Todas las líneas aéreas volando desde Barcelona (BCN) a Asturias (OVD).

Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:
Lun,Mie,Sab 12:25 Barcelona (BCN) 1 14:00 Asturias (OVD)
Vueling VY 1574 Non-stop Airbus A321 (321) 1:35 Effective 2026-01-19 through 2026-01-26
Lun-Jue 12:25 Barcelona (BCN) 1 14:00 Asturias (OVD)
Vueling VY 1574 Non-stop Airbus A320 (32A) 1:35 Effective 2026-01-27 through 2026-02-05
Sab 12:25 Barcelona (BCN) 1 14:00 Asturias (OVD)
Vueling VY 1574 Non-stop Airbus A321 (321) 1:35 Operates only on 2026-01-31
Mie,Jue,Sab 12:25 Barcelona (BCN) 1 14:00 Asturias (OVD)
Vueling VY 1574 Non-stop Airbus A320 (32A) 1:35 Effective 2026-02-07 through 2026-02-21
Lun 12:25 Barcelona (BCN) 1 14:00 Asturias (OVD)
Vueling VY 1574 Non-stop Airbus A321 (321) 1:35 Effective 2026-02-09 through 2026-02-16
Lun,Mie,Jue,Dom 12:25 Barcelona (BCN) 1 14:00 Asturias (OVD)
Vueling VY 1574 Non-stop Airbus A320 (32A) 1:35 Effective 2026-02-22 through 2026-03-02
Lun-Jue,Dom 12:25 Barcelona (BCN) 1 14:00 Asturias (OVD)
Vueling VY 1574 Non-stop Airbus A320 (32A) 1:35 Effective 2026-03-03 through 2026-03-26
Sab 14:30 Barcelona (BCN) 1 16:00 Asturias (OVD)
Vueling VY 1574 Non-stop Airbus A320 (32A) 1:30 Effective 2026-02-28 through 2026-03-28
Jue 17:45 Barcelona (BCN) 1 19:30 Asturias (OVD)
Vueling VY 1574 Non-stop Airbus A320 (32A) 1:45 Effective 2026-06-18 through 2026-09-10
Dom 06:25 Barcelona (BCN) 1 08:05 Asturias (OVD)
Vueling VY 1576 Non-stop Airbus A320 (32A) 1:40 Valid until 2026-01-04
Mie 07:30 Barcelona (BCN) 1 09:10 Asturias (OVD)
Vueling VY 1576 Non-stop Airbus A320 (32A) 1:40 Valid until 2026-01-07
Jue 15:45 Barcelona (BCN) 1 17:30 Asturias (OVD)
Vueling VY 1576 Non-stop Airbus A320 (320) 1:45 Effective 2026-05-07 through 2026-06-11
Jue 15:45 Barcelona (BCN) 1 17:30 Asturias (OVD)
Vueling VY 1576 Non-stop Airbus A320 (320) 1:45 Effective from 2026-09-17
Mar 18:20 Barcelona (BCN) 1 19:55 Asturias (OVD)
Vueling VY 1576 Non-stop Airbus A320 (32A) 1:35 Operates only on 2026-01-06
Sab 21:15 Barcelona (BCN) 1 22:50 Asturias (OVD)
Vueling VY 1576 Non-stop Airbus A320 (32A) 1:35 Valid until 2026-01-03
Lun 14:00 Barcelona (BCN) 1 15:40 Asturias (OVD)
Vueling VY 1578 Non-stop Airbus A320 (32A) 1:40 Effective from 2026-03-30
Mar,Mie,Dom 14:10 Barcelona (BCN) 1 15:50 Asturias (OVD)
Vueling VY 1578 Non-stop Airbus A320 (32A) 1:40 Effective 2026-03-29 through 2026-06-16
Mar 14:10 Barcelona (BCN) 1 15:50 Asturias (OVD)
Vueling VY 1578 Non-stop Airbus A320 (32A) 1:40 Effective 2026-06-23 through 2026-09-15
Mar,Mie,Dom 14:10 Barcelona (BCN) 1 15:50 Asturias (OVD)
Vueling VY 1578 Non-stop Airbus A320 (32A) 1:40 Effective from 2026-09-16
Vie,Sab 14:25 Barcelona (BCN) 1 16:05 Asturias (OVD)
Vueling VY 1578 Non-stop Airbus A320 (32A) 1:40 Effective 2026-04-03 through 2026-06-13
Vie,Sab 14:25 Barcelona (BCN) 1 16:05 Asturias (OVD)
Vueling VY 1578 Non-stop Airbus A320 (32A) 1:40 Effective from 2026-09-18
Jue 11:00 Barcelona (BCN) 01:40 Asturias (OVD)
AlbaStar AP 1775 Non-stop Boeing 737-800 (738) 14:40 Effective from 2026-02-19
The flight arrives 1 day after departure.
This is a Charter flight.
Lun 09:30 Barcelona (BCN) 11:10 Asturias (OVD)
Volotea V7 3573 Non-stop Airbus A319 (319) 1:40 Valid until 2026-01-05
Lun 09:30 Barcelona (BCN) 11:10 Asturias (OVD)
Volotea V7 3573 Non-stop Airbus A319 (319) 1:40 Effective 2026-02-16 through 2026-03-23
Lun 09:35 Barcelona (BCN) 11:15 Asturias (OVD)
Volotea V7 3573 Non-stop Airbus A319 (319) 1:40 Effective 2026-03-30 through 2026-10-19
Jue 16:05 Barcelona (BCN) 17:45 Asturias (OVD)
Volotea V7 3573 Non-stop Airbus A319 (319) 1:40 Effective 2026-02-12 through 2026-03-26
Vie 17:15 Barcelona (BCN) 18:55 Asturias (OVD)
Volotea V7 3573 Non-stop Airbus A320 (320) 1:40 Effective 2026-01-09 through 2026-02-06
Vie,Dom 17:40 Barcelona (BCN) 19:20 Asturias (OVD)
Volotea V7 3573 Non-stop Airbus A319 (319) 1:40 Valid until 2026-01-04
Dom 17:40 Barcelona (BCN) 19:20 Asturias (OVD)
Volotea V7 3573 Non-stop Airbus A320 (320) 1:40 Effective 2026-01-11 through 2026-02-08
Vie,Dom 17:40 Barcelona (BCN) 19:20 Asturias (OVD)
Volotea V7 3573 Non-stop Airbus A319 (319) 1:40 Effective 2026-02-13 through 2026-03-27
Vie 18:00 Barcelona (BCN) 19:40 Asturias (OVD)
Volotea V7 3573 Non-stop Airbus A319 (319) 1:40 Effective 2026-04-03 through 2026-10-23
Dom 18:35 Barcelona (BCN) 20:15 Asturias (OVD)
Volotea V7 3573 Non-stop Airbus A319 (319) 1:40 Effective 2026-03-29 through 2026-10-18
Jue 18:45 Barcelona (BCN) 20:25 Asturias (OVD)
Volotea V7 3573 Non-stop Airbus A319 (319) 1:40 Effective 2026-04-02 through 2026-10-22
Vuelos directos de código compartido:
Vie 11:45 Barcelona (BCN) 1 13:20 Asturias (OVD)
Qatar Airways QR 3519 Non-stop Airbus A320 (32A) 1:35 Operates only on 2026-01-02
Codeshare flight, operated by Vueling.(VY 1574)
Mie,Jue 12:25 Barcelona (BCN) 1 14:00 Asturias (OVD)
Qatar Airways QR 3519 Non-stop Airbus A320 (32A) 1:35 Valid until 2026-01-07
Codeshare flight, operated by Vueling.(VY 1574)
Mar,Jue 12:25 Barcelona (BCN) 1 14:00 Asturias (OVD)
Qatar Airways QR 3519 Non-stop Airbus A321 (321) 1:35 Effective 2026-01-06 through 2026-01-08
Codeshare flight, operated by Vueling.(VY 1574)
Vie 11:45 Barcelona (BCN) 1 13:20 Asturias (OVD)
Qatar Airways QR 3528 Non-stop Airbus A321 (321) 1:35 Effective 2026-01-09 through 2026-01-16
Codeshare flight, operated by Vueling.(VY 1574)
Vie 11:45 Barcelona (BCN) 1 13:20 Asturias (OVD)
Qatar Airways QR 3528 Non-stop Airbus A320 (32A) 1:35 Operates only on 2026-01-23
Codeshare flight, operated by Vueling.(VY 1574)
Vie 11:45 Barcelona (BCN) 1 13:20 Asturias (OVD)
Qatar Airways QR 3528 Non-stop Airbus A321 (321) 1:35 Operates only on 2026-01-30
Codeshare flight, operated by Vueling.(VY 1574)
Vie 11:45 Barcelona (BCN) 1 13:20 Asturias (OVD)
Qatar Airways QR 3528 Non-stop Airbus A320 (32A) 1:35 Effective 2026-02-06 through 2026-03-27
Codeshare flight, operated by Vueling.(VY 1574)
Sab 12:20 Barcelona (BCN) 1 13:55 Asturias (OVD)
Qatar Airways QR 3528 Non-stop Airbus A321 (321) 1:35 Effective 2026-01-10 through 2026-01-17
Codeshare flight, operated by Vueling.(VY 1574)
Mar-Jue,Dom 12:25 Barcelona (BCN) 1 14:00 Asturias (OVD)
Qatar Airways QR 3528 Non-stop Airbus A321 (321) 1:35 Effective 2026-01-11 through 2026-01-15
Codeshare flight, operated by Vueling.(VY 1574)
Lun,Dom 12:25 Barcelona (BCN) 1 14:00 Asturias (OVD)
Qatar Airways QR 3528 Non-stop Airbus A320 (32A) 1:35 Effective 2026-01-12 through 2026-01-18
Codeshare flight, operated by Vueling.(VY 1574)
Lun,Mie,Sab 12:25 Barcelona (BCN) 1 14:00 Asturias (OVD)
Qatar Airways QR 3528 Non-stop Airbus A321 (321) 1:35 Effective 2026-01-19 through 2026-01-26
Codeshare flight, operated by Vueling.(VY 1574)
Mar,Jue 12:25 Barcelona (BCN) 1 14:00 Asturias (OVD)
Qatar Airways QR 3528 Non-stop Airbus A320 (32A) 1:35 Effective 2026-01-20 through 2026-01-27
Codeshare flight, operated by Vueling.(VY 1574)
Lun-Jue 12:25 Barcelona (BCN) 1 14:00 Asturias (OVD)
Qatar Airways QR 3528 Non-stop Airbus A320 (32A) 1:35 Effective 2026-01-28 through 2026-02-05
Codeshare flight, operated by Vueling.(VY 1574)
Sab 12:25 Barcelona (BCN) 1 14:00 Asturias (OVD)
Qatar Airways QR 3528 Non-stop Airbus A321 (321) 1:35 Operates only on 2026-01-31
Codeshare flight, operated by Vueling.(VY 1574)
Mie,Jue,Sab 12:25 Barcelona (BCN) 1 14:00 Asturias (OVD)
Qatar Airways QR 3528 Non-stop Airbus A320 (32A) 1:35 Effective 2026-02-07 through 2026-02-21
Codeshare flight, operated by Vueling.(VY 1574)
Lun 12:25 Barcelona (BCN) 1 14:00 Asturias (OVD)
Qatar Airways QR 3528 Non-stop Airbus A321 (321) 1:35 Effective 2026-02-09 through 2026-02-16
Codeshare flight, operated by Vueling.(VY 1574)
Lun,Mie,Jue,Dom 12:25 Barcelona (BCN) 1 14:00 Asturias (OVD)
Qatar Airways QR 3528 Non-stop Airbus A320 (32A) 1:35 Effective 2026-02-22 through 2026-03-02
Codeshare flight, operated by Vueling.(VY 1574)
prev   1 2 3 4 5   next


Todas las líneas aéreas volando desde Barcelona (BCN) a Asturias (OVD).
Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:

Effective 2026-01-19 through 2026-01-26
Lun
Mar
-
Mie
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:35, non-stop
Airbus A321 (321)

Vuelos directos:

Effective 2026-01-27 through 2026-02-05
Lun
Mar
Mie
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:35, non-stop
Airbus A320 (32A)

Vuelos directos:

Operates only on 2026-01-31
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:35, non-stop
Airbus A321 (321)

Vuelos directos:

Effective 2026-02-07 through 2026-02-21
Lun
-
Mar
-
Mie
Jue
Vie
-
Sab
Dom
-
Duration: 1:35, non-stop
Airbus A320 (32A)

Vuelos directos:

Effective 2026-02-09 through 2026-02-16
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:35, non-stop
Airbus A321 (321)

Vuelos directos:

Effective 2026-02-22 through 2026-03-02
Lun
Mar
-
Mie
Jue
Vie
-
Sab
-
Dom
Duration: 1:35, non-stop
Airbus A320 (32A)

Vuelos directos:

Effective 2026-03-03 through 2026-03-26
Lun
Mar
Mie
Jue
Vie
-
Sab
-
Dom
Duration: 1:35, non-stop
Airbus A320 (32A)

Vuelos directos:

Effective 2026-02-28 through 2026-03-28
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:30, non-stop
Airbus A320 (32A)

Vuelos directos:

Effective 2026-06-18 through 2026-09-10
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:45, non-stop
Airbus A320 (32A)

Vuelos directos:

Valid until 2026-01-04
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:40, non-stop
Airbus A320 (32A)

Vuelos directos:

Valid until 2026-01-07
Lun
-
Mar
-
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:40, non-stop
Airbus A320 (32A)

Vuelos directos:

Effective 2026-05-07 through 2026-06-11
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:45, non-stop
Airbus A320 (320)

Vuelos directos:

Effective from 2026-09-17
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:45, non-stop
Airbus A320 (320)

Vuelos directos:

Operates only on 2026-01-06
Lun
-
Mar
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:35, non-stop
Airbus A320 (32A)

Vuelos directos:

Valid until 2026-01-03
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:35, non-stop
Airbus A320 (32A)

Vuelos directos:

Effective from 2026-03-30
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:40, non-stop
Airbus A320 (32A)

Vuelos directos:

Effective 2026-03-29 through 2026-06-16
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:40, non-stop
Airbus A320 (32A)

Vuelos directos:

Effective 2026-06-23 through 2026-09-15
Lun
-
Mar
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:40, non-stop
Airbus A320 (32A)

Vuelos directos:

Effective from 2026-09-16
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:40, non-stop
Airbus A320 (32A)

Vuelos directos:

Effective 2026-04-03 through 2026-06-13
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
Dom
-
Duration: 1:40, non-stop
Airbus A320 (32A)

Vuelos directos:

Effective from 2026-09-18
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
Dom
-
Duration: 1:40, non-stop
Airbus A320 (32A)

Vuelos directos:

Effective from 2026-02-19
This is a Charter flight.
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 14:40, non-stop
Boeing 737-800 (738)
The flight arrives 1 day after departure.

Vuelos directos:

Valid until 2026-01-05
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:40, non-stop
Airbus A319 (319)

Vuelos directos:

Effective 2026-02-16 through 2026-03-23
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:40, non-stop
Airbus A319 (319)

Vuelos directos:

Effective 2026-03-30 through 2026-10-19
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:40, non-stop
Airbus A319 (319)

Vuelos directos:

Effective 2026-02-12 through 2026-03-26
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:40, non-stop
Airbus A319 (319)

Vuelos directos:

Effective 2026-01-09 through 2026-02-06
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 1:40, non-stop
Airbus A320 (320)

Vuelos directos:

Valid until 2026-01-04
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
Duration: 1:40, non-stop
Airbus A319 (319)

Vuelos directos:

Effective 2026-01-11 through 2026-02-08
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:40, non-stop
Airbus A320 (320)

Vuelos directos:

Effective 2026-02-13 through 2026-03-27
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
Duration: 1:40, non-stop
Airbus A319 (319)

Vuelos directos:

Effective 2026-04-03 through 2026-10-23
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 1:40, non-stop
Airbus A319 (319)

Vuelos directos:

Effective 2026-03-29 through 2026-10-18
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:40, non-stop
Airbus A319 (319)

Vuelos directos:

Effective 2026-04-02 through 2026-10-22
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:40, non-stop
Airbus A319 (319)

Vuelos directos de código compartido:

Operates only on 2026-01-02
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Codeshare flight, operated by Vueling. (VY 1574)
Duration: 1:35, non-stop
Airbus A320 (32A)

Vuelos directos de código compartido:

Valid until 2026-01-07
Lun
-
Mar
-
Mie
Jue
Vie
-
Sab
-
Dom
-
Codeshare flight, operated by Vueling. (VY 1574)
Duration: 1:35, non-stop
Airbus A320 (32A)

Vuelos directos de código compartido:

Effective 2026-01-06 through 2026-01-08
Lun
-
Mar
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Codeshare flight, operated by Vueling. (VY 1574)
Duration: 1:35, non-stop
Airbus A321 (321)

Vuelos directos de código compartido:

Effective 2026-01-09 through 2026-01-16
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Codeshare flight, operated by Vueling. (VY 1574)
Duration: 1:35, non-stop
Airbus A321 (321)

Vuelos directos de código compartido:

Operates only on 2026-01-23
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Codeshare flight, operated by Vueling. (VY 1574)
Duration: 1:35, non-stop
Airbus A320 (32A)

Vuelos directos de código compartido:

Operates only on 2026-01-30
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Codeshare flight, operated by Vueling. (VY 1574)
Duration: 1:35, non-stop
Airbus A321 (321)

Vuelos directos de código compartido:

Effective 2026-02-06 through 2026-03-27
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Codeshare flight, operated by Vueling. (VY 1574)
Duration: 1:35, non-stop
Airbus A320 (32A)

Vuelos directos de código compartido:

Effective 2026-01-10 through 2026-01-17
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Codeshare flight, operated by Vueling. (VY 1574)
Duration: 1:35, non-stop
Airbus A321 (321)

Vuelos directos de código compartido:

Effective 2026-01-11 through 2026-01-15
Lun
-
Mar
Mie
Jue
Vie
-
Sab
-
Dom
Codeshare flight, operated by Vueling. (VY 1574)
Duration: 1:35, non-stop
Airbus A321 (321)

Vuelos directos de código compartido:

Effective 2026-01-12 through 2026-01-18
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Codeshare flight, operated by Vueling. (VY 1574)
Duration: 1:35, non-stop
Airbus A320 (32A)

Vuelos directos de código compartido:

Effective 2026-01-19 through 2026-01-26
Lun
Mar
-
Mie
Jue
-
Vie
-
Sab
Dom
-
Codeshare flight, operated by Vueling. (VY 1574)
Duration: 1:35, non-stop
Airbus A321 (321)

Vuelos directos de código compartido:

Effective 2026-01-20 through 2026-01-27
Lun
-
Mar
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Codeshare flight, operated by Vueling. (VY 1574)
Duration: 1:35, non-stop
Airbus A320 (32A)

Vuelos directos de código compartido:

Effective 2026-01-28 through 2026-02-05
Lun
Mar
Mie
Jue
Vie
-
Sab
-
Dom
-
Codeshare flight, operated by Vueling. (VY 1574)
Duration: 1:35, non-stop
Airbus A320 (32A)

Vuelos directos de código compartido:

Operates only on 2026-01-31
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Codeshare flight, operated by Vueling. (VY 1574)
Duration: 1:35, non-stop
Airbus A321 (321)

Vuelos directos de código compartido:

Effective 2026-02-07 through 2026-02-21
Lun
-
Mar
-
Mie
Jue
Vie
-
Sab
Dom
-
Codeshare flight, operated by Vueling. (VY 1574)
Duration: 1:35, non-stop
Airbus A320 (32A)

Vuelos directos de código compartido:

Effective 2026-02-09 through 2026-02-16
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Codeshare flight, operated by Vueling. (VY 1574)
Duration: 1:35, non-stop
Airbus A321 (321)

Vuelos directos de código compartido:

Effective 2026-02-22 through 2026-03-02
Lun
Mar
-
Mie
Jue
Vie
-
Sab
-
Dom
Codeshare flight, operated by Vueling. (VY 1574)
Duration: 1:35, non-stop
Airbus A320 (32A)
prev        Page 2 / 5        next
  • Una ruta nacional saliendo desde el aeropuerto Barcelona (BCN) y llegando al aeropuerto Asturias (OVD).
  • El vuelo tiene una distancia de 442 millas, o 711 km.
  • La zona horaria tanto del aeropuerto de salida como del de llegada es UTC+1 . La hora actual en ambos aeropuertos es (loading...).
  • Para vuelos directos, el tiempo de vuelo oscila entre 1:30 y 14:40.