-17
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 3:30, 1-stop
Boeing 737-700 (73W)

Effective 2025-01-20 through 2025-01-26
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 3:30, 1-stop
Boeing 737-700 (73W)

Effective 2025-02-02 through 2025-02-07
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 3:30, 1-stop
Boeing 737-700 (73W)

Operates only on 2025-02-10
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 3:30, 1-stop
Boeing 737-700 (73W)

Effective 2025-02-18 through 2025-02-24
Lun
Mar
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 3:30, 1-stop
Boeing 737-700 (73W)
prev        Page 2 / 3        next
  • Una ruta nacional saliendo desde el aeropuerto San Antonio (SAT) y llegando al aeropuerto Nashville (BNA).
  • El vuelo tiene una distancia de 821 millas, o 1321 km.
  • La zona horaria tanto del aeropuerto de salida como del de llegada es UTC-6 . La hora actual en ambos aeropuertos es (loading...).
  • Para vuelos directos, el tiempo de vuelo oscila entre 2:05 y 2:15.