Todas las líneas aéreas volando desde Melbourne Tullamarine (MEL) a Brisbane (BNE).

Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos de código compartido:
Lun 14:10 Melbourne Tullamarine (MEL) 3 16:20 Brisbane (BNE) D
Qatar Airways QR 7105 Non-stop Boeing 737-800 (73H) 2:10 Operates only on 2026-09-07
Codeshare flight, operated by Virgin Australia.(VA 331)
Sab 15:10 Melbourne Tullamarine (MEL) 3 16:20 Brisbane (BNE) D
Qatar Airways QR 7105 Non-stop Boeing 737 MAX 8 (7M8) 2:10 Operates only on 2026-01-03
Codeshare flight, operated by Virgin Australia.(VA 333)
Sab 15:10 Melbourne Tullamarine (MEL) 3 16:20 Brisbane (BNE) D
Qatar Airways QR 7105 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-01-10 through 2026-01-31
Codeshare flight, operated by Virgin Australia.(VA 333)
Sab 15:10 Melbourne Tullamarine (MEL) 3 16:20 Brisbane (BNE) D
Qatar Airways QR 7105 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-02-14 through 2026-02-21
Codeshare flight, operated by Virgin Australia.(VA 333)
Sab 15:10 Melbourne Tullamarine (MEL) 3 16:20 Brisbane (BNE) D
Qatar Airways QR 7105 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-03-07 through 2026-03-28
Codeshare flight, operated by Virgin Australia.(VA 333)
Sab 15:10 Melbourne Tullamarine (MEL) 3 16:20 Brisbane (BNE) D
Qatar Airways QR 7105 Non-stop Boeing 737 MAX 8 (7M8) 2:10 Operates only on 2026-04-04
Codeshare flight, operated by Virgin Australia.(VA 333)
Jue-Dom 15:10 Melbourne Tullamarine (MEL) 3 17:20 Brisbane (BNE) D
Qatar Airways QR 7105 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-04-09 through 2026-06-06
Codeshare flight, operated by Virgin Australia.(VA 333)
Jue-Dom 15:10 Melbourne Tullamarine (MEL) 3 17:20 Brisbane (BNE) D
Qatar Airways QR 7105 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-06-11 through 2026-07-04
Codeshare flight, operated by Virgin Australia.(VA 333)
Jue-Sab 15:10 Melbourne Tullamarine (MEL) 3 17:20 Brisbane (BNE) D
Qatar Airways QR 7105 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-07-09 through 2026-07-25
Codeshare flight, operated by Virgin Australia.(VA 333)
Jue-Dom 15:10 Melbourne Tullamarine (MEL) 3 17:20 Brisbane (BNE) D
Qatar Airways QR 7105 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-07-26 through 2026-09-11
Codeshare flight, operated by Virgin Australia.(VA 333)
Sab 15:10 Melbourne Tullamarine (MEL) 3 17:20 Brisbane (BNE) D
Qatar Airways QR 7105 Non-stop Boeing 737 MAX 8 (7M8) 2:10 Operates only on 2026-09-12
Codeshare flight, operated by Virgin Australia.(VA 333)
Jue-Dom 15:10 Melbourne Tullamarine (MEL) 3 17:20 Brisbane (BNE) D
Qatar Airways QR 7105 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-09-13 through 2026-09-19
Codeshare flight, operated by Virgin Australia.(VA 333)
Jue-Sab 15:10 Melbourne Tullamarine (MEL) 3 17:20 Brisbane (BNE) D
Qatar Airways QR 7105 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-09-24 through 2026-10-03
Codeshare flight, operated by Virgin Australia.(VA 333)
Sab 15:10 Melbourne Tullamarine (MEL) 3 16:20 Brisbane (BNE) D
Qatar Airways QR 7105 Non-stop Boeing 737 MAX 8 (7M8) 2:10 Effective from 2026-10-10
Codeshare flight, operated by Virgin Australia.(VA 333)
Lun-Mie,Vie,Dom 20:50 Melbourne Tullamarine (MEL) 3 22:00 Brisbane (BNE) D
Qatar Airways QR 7105 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-01-26 through 2026-03-01
Codeshare flight, operated by Virgin Australia.(VA 353)
Lun-Mie 20:50 Melbourne Tullamarine (MEL) 3 22:00 Brisbane (BNE) D
Qatar Airways QR 7105 Non-stop Boeing 737-700 (73W) 2:10 Effective 2026-03-02 through 2026-03-04
Codeshare flight, operated by Virgin Australia.(VA 353)
Lun,Vie,Dom 20:50 Melbourne Tullamarine (MEL) 3 22:00 Brisbane (BNE) D
Qatar Airways QR 7105 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-03-06 through 2026-03-15
Codeshare flight, operated by Virgin Australia.(VA 353)
Lun-Mie 20:50 Melbourne Tullamarine (MEL) 3 22:00 Brisbane (BNE) D
Qatar Airways QR 7105 Non-stop Boeing 737-700 (73W) 2:10 Effective 2026-03-10 through 2026-03-25
Codeshare flight, operated by Virgin Australia.(VA 353)
Vie,Dom 20:50 Melbourne Tullamarine (MEL) 3 22:00 Brisbane (BNE) D
Qatar Airways QR 7105 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-03-20 through 2026-03-27
Codeshare flight, operated by Virgin Australia.(VA 353)
Dom 17:10 Melbourne Tullamarine (MEL) 3 18:20 Brisbane (BNE) D
Qatar Airways QR 7107 Non-stop Boeing 737-700 (73W) 2:10 Valid until 2026-01-18
Codeshare flight, operated by Virgin Australia.(VA 341)
Lun-Sab 17:10 Melbourne Tullamarine (MEL) 3 18:20 Brisbane (BNE) D
Qatar Airways QR 7107 Non-stop Boeing 737-800 (73H) 2:10 Valid until 2026-01-16
Codeshare flight, operated by Virgin Australia.(VA 341)
Sab 17:10 Melbourne Tullamarine (MEL) 3 18:20 Brisbane (BNE) D
Qatar Airways QR 7107 Non-stop Boeing 737 MAX 8 (7M8) 2:10 Operates only on 2026-01-17
Codeshare flight, operated by Virgin Australia.(VA 341)
Lun-Sab 17:10 Melbourne Tullamarine (MEL) 3 18:20 Brisbane (BNE) D
Qatar Airways QR 7107 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-01-19 through 2026-01-31
Codeshare flight, operated by Virgin Australia.(VA 341)
Dom 17:10 Melbourne Tullamarine (MEL) 3 18:20 Brisbane (BNE) D
Qatar Airways QR 7107 Non-stop Boeing 737 MAX 8 (7M8) 2:10 Operates only on 2026-01-25
Codeshare flight, operated by Virgin Australia.(VA 341)
Diario 17:10 Melbourne Tullamarine (MEL) 3 18:20 Brisbane (BNE) D
Qatar Airways QR 7107 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-02-01 through 2026-03-24
Codeshare flight, operated by Virgin Australia.(VA 341)
Mie 17:10 Melbourne Tullamarine (MEL) 3 18:20 Brisbane (BNE) D
Qatar Airways QR 7107 Non-stop Boeing 737 MAX 8 (7M8) 2:10 Operates only on 2026-03-25
Codeshare flight, operated by Virgin Australia.(VA 341)
Diario 17:10 Melbourne Tullamarine (MEL) 3 18:20 Brisbane (BNE) D
Qatar Airways QR 7107 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-03-26 through 2026-04-03
Codeshare flight, operated by Virgin Australia.(VA 341)
Sab 17:10 Melbourne Tullamarine (MEL) 3 18:20 Brisbane (BNE) D
Qatar Airways QR 7107 Non-stop Boeing 737 MAX 8 (7M8) 2:10 Operates only on 2026-04-04
Codeshare flight, operated by Virgin Australia.(VA 341)
Mar,Dom 17:10 Melbourne Tullamarine (MEL) 3 19:20 Brisbane (BNE) D
Qatar Airways QR 7107 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-04-05 through 2026-04-12
Codeshare flight, operated by Virgin Australia.(VA 341)
Lun,Mie-Sab 17:10 Melbourne Tullamarine (MEL) 3 19:20 Brisbane (BNE) D
Qatar Airways QR 7107 Non-stop Boeing 737-700 (73W) 2:10 Effective 2026-04-06 through 2026-04-13
Codeshare flight, operated by Virgin Australia.(VA 341)
Mar-Vie 17:10 Melbourne Tullamarine (MEL) 3 19:20 Brisbane (BNE) D
Qatar Airways QR 7107 Non-stop Boeing 737-700 (73W) 2:10 Effective 2026-04-14 through 2026-04-22
Codeshare flight, operated by Virgin Australia.(VA 341)
Lun,Jue,Sab,Dom 17:10 Melbourne Tullamarine (MEL) 3 19:20 Brisbane (BNE) D
Qatar Airways QR 7107 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-04-18 through 2026-04-26
Codeshare flight, operated by Virgin Australia.(VA 341)
Lun-Vie 17:10 Melbourne Tullamarine (MEL) 3 19:20 Brisbane (BNE) D
Qatar Airways QR 7107 Non-stop Boeing 737-700 (73W) 2:10 Effective 2026-04-24 through 2026-05-18
Codeshare flight, operated by Virgin Australia.(VA 341)
Sab,Dom 17:10 Melbourne Tullamarine (MEL) 3 19:20 Brisbane (BNE) D
Qatar Airways QR 7107 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-05-02 through 2026-05-17
Codeshare flight, operated by Virgin Australia.(VA 341)
Mar,Sab,Dom 17:10 Melbourne Tullamarine (MEL) 3 19:20 Brisbane (BNE) D
Qatar Airways QR 7107 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-05-19 through 2026-05-24
Codeshare flight, operated by Virgin Australia.(VA 341)
Lun-Vie 17:10 Melbourne Tullamarine (MEL) 3 19:20 Brisbane (BNE) D
Qatar Airways QR 7107 Non-stop Boeing 737-700 (73W) 2:10 Effective 2026-05-20 through 2026-06-19
Codeshare flight, operated by Virgin Australia.(VA 341)
Sab,Dom 17:10 Melbourne Tullamarine (MEL) 3 19:20 Brisbane (BNE) D
Qatar Airways QR 7107 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-05-30 through 2026-06-21
Codeshare flight, operated by Virgin Australia.(VA 341)
Lun,Jue,Sab,Dom 17:10 Melbourne Tullamarine (MEL) 3 19:20 Brisbane (BNE) D
Qatar Airways QR 7107 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-06-22 through 2026-06-29
Codeshare flight, operated by Virgin Australia.(VA 341)
Mar,Mie,Vie 17:10 Melbourne Tullamarine (MEL) 3 19:20 Brisbane (BNE) D
Qatar Airways QR 7107 Non-stop Boeing 737-700 (73W) 2:10 Effective 2026-06-23 through 2026-06-26
Codeshare flight, operated by Virgin Australia.(VA 341)
Diario 17:10 Melbourne Tullamarine (MEL) 3 19:20 Brisbane (BNE) D
Qatar Airways QR 7107 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-06-30 through 2026-07-21
Codeshare flight, operated by Virgin Australia.(VA 341)
Lun,Mie,Jue 17:10 Melbourne Tullamarine (MEL) 3 19:20 Brisbane (BNE) D
Qatar Airways QR 7107 Non-stop Boeing 737-700 (73W) 2:10 Effective 2026-07-22 through 2026-07-30
Codeshare flight, operated by Virgin Australia.(VA 341)
Mar,Vie-Dom 17:10 Melbourne Tullamarine (MEL) 3 19:20 Brisbane (BNE) D
Qatar Airways QR 7107 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-07-24 through 2026-07-28
Codeshare flight, operated by Virgin Australia.(VA 341)
Mar-Vie 17:10 Melbourne Tullamarine (MEL) 3 19:20 Brisbane (BNE) D
Qatar Airways QR 7107 Non-stop Boeing 737-700 (73W) 2:10 Effective 2026-07-31 through 2026-08-06
Codeshare flight, operated by Virgin Australia.(VA 341)
Lun,Vie-Dom 17:10 Melbourne Tullamarine (MEL) 3 19:20 Brisbane (BNE) D
Qatar Airways QR 7107 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-08-01 through 2026-08-09
Codeshare flight, operated by Virgin Australia.(VA 341)
Lun-Vie 17:10 Melbourne Tullamarine (MEL) 3 19:20 Brisbane (BNE) D
Qatar Airways QR 7107 Non-stop Boeing 737-700 (73W) 2:10 Effective 2026-08-10 through 2026-08-24
Codeshare flight, operated by Virgin Australia.(VA 341)
Sab,Dom 17:10 Melbourne Tullamarine (MEL) 3 19:20 Brisbane (BNE) D
Qatar Airways QR 7107 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-08-15 through 2026-08-23
Codeshare flight, operated by Virgin Australia.(VA 341)
Mar,Vie-Dom 17:10 Melbourne Tullamarine (MEL) 3 19:20 Brisbane (BNE) D
Qatar Airways QR 7107 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-08-25 through 2026-08-30
Codeshare flight, operated by Virgin Australia.(VA 341)
Lun-Jue 17:10 Melbourne Tullamarine (MEL) 3 19:20 Brisbane (BNE) D
Qatar Airways QR 7107 Non-stop Boeing 737-700 (73W) 2:10 Effective 2026-08-26 through 2026-09-03
Codeshare flight, operated by Virgin Australia.(VA 341)
Lun-Vie 17:10 Melbourne Tullamarine (MEL) 3 19:20 Brisbane (BNE) D
Qatar Airways QR 7107 Non-stop Boeing 737-700 (73W) 2:10 Effective 2026-09-04 through 2026-09-11
Codeshare flight, operated by Virgin Australia.(VA 341)
Sab,Dom 17:10 Melbourne Tullamarine (MEL) 3 19:20 Brisbane (BNE) D
Qatar Airways QR 7107 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-09-05 through 2026-09-13
Codeshare flight, operated by Virgin Australia.(VA 341)
prev   1 2 3 ... 27 28 29 30 31 32 33 ... 38 39 40   next


Todas las líneas aéreas volando desde Melbourne Tullamarine (MEL) a Brisbane (BNE).
Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos de código compartido:

Operates only on 2026-09-07
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 331)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Operates only on 2026-01-03
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 333)
Duration: 2:10, non-stop
Boeing 737 MAX 8 (7M8)

Vuelos directos de código compartido:

Effective 2026-01-10 through 2026-01-31
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 333)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-02-14 through 2026-02-21
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 333)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-03-07 through 2026-03-28
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 333)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Operates only on 2026-04-04
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 333)
Duration: 2:10, non-stop
Boeing 737 MAX 8 (7M8)

Vuelos directos de código compartido:

Effective 2026-04-09 through 2026-06-06
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 333)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-06-11 through 2026-07-04
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 333)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-07-09 through 2026-07-25
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 333)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-07-26 through 2026-09-11
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 333)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Operates only on 2026-09-12
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 333)
Duration: 2:10, non-stop
Boeing 737 MAX 8 (7M8)

Vuelos directos de código compartido:

Effective 2026-09-13 through 2026-09-19
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 333)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-09-24 through 2026-10-03
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 333)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective from 2026-10-10
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 333)
Duration: 2:10, non-stop
Boeing 737 MAX 8 (7M8)

Vuelos directos de código compartido:

Effective 2026-01-26 through 2026-03-01
Lun
Mar
Mie
Jue
-
Vie
Sab
-
Dom
Codeshare flight, operated by Virgin Australia. (VA 353)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-03-02 through 2026-03-04
Lun
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 353)
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Vuelos directos de código compartido:

Effective 2026-03-06 through 2026-03-15
Lun
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
Codeshare flight, operated by Virgin Australia. (VA 353)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-03-10 through 2026-03-25
Lun
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 353)
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Vuelos directos de código compartido:

Effective 2026-03-20 through 2026-03-27
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
Codeshare flight, operated by Virgin Australia. (VA 353)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Valid until 2026-01-18
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Codeshare flight, operated by Virgin Australia. (VA 341)
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Vuelos directos de código compartido:

Valid until 2026-01-16
Lun
Mar
Mie
Jue
Vie
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 341)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Operates only on 2026-01-17
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 341)
Duration: 2:10, non-stop
Boeing 737 MAX 8 (7M8)

Vuelos directos de código compartido:

Effective 2026-01-19 through 2026-01-31
Lun
Mar
Mie
Jue
Vie
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 341)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Operates only on 2026-01-25
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Codeshare flight, operated by Virgin Australia. (VA 341)
Duration: 2:10, non-stop
Boeing 737 MAX 8 (7M8)

Vuelos directos de código compartido:

Effective 2026-02-01 through 2026-03-24
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 341)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Operates only on 2026-03-25
Lun
-
Mar
-
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 341)
Duration: 2:10, non-stop
Boeing 737 MAX 8 (7M8)

Vuelos directos de código compartido:

Effective 2026-03-26 through 2026-04-03
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 341)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Operates only on 2026-04-04
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 341)
Duration: 2:10, non-stop
Boeing 737 MAX 8 (7M8)

Vuelos directos de código compartido:

Effective 2026-04-05 through 2026-04-12
Lun
-
Mar
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Codeshare flight, operated by Virgin Australia. (VA 341)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-04-06 through 2026-04-13
Lun
Mar
-
Mie
Jue
Vie
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 341)
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Vuelos directos de código compartido:

Effective 2026-04-14 through 2026-04-22
Lun
-
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 341)
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Vuelos directos de código compartido:

Effective 2026-04-18 through 2026-04-26
Lun
Mar
-
Mie
-
Jue
Vie
-
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 341)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-04-24 through 2026-05-18
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 341)
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Vuelos directos de código compartido:

Effective 2026-05-02 through 2026-05-17
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 341)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-05-19 through 2026-05-24
Lun
-
Mar
Mie
-
Jue
-
Vie
-
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 341)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-05-20 through 2026-06-19
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 341)
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Vuelos directos de código compartido:

Effective 2026-05-30 through 2026-06-21
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 341)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-06-22 through 2026-06-29
Lun
Mar
-
Mie
-
Jue
Vie
-
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 341)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-06-23 through 2026-06-26
Lun
-
Mar
Mie
Jue
-
Vie
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 341)
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Vuelos directos de código compartido:

Effective 2026-06-30 through 2026-07-21
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 341)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-07-22 through 2026-07-30
Lun
Mar
-
Mie
Jue
Vie
-
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 341)
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Vuelos directos de código compartido:

Effective 2026-07-24 through 2026-07-28
Lun
-
Mar
Mie
-
Jue
-
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 341)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-07-31 through 2026-08-06
Lun
-
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 341)
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Vuelos directos de código compartido:

Effective 2026-08-01 through 2026-08-09
Lun
Mar
-
Mie
-
Jue
-
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 341)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-08-10 through 2026-08-24
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 341)
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Vuelos directos de código compartido:

Effective 2026-08-15 through 2026-08-23
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 341)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-08-25 through 2026-08-30
Lun
-
Mar
Mie
-
Jue
-
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 341)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-08-26 through 2026-09-03
Lun
Mar
Mie
Jue
Vie
-
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 341)
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Vuelos directos de código compartido:

Effective 2026-09-04 through 2026-09-11
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 341)
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Vuelos directos de código compartido:

Effective 2026-09-05 through 2026-09-13
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 341)
Duration: 2:10, non-stop
Boeing 737-800 (73H)
prev        Page 30 / 40        next
  • Una ruta nacional saliendo desde el aeropuerto Melbourne Tullamarine (MEL) y llegando al aeropuerto Brisbane (BNE).
  • El vuelo tiene una distancia de 854 millas, o 1374 km.
  • La zona horaria tanto del aeropuerto de salida como del de llegada es UTC+10 . La hora actual en ambos aeropuertos es (loading...).
  • Para vuelos directos, el tiempo de vuelo oscila entre 2:05 y 2:30.