HORARIO DE VUELOS |
---|
Vuelos directos de código compartido: |
Mar-Vie,Dom
15:05
Guarulhos, Sao Paulo (GRU) 3
17:45
Montevideo (MVD) Iberia IB 6537 Non-stop Airbus A320 (320) 2:40 Effective 2025-01-05 through 2025-03-28 Codeshare flight, operated by LATAM Airlines.(LA 407) |
Mar
21:40
Guarulhos, Sao Paulo (GRU) 3
00:20
Montevideo (MVD) Iberia IB 6537 Non-stop Airbus A321 (321) 2:40 Effective 2024-12-17 through 2024-12-31 Codeshare flight, operated by LATAM Airlines.(LA 8016) The flight arrives 1 day after departure. |
Mie
07:05
Guarulhos, Sao Paulo (GRU) 3
09:45
Montevideo (MVD) Iberia IB 6609 Non-stop Airbus A320 (320) 2:40 Effective 2024-10-30 through 2024-12-11 Codeshare flight, operated by LATAM Airlines.(LA 8118) |
Mar-Jue
07:05
Guarulhos, Sao Paulo (GRU) 3
09:45
Montevideo (MVD) Iberia IB 6609 Non-stop Airbus A320 (320) 2:40 Effective 2024-12-17 through 2025-03-27 Codeshare flight, operated by LATAM Airlines.(LA 8118) |
Sab
15:05
Guarulhos, Sao Paulo (GRU) 3
17:45
Montevideo (MVD) Iberia IB 6609 Non-stop Airbus A320 (320) 2:40 Effective 2024-11-02 through 2025-03-29 Codeshare flight, operated by LATAM Airlines.(LA 407) |
Lun,Jue,Dom
21:40
Guarulhos, Sao Paulo (GRU) 3
00:20
Montevideo (MVD) Iberia IB 6609 Non-stop Airbus A320 (320) 2:40 Effective 2024-10-27 through 2024-12-16 Codeshare flight, operated by LATAM Airlines.(LA 8016) The flight arrives 1 day after departure. |
Mar,Vie
21:40
Guarulhos, Sao Paulo (GRU) 3
00:20
Montevideo (MVD) Iberia IB 6609 Non-stop Airbus A321 (321) 2:40 Effective 2024-10-29 through 2024-12-13 Codeshare flight, operated by LATAM Airlines.(LA 8016) The flight arrives 1 day after departure. |
Vie
21:40
Guarulhos, Sao Paulo (GRU) 3
00:20
Montevideo (MVD) Iberia IB 6609 Non-stop Airbus A321 (321) 2:40 Effective 2024-12-20 through 2025-03-28 Codeshare flight, operated by LATAM Airlines.(LA 8016) The flight arrives 1 day after departure. |
Lun,Dom
21:40
Guarulhos, Sao Paulo (GRU) 3
00:20
Montevideo (MVD) Iberia IB 6609 Non-stop Airbus A320 (320) 2:40 Effective 2024-12-22 through 2025-03-24 Codeshare flight, operated by LATAM Airlines.(LA 8016) The flight arrives 1 day after departure. |
Mar,Mie
07:05
Guarulhos, Sao Paulo (GRU) 3
09:50
Montevideo (MVD) Iberia IB 7060 Non-stop Airbus A320 (320) 2:45 Effective 2024-10-16 through 2024-10-23 Codeshare flight, operated by LATAM Airlines.(LA 8118) |
Jue
07:05
Guarulhos, Sao Paulo (GRU) 3
09:50
Montevideo (MVD) Iberia IB 7060 Non-stop Airbus A320 (320) 2:45 Operates only on 2024-10-24 Codeshare flight, operated by LATAM Airlines.(LA 8118) |
Mar-Jue,Sab
15:05
Guarulhos, Sao Paulo (GRU) 3
17:50
Montevideo (MVD) Iberia IB 7060 Non-stop Airbus A320 (320) 2:45 Effective 2024-09-11 through 2024-09-19 Codeshare flight, operated by LATAM Airlines.(LA 407) |
Mar-Jue
15:05
Guarulhos, Sao Paulo (GRU) 3
17:50
Montevideo (MVD) Iberia IB 7060 Non-stop Airbus A320 (320) 2:45 Effective 2024-09-24 through 2024-10-03 Codeshare flight, operated by LATAM Airlines.(LA 407) |
Mie,Jue,Sab
15:05
Guarulhos, Sao Paulo (GRU) 3
17:50
Montevideo (MVD) Iberia IB 7060 Non-stop Airbus A320 (320) 2:45 Effective 2024-10-09 through 2024-10-12 Codeshare flight, operated by LATAM Airlines.(LA 407) |
Sab
15:05
Guarulhos, Sao Paulo (GRU) 3
17:50
Montevideo (MVD) Iberia IB 7060 Non-stop Airbus A320 (320) 2:45 Operates only on 2024-10-26 Codeshare flight, operated by LATAM Airlines.(LA 407) |
Mie,Jue,Sab
16:05
Guarulhos, Sao Paulo (GRU) 3
18:50
Montevideo (MVD) Iberia IB 7060 Non-stop Airbus A320 (320) 2:45 Valid until 2024-09-04 Codeshare flight, operated by LATAM Airlines.(LA 407) |
Sab
21:40
Guarulhos, Sao Paulo (GRU) 3
00:25
Montevideo (MVD) Iberia IB 7060 Non-stop Airbus A320 (320) 2:45 Operates only on 2024-09-07 Codeshare flight, operated by LATAM Airlines.(LA 8176) The flight arrives 1 day after departure. |
Sab
21:40
Guarulhos, Sao Paulo (GRU) 3
00:25
Montevideo (MVD) Iberia IB 7060 Non-stop Airbus A320 (320) 2:45 Effective 2024-09-21 through 2024-10-05 Codeshare flight, operated by LATAM Airlines.(LA 8176) The flight arrives 1 day after departure. |
Sab
21:40
Guarulhos, Sao Paulo (GRU) 3
00:25
Montevideo (MVD) Iberia IB 7060 Non-stop Airbus A320 (320) 2:45 Operates only on 2024-10-19 Codeshare flight, operated by LATAM Airlines.(LA 8176) The flight arrives 1 day after departure. |
Lun
21:45
Guarulhos, Sao Paulo (GRU) 3
00:30
Montevideo (MVD) Iberia IB 7060 Non-stop Airbus A321 (321) 2:45 Valid until 2024-09-02 Codeshare flight, operated by LATAM Airlines.(LA 8016) The flight arrives 1 day after departure. |
Vie,Dom
21:45
Guarulhos, Sao Paulo (GRU) 3
00:30
Montevideo (MVD) Iberia IB 7060 Non-stop Airbus A320 (320) 2:45 Valid until 2024-09-08 Codeshare flight, operated by LATAM Airlines.(LA 8016) The flight arrives 1 day after departure. |
Lun,Vie,Dom
21:45
Guarulhos, Sao Paulo (GRU) 3
00:30
Montevideo (MVD) Iberia IB 7060 Non-stop Airbus A320 (320) 2:45 Effective 2024-09-09 through 2024-09-15 Codeshare flight, operated by LATAM Airlines.(LA 8016) The flight arrives 1 day after departure. |
Lun
21:45
Guarulhos, Sao Paulo (GRU) 3
00:30
Montevideo (MVD) Iberia IB 7060 Non-stop Airbus A321 (321) 2:45 Operates only on 2024-09-16 Codeshare flight, operated by LATAM Airlines.(LA 8016) The flight arrives 1 day after departure. |
Lun,Vie,Dom
21:45
Guarulhos, Sao Paulo (GRU) 3
00:30
Montevideo (MVD) Iberia IB 7060 Non-stop Airbus A320 (320) 2:45 Effective 2024-09-20 through 2024-10-25 Codeshare flight, operated by LATAM Airlines.(LA 8016) The flight arrives 1 day after departure. |
Mar
21:50
Guarulhos, Sao Paulo (GRU) 3
00:35
Montevideo (MVD) Iberia IB 7060 Non-stop Airbus A321 (321) 2:45 Effective 2024-10-08 through 2024-10-15 Codeshare flight, operated by LATAM Airlines.(LA 8016) The flight arrives 1 day after departure. |
Jue
21:50
Guarulhos, Sao Paulo (GRU) 3
00:35
Montevideo (MVD) Iberia IB 7060 Non-stop Airbus A320 (320) 2:45 Operates only on 2024-10-17 Codeshare flight, operated by LATAM Airlines.(LA 8016) The flight arrives 1 day after departure. |
Lun-Jue,Sab,Dom
07:05
Guarulhos, Sao Paulo (GRU) 3
09:50
Montevideo (MVD) Iberia IB 7133 Non-stop Airbus A320 (320) 2:45 Valid until 2024-09-02 Codeshare flight, operated by LATAM Airlines.(LA 8118) |
Mar
07:05
Guarulhos, Sao Paulo (GRU) 3
09:50
Montevideo (MVD) Iberia IB 7133 Non-stop Airbus A321 (321) 2:45 Operates only on 2024-09-03 Codeshare flight, operated by LATAM Airlines.(LA 8118) |
Lun-Jue,Sab,Dom
07:05
Guarulhos, Sao Paulo (GRU) 3
09:50
Montevideo (MVD) Iberia IB 7133 Non-stop Airbus A320 (320) 2:45 Effective 2024-09-04 through 2024-10-15 Codeshare flight, operated by LATAM Airlines.(LA 8118) |
Lun,Jue,Sab,Dom
07:05
Guarulhos, Sao Paulo (GRU) 3
09:50
Montevideo (MVD) Iberia IB 7133 Non-stop Airbus A320 (320) 2:45 Effective 2024-10-17 through 2024-10-21 Codeshare flight, operated by LATAM Airlines.(LA 8118) |
Sab
07:05
Guarulhos, Sao Paulo (GRU) 3
09:50
Montevideo (MVD) Iberia IB 7133 Non-stop Airbus A320 (320) 2:45 Operates only on 2024-10-26 Codeshare flight, operated by LATAM Airlines.(LA 8118) |
Vie
15:05
Guarulhos, Sao Paulo (GRU) 3
17:50
Montevideo (MVD) Iberia IB 7133 Non-stop Airbus A320 (320) 2:45 Effective 2024-09-13 through 2024-10-11 Codeshare flight, operated by LATAM Airlines.(LA 407) |
Mie,Vie
15:05
Guarulhos, Sao Paulo (GRU) 3
17:50
Montevideo (MVD) Iberia IB 7133 Non-stop Airbus A320 (320) 2:45 Effective 2024-10-16 through 2024-10-18 Codeshare flight, operated by LATAM Airlines.(LA 407) |
Vie
15:05
Guarulhos, Sao Paulo (GRU) 3
17:50
Montevideo (MVD) Iberia IB 7133 Non-stop Airbus A320 (320) 2:45 Operates only on 2024-10-25 Codeshare flight, operated by LATAM Airlines.(LA 407) |
Vie
16:05
Guarulhos, Sao Paulo (GRU) 3
18:50
Montevideo (MVD) Iberia IB 7133 Non-stop Airbus A320 (320) 2:45 Valid until 2024-09-06 Codeshare flight, operated by LATAM Airlines.(LA 407) |
Mie
21:40
Guarulhos, Sao Paulo (GRU) 3
00:25
Montevideo (MVD) Iberia IB 7133 Non-stop Airbus A320 (320) 2:45 Operates only on 2024-10-23 Codeshare flight, operated by LATAM Airlines.(LA 8176) The flight arrives 1 day after departure. |
Mar
21:50
Guarulhos, Sao Paulo (GRU) 3
00:35
Montevideo (MVD) Iberia IB 7133 Non-stop Airbus A321 (321) 2:45 Operates only on 2024-10-22 Codeshare flight, operated by LATAM Airlines.(LA 8016) The flight arrives 1 day after departure. |
Jue
21:50
Guarulhos, Sao Paulo (GRU) 3
00:35
Montevideo (MVD) Iberia IB 7133 Non-stop Airbus A320 (320) 2:45 Operates only on 2024-10-24 Codeshare flight, operated by LATAM Airlines.(LA 8016) The flight arrives 1 day after departure. |
Vie
07:05
Guarulhos, Sao Paulo (GRU) 3
09:50
Montevideo (MVD) Qatar Airways QR 7269 Non-stop Airbus A320 (320) 2:45 Effective 2024-10-04 through 2024-10-25 Codeshare flight, operated by LATAM Airlines.(LA 8168) |
Vie
07:05
Guarulhos, Sao Paulo (GRU) 3
09:50
Montevideo (MVD) Delta Air Lines DL 7372 Non-stop Airbus A320 (320) 2:45 Effective 2024-10-04 through 2024-10-25 Codeshare flight, operated by LATAM Airlines.(LA 8168) |
Mie
21:40
Guarulhos, Sao Paulo (GRU) 3
00:25
Montevideo (MVD) Delta Air Lines DL 7381 Non-stop Airbus A321 (321) 2:45 Effective 2024-10-09 through 2024-10-23 Codeshare flight, operated by LATAM Airlines.(LA 8176) The flight arrives 1 day after departure. |
Lun,Dom
09:20
Guarulhos, Sao Paulo (GRU) 2
12:20
Montevideo (MVD) American Airlines AA 7746 Non-stop Boeing 737 (737) 3:00 Valid until 2024-09-02 Codeshare flight, operated by Gol.(G3 7630) |
Mar-Sab
09:20
Guarulhos, Sao Paulo (GRU) 2
12:20
Montevideo (MVD) American Airlines AA 7746 Non-stop Boeing 737 MAX 8 (7M8) 3:00 Valid until 2024-09-03 Codeshare flight, operated by Gol.(G3 7630) |
Mie,Vie-Dom
09:20
Guarulhos, Sao Paulo (GRU) 2
12:20
Montevideo (MVD) American Airlines AA 7746 Non-stop Boeing 737 (737) 3:00 Effective 2024-09-04 through 2024-09-11 Codeshare flight, operated by Gol.(G3 7630) |
Lun,Mar,Jue
09:20
Guarulhos, Sao Paulo (GRU) 2
12:20
Montevideo (MVD) American Airlines AA 7746 Non-stop Boeing 737 MAX 8 (7M8) 3:00 Effective 2024-09-05 through 2024-09-10 Codeshare flight, operated by Gol.(G3 7630) |
Lun-Jue
09:20
Guarulhos, Sao Paulo (GRU) 2
12:20
Montevideo (MVD) American Airlines AA 7746 Non-stop Boeing 737 (737) 3:00 Effective 2024-09-12 through 2024-09-18 Codeshare flight, operated by Gol.(G3 7630) |
Jue-Dom
09:20
Guarulhos, Sao Paulo (GRU) 2
12:20
Montevideo (MVD) American Airlines AA 7746 Non-stop Boeing 737 MAX 8 (7M8) 3:00 Effective 2024-09-13 through 2024-09-22 Codeshare flight, operated by Gol.(G3 7630) |
Lun,Mie,Vie,Sab
09:20
Guarulhos, Sao Paulo (GRU) 2
12:20
Montevideo (MVD) American Airlines AA 7746 Non-stop Boeing 737 (737) 3:00 Effective 2024-09-23 through 2024-09-30 Codeshare flight, operated by Gol.(G3 7630) |
Mar,Jue,Dom
09:20
Guarulhos, Sao Paulo (GRU) 2
12:20
Montevideo (MVD) American Airlines AA 7746 Non-stop Boeing 737 MAX 8 (7M8) 3:00 Effective 2024-09-24 through 2024-10-01 Codeshare flight, operated by Gol.(G3 7630) |
Diario
09:20
Guarulhos, Sao Paulo (GRU) 2
12:20
Montevideo (MVD) American Airlines AA 7746 Non-stop Boeing 737 MAX 8 (7M8) 3:00 Effective 2024-10-02 through 2024-10-26 Codeshare flight, operated by Gol.(G3 7630) |