Todas las líneas aéreas volando desde Chiclayo (CIX) a Lima (LIM).

Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:
Jue 22:45 Chiclayo (CIX) 00:05 Lima (LIM)
LATAM Airlines LA 2279 Non-stop Airbus A320 (320) 1:20 Effective 2024-09-05 through 2024-09-12
The flight arrives 1 day after departure.
Diario 19:00 Chiclayo (CIX) 20:20 Lima (LIM)
LATAM Airlines LA 2281 Non-stop Airbus A320 (320) 1:20 Valid until 2024-09-01
Lun,Mar,Jue 19:00 Chiclayo (CIX) 20:20 Lima (LIM)
LATAM Airlines LA 2281 Non-stop Airbus A319 (319) 1:20 Effective 2024-09-02 through 2024-09-05
Lun-Mie,Vie-Dom 19:00 Chiclayo (CIX) 20:20 Lima (LIM)
LATAM Airlines LA 2281 Non-stop Airbus A320 (320) 1:20 Effective 2024-09-04 through 2024-09-14
Mar,Jue,Dom 19:00 Chiclayo (CIX) 20:20 Lima (LIM)
LATAM Airlines LA 2281 Non-stop Airbus A319 (319) 1:20 Effective 2024-09-12 through 2024-09-19
Lun,Mie,Vie-Dom 19:00 Chiclayo (CIX) 20:20 Lima (LIM)
LATAM Airlines LA 2281 Non-stop Airbus A320 (320) 1:20 Effective 2024-09-16 through 2024-09-23
Lun-Mie,Vie-Dom 19:00 Chiclayo (CIX) 20:20 Lima (LIM)
LATAM Airlines LA 2281 Non-stop Airbus A320 (320) 1:20 Effective 2024-09-24 through 2024-10-04
Jue 19:00 Chiclayo (CIX) 20:20 Lima (LIM)
LATAM Airlines LA 2281 Non-stop Airbus A319 (319) 1:20 Effective 2024-09-26 through 2024-10-03
Jue-Dom 19:00 Chiclayo (CIX) 20:20 Lima (LIM)
LATAM Airlines LA 2281 Non-stop Airbus A319 (319) 1:20 Effective 2024-10-05 through 2024-10-11
Lun-Mie,Sab 19:00 Chiclayo (CIX) 20:20 Lima (LIM)
LATAM Airlines LA 2281 Non-stop Airbus A320 (320) 1:20 Effective 2024-10-07 through 2024-10-12
Lun,Jue,Dom 19:00 Chiclayo (CIX) 20:20 Lima (LIM)
LATAM Airlines LA 2281 Non-stop Airbus A319 (319) 1:20 Effective 2024-10-13 through 2024-10-17
Lun-Mie,Vie-Dom 19:00 Chiclayo (CIX) 20:20 Lima (LIM)
LATAM Airlines LA 2281 Non-stop Airbus A320 (320) 1:20 Effective 2024-10-15 through 2024-10-26
Jue 19:00 Chiclayo (CIX) 20:20 Lima (LIM)
LATAM Airlines LA 2281 Non-stop Airbus A319 (319) 1:20 Operates only on 2024-10-24
Lun,Dom 19:00 Chiclayo (CIX) 20:20 Lima (LIM)
LATAM Airlines LA 2281 Non-stop Airbus A319 (319) 1:20 Effective from 2025-03-30
Mar-Sab 19:00 Chiclayo (CIX) 20:20 Lima (LIM)
LATAM Airlines LA 2281 Non-stop Airbus A320 (320) 1:20 Effective from 2025-04-01
Jue 17:20 Chiclayo (CIX) 18:40 Lima (LIM)
LATAM Airlines LA 2283 Non-stop Airbus A320 (320) 1:20 Valid until 2024-10-17
Jue 17:20 Chiclayo (CIX) 18:40 Lima (LIM)
LATAM Airlines LA 2283 Non-stop Airbus A319 (319) 1:20 Operates only on 2024-10-24
Jue 17:20 Chiclayo (CIX) 18:40 Lima (LIM)
LATAM Airlines LA 2283 Non-stop Airbus A320 (320) 1:20 Effective from 2025-04-03
Lun,Mie-Vie,Dom 18:55 Chiclayo (CIX) 20:10 Lima (LIM)
LATAM Airlines LA 2283 Non-stop Airbus A320 (320) 1:15 Effective 2024-10-27 through 2024-11-04
Mar,Sab 18:55 Chiclayo (CIX) 20:10 Lima (LIM)
LATAM Airlines LA 2283 Non-stop Airbus A319 (319) 1:15 Effective 2024-10-29 through 2024-11-02
Lun-Mie,Sab 18:55 Chiclayo (CIX) 20:10 Lima (LIM)
LATAM Airlines LA 2283 Non-stop Airbus A320 (320) 1:15 Effective 2024-11-05 through 2024-11-13
Jue,Vie,Dom 18:55 Chiclayo (CIX) 20:10 Lima (LIM)
LATAM Airlines LA 2283 Non-stop Airbus A319 (319) 1:15 Effective 2024-11-07 through 2024-11-10
Mar,Jue-Dom 18:55 Chiclayo (CIX) 20:10 Lima (LIM)
LATAM Airlines LA 2283 Non-stop Airbus A320 (320) 1:15 Effective 2024-11-14 through 2024-11-19
Lun,Mie,Jue 18:55 Chiclayo (CIX) 20:10 Lima (LIM)
LATAM Airlines LA 2283 Non-stop Airbus A319 (319) 1:15 Effective 2024-11-18 through 2024-11-21
Lun,Mar,Jue-Dom 18:55 Chiclayo (CIX) 20:10 Lima (LIM)
LATAM Airlines LA 2283 Non-stop Airbus A320 (320) 1:15 Effective 2024-11-22 through 2024-11-29
Mie,Sab,Dom 18:55 Chiclayo (CIX) 20:10 Lima (LIM)
LATAM Airlines LA 2283 Non-stop Airbus A319 (319) 1:15 Effective 2024-11-27 through 2024-12-04
Lun,Mar,Jue-Dom 18:55 Chiclayo (CIX) 20:10 Lima (LIM)
LATAM Airlines LA 2283 Non-stop Airbus A320 (320) 1:15 Effective 2024-12-02 through 2024-12-08
Lun,Mar,Jue,Sab 18:55 Chiclayo (CIX) 20:10 Lima (LIM)
LATAM Airlines LA 2283 Non-stop Airbus A319 (319) 1:15 Effective 2024-12-09 through 2024-12-14
Lun-Mie,Vie,Dom 18:55 Chiclayo (CIX) 20:10 Lima (LIM)
LATAM Airlines LA 2283 Non-stop Airbus A320 (320) 1:15 Effective 2024-12-11 through 2024-12-18
Mar,Jue,Sab,Dom 18:55 Chiclayo (CIX) 20:10 Lima (LIM)
LATAM Airlines LA 2283 Non-stop Airbus A320 (320) 1:15 Effective 2024-12-19 through 2024-12-24
Lun,Mie-Vie 18:55 Chiclayo (CIX) 20:10 Lima (LIM)
LATAM Airlines LA 2283 Non-stop Airbus A319 (319) 1:15 Effective 2024-12-20 through 2024-12-26
Jue,Vie,Dom 18:55 Chiclayo (CIX) 20:10 Lima (LIM)
LATAM Airlines LA 2283 Non-stop Airbus A320 (320) 1:15 Effective 2024-12-27 through 2025-01-05
Lun-Mie,Sab 18:55 Chiclayo (CIX) 20:10 Lima (LIM)
LATAM Airlines LA 2283 Non-stop Airbus A319 (319) 1:15 Effective 2024-12-28 through 2025-01-06
Lun-Mie,Sab 18:55 Chiclayo (CIX) 20:10 Lima (LIM)
LATAM Airlines LA 2283 Non-stop Airbus A320 (320) 1:15 Effective 2025-01-07 through 2025-01-14
Mie-Vie,Dom 18:55 Chiclayo (CIX) 20:10 Lima (LIM)
LATAM Airlines LA 2283 Non-stop Airbus A319 (319) 1:15 Effective 2025-01-09 through 2025-01-17
Mar,Mie,Vie,Sab 18:55 Chiclayo (CIX) 20:10 Lima (LIM)
LATAM Airlines LA 2283 Non-stop Airbus A319 (319) 1:15 Effective 2025-01-18 through 2025-01-24
Lun,Jue,Sab,Dom 18:55 Chiclayo (CIX) 20:10 Lima (LIM)
LATAM Airlines LA 2283 Non-stop Airbus A320 (320) 1:15 Effective 2025-01-19 through 2025-01-27
Mar,Jue-Sab 18:55 Chiclayo (CIX) 20:10 Lima (LIM)
LATAM Airlines LA 2283 Non-stop Airbus A320 (320) 1:15 Effective 2025-01-28 through 2025-02-11
Lun,Mie,Dom 18:55 Chiclayo (CIX) 20:10 Lima (LIM)
LATAM Airlines LA 2283 Non-stop Airbus A319 (319) 1:15 Effective 2025-01-29 through 2025-02-10
Mie-Vie,Dom 18:55 Chiclayo (CIX) 20:10 Lima (LIM)
LATAM Airlines LA 2283 Non-stop Airbus A320 (320) 1:15 Effective 2025-02-12 through 2025-02-16
Lun-Mie,Vie,Sab 18:55 Chiclayo (CIX) 20:10 Lima (LIM)
LATAM Airlines LA 2283 Non-stop Airbus A319 (319) 1:15 Effective 2025-02-15 through 2025-02-21
Lun,Mar,Jue,Sab 18:55 Chiclayo (CIX) 20:10 Lima (LIM)
LATAM Airlines LA 2283 Non-stop Airbus A320 (320) 1:15 Effective 2025-02-20 through 2025-02-25
Mie-Vie,Dom 18:55 Chiclayo (CIX) 20:10 Lima (LIM)
LATAM Airlines LA 2283 Non-stop Airbus A319 (319) 1:15 Effective 2025-02-23 through 2025-02-28
Lun,Mie-Dom 18:55 Chiclayo (CIX) 20:10 Lima (LIM)
LATAM Airlines LA 2283 Non-stop Airbus A320 (320) 1:15 Effective 2025-03-01 through 2025-03-07
Mar,Sab 18:55 Chiclayo (CIX) 20:10 Lima (LIM)
LATAM Airlines LA 2283 Non-stop Airbus A319 (319) 1:15 Effective 2025-03-04 through 2025-03-11
Lun,Mie,Sab,Dom 18:55 Chiclayo (CIX) 20:10 Lima (LIM)
LATAM Airlines LA 2283 Non-stop Airbus A320 (320) 1:15 Effective 2025-03-09 through 2025-03-15
Mie-Vie,Dom 18:55 Chiclayo (CIX) 20:10 Lima (LIM)
LATAM Airlines LA 2283 Non-stop Airbus A319 (319) 1:15 Effective 2025-03-13 through 2025-03-19
Lun,Mar,Jue,Sab,Dom 18:55 Chiclayo (CIX) 20:10 Lima (LIM)
LATAM Airlines LA 2283 Non-stop Airbus A320 (320) 1:15 Effective 2025-03-17 through 2025-03-25
Jue,Vie 18:55 Chiclayo (CIX) 20:10 Lima (LIM)
LATAM Airlines LA 2283 Non-stop Airbus A319 (319) 1:15 Effective 2025-03-21 through 2025-03-27
Mie,Vie 18:55 Chiclayo (CIX) 20:10 Lima (LIM)
LATAM Airlines LA 2283 Non-stop Airbus A320 (320) 1:15 Effective 2025-03-26 through 2025-03-28
prev   1 2 3 4 5 6 7 8 9 ... 19 20 21   next


Todas las líneas aéreas volando desde Chiclayo (CIX) a Lima (LIM).
Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:

22:45

00:05(+1)
Effective 2024-09-05 through 2024-09-12
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:20, non-stop
Airbus A320 (320)
The flight arrives 1 day after departure.

Valid until 2024-09-01
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Duration: 1:20, non-stop
Airbus A320 (320)

Effective 2024-09-02 through 2024-09-05
Lun
Mar
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:20, non-stop
Airbus A319 (319)

Effective 2024-09-04 through 2024-09-14
Lun
Mar
Mie
Jue
-
Vie
Sab
Dom
Duration: 1:20, non-stop
Airbus A320 (320)

Effective 2024-09-12 through 2024-09-19
Lun
-
Mar
Mie
-
Jue
Vie
-
Sab
-
Dom
Duration: 1:20, non-stop
Airbus A319 (319)

Effective 2024-09-16 through 2024-09-23
Lun
Mar
-
Mie
Jue
-
Vie
Sab
Dom
Duration: 1:20, non-stop
Airbus A320 (320)

Effective 2024-09-24 through 2024-10-04
Lun
Mar
Mie
Jue
-
Vie
Sab
Dom
Duration: 1:20, non-stop
Airbus A320 (320)

Effective 2024-09-26 through 2024-10-03
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:20, non-stop
Airbus A319 (319)

Effective 2024-10-05 through 2024-10-11
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
Dom
Duration: 1:20, non-stop
Airbus A319 (319)

Effective 2024-10-07 through 2024-10-12
Lun
Mar
Mie
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:20, non-stop
Airbus A320 (320)

Effective 2024-10-13 through 2024-10-17
Lun
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
Duration: 1:20, non-stop
Airbus A319 (319)

Effective 2024-10-15 through 2024-10-26
Lun
Mar
Mie
Jue
-
Vie
Sab
Dom
Duration: 1:20, non-stop
Airbus A320 (320)

Operates only on 2024-10-24
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:20, non-stop
Airbus A319 (319)

Effective from 2025-03-30
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:20, non-stop
Airbus A319 (319)

Effective from 2025-04-01
Lun
-
Mar
Mie
Jue
Vie
Sab
Dom
-
Duration: 1:20, non-stop
Airbus A320 (320)

Valid until 2024-10-17
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:20, non-stop
Airbus A320 (320)

Operates only on 2024-10-24
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:20, non-stop
Airbus A319 (319)

Effective from 2025-04-03
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:20, non-stop
Airbus A320 (320)

Effective 2024-10-27 through 2024-11-04
Lun
Mar
-
Mie
Jue
Vie
Sab
-
Dom
Duration: 1:15, non-stop
Airbus A320 (320)

Effective 2024-10-29 through 2024-11-02
Lun
-
Mar
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:15, non-stop
Airbus A319 (319)

Effective 2024-11-05 through 2024-11-13
Lun
Mar
Mie
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:15, non-stop
Airbus A320 (320)

Effective 2024-11-07 through 2024-11-10
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:15, non-stop
Airbus A319 (319)

Effective 2024-11-14 through 2024-11-19
Lun
-
Mar
Mie
-
Jue
Vie
Sab
Dom
Duration: 1:15, non-stop
Airbus A320 (320)

Effective 2024-11-18 through 2024-11-21
Lun
Mar
-
Mie
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:15, non-stop
Airbus A319 (319)

Effective 2024-11-22 through 2024-11-29
Lun
Mar
Mie
-
Jue
Vie
Sab
Dom
Duration: 1:15, non-stop
Airbus A320 (320)

Effective 2024-11-27 through 2024-12-04
Lun
-
Mar
-
Mie
Jue
-
Vie
-
Sab
Dom
Duration: 1:15, non-stop
Airbus A319 (319)

Effective 2024-12-02 through 2024-12-08
Lun
Mar
Mie
-
Jue
Vie
Sab
Dom
Duration: 1:15, non-stop
Airbus A320 (320)

Effective 2024-12-09 through 2024-12-14
Lun
Mar
Mie
-
Jue
Vie
-
Sab
Dom
-
Duration: 1:15, non-stop
Airbus A319 (319)

Effective 2024-12-11 through 2024-12-18
Lun
Mar
Mie
Jue
-
Vie
Sab
-
Dom
Duration: 1:15, non-stop
Airbus A320 (320)

Effective 2024-12-19 through 2024-12-24
Lun
-
Mar
Mie
-
Jue
Vie
-
Sab
Dom
Duration: 1:15, non-stop
Airbus A320 (320)

Effective 2024-12-20 through 2024-12-26
Lun
Mar
-
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 1:15, non-stop
Airbus A319 (319)

Effective 2024-12-27 through 2025-01-05
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:15, non-stop
Airbus A320 (320)

Effective 2024-12-28 through 2025-01-06
Lun
Mar
Mie
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:15, non-stop
Airbus A319 (319)

Effective 2025-01-07 through 2025-01-14
Lun
Mar
Mie
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:15, non-stop
Airbus A320 (320)

Effective 2025-01-09 through 2025-01-17
Lun
-
Mar
-
Mie
Jue
Vie
Sab
-
Dom
Duration: 1:15, non-stop
Airbus A319 (319)

Effective 2025-01-18 through 2025-01-24
Lun
-
Mar
Mie
Jue
-
Vie
Sab
Dom
-
Duration: 1:15, non-stop
Airbus A319 (319)

Effective 2025-01-19 through 2025-01-27
Lun
Mar
-
Mie
-
Jue
Vie
-
Sab
Dom
Duration: 1:15, non-stop
Airbus A320 (320)

Effective 2025-01-28 through 2025-02-11
Lun
-
Mar
Mie
-
Jue
Vie
Sab
Dom
-
Duration: 1:15, non-stop
Airbus A320 (320)

Effective 2025-01-29 through 2025-02-10
Lun
Mar
-
Mie
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:15, non-stop
Airbus A319 (319)

Effective 2025-02-12 through 2025-02-16
Lun
-
Mar
-
Mie
Jue
Vie
Sab
-
Dom
Duration: 1:15, non-stop
Airbus A320 (320)

Effective 2025-02-15 through 2025-02-21
Lun
Mar
Mie
Jue
-
Vie
Sab
Dom
-
Duration: 1:15, non-stop
Airbus A319 (319)

Effective 2025-02-20 through 2025-02-25
Lun
Mar
Mie
-
Jue
Vie
-
Sab
Dom
-
Duration: 1:15, non-stop
Airbus A320 (320)

Effective 2025-02-23 through 2025-02-28
Lun
-
Mar
-
Mie
Jue
Vie
Sab
-
Dom
Duration: 1:15, non-stop
Airbus A319 (319)

Effective 2025-03-01 through 2025-03-07
Lun
Mar
-
Mie
Jue
Vie
Sab
Dom
Duration: 1:15, non-stop
Airbus A320 (320)

Effective 2025-03-04 through 2025-03-11
Lun
-
Mar
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:15, non-stop
Airbus A319 (319)

Effective 2025-03-09 through 2025-03-15
Lun
Mar
-
Mie
Jue
-
Vie
-
Sab
Dom
Duration: 1:15, non-stop
Airbus A320 (320)

Effective 2025-03-13 through 2025-03-19
Lun
-
Mar
-
Mie
Jue
Vie
Sab
-
Dom
Duration: 1:15, non-stop
Airbus A319 (319)

Effective 2025-03-17 through 2025-03-25
Lun
Mar
Mie
-
Jue
Vie
-
Sab
Dom
Duration: 1:15, non-stop
Airbus A320 (320)

Effective 2025-03-21 through 2025-03-27
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 1:15, non-stop
Airbus A319 (319)

Effective 2025-03-26 through 2025-03-28
Lun
-
Mar
-
Mie
Jue
-
Vie
Sab
-
Dom
-
Duration: 1:15, non-stop
Airbus A320 (320)
prev        Page 6 / 21        next
  • Una ruta nacional saliendo desde el aeropuerto Chiclayo (CIX) y llegando al aeropuerto Lima (LIM).
  • El vuelo tiene una distancia de 406 millas, o 653 km.
  • La zona horaria tanto del aeropuerto de salida como del de llegada es UTC-5 . La hora actual en ambos aeropuertos es (loading...).
  • Para vuelos directos, el tiempo de vuelo oscila entre 0:40 y 1:30.