Todas las líneas aéreas volando desde Denver (DEN) a Sacramento (SMF).

Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:
Dom 06:40 Denver (DEN) 08:05 Sacramento (SMF) B
Southwest Airlines WN 3680 Non-stop Boeing 737-700 (73W) 2:25 Effective 2024-09-08 through 2024-09-29
Dom 16:20 Denver (DEN) 17:55 Sacramento (SMF) B
Southwest Airlines WN 3809 Non-stop Boeing 737-700 (73W) 2:35 Operates only on 2024-12-01
Mar,Mie 15:00 Denver (DEN) 16:25 Sacramento (SMF) B
Southwest Airlines WN 3918 Non-stop Boeing 737-700 (73W) 2:25 Valid until 2024-10-02
Mar,Mie 16:50 Denver (DEN) 18:15 Sacramento (SMF) B
Southwest Airlines WN 3948 Non-stop Boeing 737-800 (73H) 2:25 Effective 2024-10-08 through 2024-10-30
Lun,Jue,Vie 19:20 Denver (DEN) 20:50 Sacramento (SMF) B
Southwest Airlines WN 4049 Non-stop Boeing 737-800 (73H) 2:30 Effective 2024-10-03 through 2024-10-28
Vie 19:20 Denver (DEN) 20:50 Sacramento (SMF) B
Southwest Airlines WN 4049 Non-stop Boeing 737-800 (73H) 2:30 Operates only on 2024-11-01
Sab 19:30 Denver (DEN) 21:00 Sacramento (SMF) B
Southwest Airlines WN 4049 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2024-10-05 through 2024-11-02
Dom 19:40 Denver (DEN) 21:10 Sacramento (SMF) B
Southwest Airlines WN 4049 Non-stop Boeing 737-800 (73H) 2:30 Effective 2024-10-06 through 2024-10-27
Mar,Mie 20:50 Denver (DEN) 22:20 Sacramento (SMF) B
Southwest Airlines WN 4049 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2024-10-08 through 2024-10-30
Sab 11:05 Denver (DEN) 12:45 Sacramento (SMF) B
Southwest Airlines WN 4231 Non-stop Boeing 737 MAX 8 (7M8) 2:40 Effective 2025-01-11 through 2025-02-08
Lun-Mie 11:15 Denver (DEN) 12:50 Sacramento (SMF) B
Southwest Airlines WN 4231 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Effective 2024-11-04 through 2024-11-06
Mar,Mie 11:15 Denver (DEN) 12:50 Sacramento (SMF) B
Southwest Airlines WN 4231 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Effective 2024-11-12 through 2024-11-20
Mar-Vie 11:15 Denver (DEN) 12:50 Sacramento (SMF) B
Southwest Airlines WN 4231 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Effective 2024-11-29 through 2024-12-06
Lun-Jue 11:15 Denver (DEN) 12:50 Sacramento (SMF) B
Southwest Airlines WN 4231 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Effective 2024-12-09 through 2024-12-18
Mar,Mie 11:15 Denver (DEN) 12:50 Sacramento (SMF) B
Southwest Airlines WN 4231 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Effective 2024-12-24 through 2025-01-01
Lun 11:15 Denver (DEN) 12:50 Sacramento (SMF) B
Southwest Airlines WN 4231 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Operates only on 2025-01-06
Lun-Vie 12:20 Denver (DEN) 14:00 Sacramento (SMF) B
Southwest Airlines WN 4231 Non-stop Boeing 737-800 (73H) 2:40 Effective 2025-01-07 through 2025-01-15
Mar-Vie,Dom 12:20 Denver (DEN) 14:00 Sacramento (SMF) B
Southwest Airlines WN 4231 Non-stop Boeing 737-800 (73H) 2:40 Effective 2025-01-19 through 2025-01-24
Lun-Vie 12:20 Denver (DEN) 14:00 Sacramento (SMF) B
Southwest Airlines WN 4231 Non-stop Boeing 737-800 (73H) 2:40 Effective 2025-01-27 through 2025-02-05
Mar,Mie,Dom 12:20 Denver (DEN) 14:00 Sacramento (SMF) B
Southwest Airlines WN 4231 Non-stop Boeing 737-800 (73H) 2:40 Effective 2025-02-09 through 2025-02-12
Mar,Mie 12:20 Denver (DEN) 14:00 Sacramento (SMF) B
Southwest Airlines WN 4231 Non-stop Boeing 737-800 (73H) 2:40 Effective 2025-02-19 through 2025-03-05
Jue 13:05 Denver (DEN) 14:40 Sacramento (SMF) B
Southwest Airlines WN 4231 Non-stop Boeing 737-700 (73W) 2:35 Operates only on 2024-11-28
Jue,Vie,Dom 13:05 Denver (DEN) 14:40 Sacramento (SMF) B
Southwest Airlines WN 4231 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Effective 2025-01-12 through 2025-01-17
Lun,Dom 13:05 Denver (DEN) 14:40 Sacramento (SMF) B
Southwest Airlines WN 4231 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Effective 2025-01-20 through 2025-01-26
Jue,Vie,Dom 13:05 Denver (DEN) 14:40 Sacramento (SMF) B
Southwest Airlines WN 4231 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Effective 2025-02-02 through 2025-02-07
Lun 13:05 Denver (DEN) 14:40 Sacramento (SMF) B
Southwest Airlines WN 4231 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Operates only on 2025-02-10
Lun,Mar,Jue 13:05 Denver (DEN) 14:40 Sacramento (SMF) B
Southwest Airlines WN 4231 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Effective 2025-02-18 through 2025-02-24
Lun 13:05 Denver (DEN) 14:40 Sacramento (SMF) B
Southwest Airlines WN 4231 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Operates only on 2025-03-03
Sab 21:45 Denver (DEN) 23:20 Sacramento (SMF) B
Southwest Airlines WN 4231 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Effective 2025-02-15 through 2025-03-01
Jue,Vie,Dom 16:40 Denver (DEN) 18:15 Sacramento (SMF) B
Southwest Airlines WN 4267 Non-stop Boeing 737-700 (73W) 2:35 Effective 2024-11-03 through 2024-11-10
Lun,Jue,Vie,Dom 16:40 Denver (DEN) 18:15 Sacramento (SMF) B
Southwest Airlines WN 4267 Non-stop Boeing 737-700 (73W) 2:35 Effective 2024-11-11 through 2024-11-25
Vie,Dom 16:40 Denver (DEN) 18:15 Sacramento (SMF) B
Southwest Airlines WN 4267 Non-stop Boeing 737-700 (73W) 2:35 Effective 2024-12-08 through 2024-12-15
Jue 16:40 Denver (DEN) 18:15 Sacramento (SMF) B
Southwest Airlines WN 4267 Non-stop Boeing 737-700 (73W) 2:35 Operates only on 2024-12-19
Vie 16:40 Denver (DEN) 18:15 Sacramento (SMF) B
Southwest Airlines WN 4267 Non-stop Boeing 737-700 (73W) 2:35 Operates only on 2025-01-03
Dom 17:00 Denver (DEN) 18:25 Sacramento (SMF) B
Southwest Airlines WN 4296 Non-stop Boeing 737-800 (73H) 2:25 Effective 2024-09-08 through 2024-09-29
Mar,Mie 19:05 Denver (DEN) 20:35 Sacramento (SMF) B
Southwest Airlines WN 4346 Non-stop Boeing 737-700 (73W) 2:30 Valid until 2024-10-01
Mie 19:05 Denver (DEN) 20:35 Sacramento (SMF) B
Southwest Airlines WN 4346 Non-stop Boeing 737-800 (73H) 2:30 Operates only on 2024-10-02
Lun,Jue,Vie 21:45 Denver (DEN) 23:10 Sacramento (SMF) B
Southwest Airlines WN 4346 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Valid until 2024-09-30
Dom 22:50 Denver (DEN) 00:15 Sacramento (SMF) B
Southwest Airlines WN 4346 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-09-08 through 2024-09-29
The flight arrives 1 day after departure.
Dom 18:25 Denver (DEN) 20:00 Sacramento (SMF) B
Southwest Airlines WN 4361 Non-stop Boeing 737-700 (73W) 2:35 Operates only on 2024-12-01
Dom 10:10 Denver (DEN) 11:45 Sacramento (SMF) B
Southwest Airlines WN 4415 Non-stop Boeing 737-800 (73H) 2:35 Effective 2024-10-06 through 2024-10-27
Mar,Mie 10:35 Denver (DEN) 12:05 Sacramento (SMF) B
Southwest Airlines WN 4415 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2024-10-08 through 2024-10-30
Sab 11:35 Denver (DEN) 13:05 Sacramento (SMF) B
Southwest Airlines WN 4415 Non-stop Boeing 737-800 (73H) 2:30 Effective 2024-10-05 through 2024-11-02
Sab 13:55 Denver (DEN) 15:25 Sacramento (SMF) B
Southwest Airlines WN 4420 Non-stop Boeing 737-700 (73W) 2:30 Effective 2024-10-05 through 2024-11-02
Jue,Vie,Dom 22:35 Denver (DEN) 00:10 Sacramento (SMF) B
Southwest Airlines WN 4803 Non-stop Boeing 737-700 (73W) 2:35 Effective 2024-11-03 through 2024-11-10
The flight arrives 1 day after departure.
Lun,Jue,Vie,Dom 22:35 Denver (DEN) 00:10 Sacramento (SMF) B
Southwest Airlines WN 4803 Non-stop Boeing 737-700 (73W) 2:35 Effective 2024-11-11 through 2024-11-25
The flight arrives 1 day after departure.
Vie,Dom 22:35 Denver (DEN) 00:10 Sacramento (SMF) B
Southwest Airlines WN 4803 Non-stop Boeing 737-700 (73W) 2:35 Effective 2024-12-08 through 2024-12-15
The flight arrives 1 day after departure.
Jue 22:35 Denver (DEN) 00:10 Sacramento (SMF) B
Southwest Airlines WN 4803 Non-stop Boeing 737-700 (73W) 2:35 Operates only on 2024-12-19
The flight arrives 1 day after departure.
Vie 22:35 Denver (DEN) 00:10 Sacramento (SMF) B
Southwest Airlines WN 4803 Non-stop Boeing 737-700 (73W) 2:35 Operates only on 2025-01-03
The flight arrives 1 day after departure.
Sab 22:45 Denver (DEN) 00:20 Sacramento (SMF) B
Southwest Airlines WN 4803 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Effective 2024-11-23 through 2024-11-30
The flight arrives 1 day after departure.
prev   1 2 3 4 5 6 7 8 9 10 ... 12 13 14   next


Todas las líneas aéreas volando desde Denver (DEN) a Sacramento (SMF).
Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:

Effective 2024-09-08 through 2024-09-29
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Operates only on 2024-12-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:35, non-stop
Boeing 737-700 (73W)

Valid until 2024-10-02
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Effective 2024-10-08 through 2024-10-30
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Effective 2024-10-03 through 2024-10-28
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 2:30, non-stop
Boeing 737-800 (73H)

Operates only on 2024-11-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 2:30, non-stop
Boeing 737-800 (73H)

Effective 2024-10-05 through 2024-11-02
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-10-06 through 2024-10-27
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:30, non-stop
Boeing 737-800 (73H)

Effective 2024-10-08 through 2024-10-30
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-01-11 through 2025-02-08
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:40, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-11-04 through 2024-11-06
Lun
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:35, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-11-12 through 2024-11-20
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:35, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-11-29 through 2024-12-06
Lun
-
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 2:35, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-12-09 through 2024-12-18
Lun
Mar
Mie
Jue
Vie
-
Sab
-
Dom
-
Duration: 2:35, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-12-24 through 2025-01-01
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:35, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-01-06
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:35, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-01-07 through 2025-01-15
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 2:40, non-stop
Boeing 737-800 (73H)

Effective 2025-01-19 through 2025-01-24
Lun
-
Mar
Mie
Jue
Vie
Sab
-
Dom
Duration: 2:40, non-stop
Boeing 737-800 (73H)

Effective 2025-01-27 through 2025-02-05
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 2:40, non-stop
Boeing 737-800 (73H)

Effective 2025-02-09 through 2025-02-12
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:40, non-stop
Boeing 737-800 (73H)

Effective 2025-02-19 through 2025-03-05
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:40, non-stop
Boeing 737-800 (73H)

Operates only on 2024-11-28
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 2:35, non-stop
Boeing 737-700 (73W)

Effective 2025-01-12 through 2025-01-17
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:35, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-01-20 through 2025-01-26
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:35, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-02-02 through 2025-02-07
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:35, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-02-10
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:35, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-02-18 through 2025-02-24
Lun
Mar
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 2:35, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-03-03
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:35, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-02-15 through 2025-03-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:35, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-11-03 through 2024-11-10
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:35, non-stop
Boeing 737-700 (73W)

Effective 2024-11-11 through 2024-11-25
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:35, non-stop
Boeing 737-700 (73W)

Effective 2024-12-08 through 2024-12-15
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
Duration: 2:35, non-stop
Boeing 737-700 (73W)

Operates only on 2024-12-19
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 2:35, non-stop
Boeing 737-700 (73W)

Operates only on 2025-01-03
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 2:35, non-stop
Boeing 737-700 (73W)

Effective 2024-09-08 through 2024-09-29
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Valid until 2024-10-01
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:30, non-stop
Boeing 737-700 (73W)

Operates only on 2024-10-02
Lun
-
Mar
-
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:30, non-stop
Boeing 737-800 (73H)

Valid until 2024-09-30
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

22:50

00:15(+1)
Effective 2024-09-08 through 2024-09-29
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)
The flight arrives 1 day after departure.

Operates only on 2024-12-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:35, non-stop
Boeing 737-700 (73W)

Effective 2024-10-06 through 2024-10-27
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:35, non-stop
Boeing 737-800 (73H)

Effective 2024-10-08 through 2024-10-30
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-10-05 through 2024-11-02
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:30, non-stop
Boeing 737-800 (73H)

Effective 2024-10-05 through 2024-11-02
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:30, non-stop
Boeing 737-700 (73W)

22:35

00:10(+1)
Effective 2024-11-03 through 2024-11-10
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:35, non-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.

22:35

00:10(+1)
Effective 2024-11-11 through 2024-11-25
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:35, non-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.

22:35

00:10(+1)
Effective 2024-12-08 through 2024-12-15
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
Duration: 2:35, non-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.

22:35

00:10(+1)
Operates only on 2024-12-19
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 2:35, non-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.

22:35

00:10(+1)
Operates only on 2025-01-03
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 2:35, non-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.

22:45

00:20(+1)
Effective 2024-11-23 through 2024-11-30
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:35, non-stop
Boeing 737 MAX 8 (7M8)
The flight arrives 1 day after departure.
prev        Page 7 / 14        next
  • Una ruta nacional saliendo desde el aeropuerto Denver (DEN) y llegando al aeropuerto Sacramento (SMF).
  • El vuelo tiene una distancia de 907 millas, o 1459 km.
  • La zona horaria del aeropuerto de salida es UTC-7 , y la zona horario del aeropuerto de llegada es UTC-8 . La hora actual en el punto de salida es (loading...), y (loading...) en el punto de llegada. Hay una diferencia de tiempo de (loading...) hora/s entre los aeropuertos.
  • Para vuelos directos, el tiempo de vuelo oscila entre 2:25 y 2:45.