Singapore Airlines vuelos desde Brisbane (BNE) a Melbourne Tullamarine (MEL).

Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos de código compartido:
Lun-Vie 13:55 Brisbane (BNE) D 16:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6904 Non-stop Boeing 737-700 (73W) 2:25 Effective 2026-05-20 through 2026-06-19
Codeshare flight, operated by Virgin Australia.(VA 332)
Sab,Dom 13:55 Brisbane (BNE) D 16:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6904 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-05-30 through 2026-06-21
Codeshare flight, operated by Virgin Australia.(VA 332)
Lun,Jue,Sab,Dom 13:55 Brisbane (BNE) D 16:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6904 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-06-22 through 2026-06-29
Codeshare flight, operated by Virgin Australia.(VA 332)
Mar,Mie,Vie 13:55 Brisbane (BNE) D 16:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6904 Non-stop Boeing 737-700 (73W) 2:25 Effective 2026-06-23 through 2026-06-26
Codeshare flight, operated by Virgin Australia.(VA 332)
Diario 13:55 Brisbane (BNE) D 16:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6904 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-06-30 through 2026-07-21
Codeshare flight, operated by Virgin Australia.(VA 332)
Lun,Mie,Jue 13:55 Brisbane (BNE) D 16:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6904 Non-stop Boeing 737-700 (73W) 2:25 Effective 2026-07-22 through 2026-07-30
Codeshare flight, operated by Virgin Australia.(VA 332)
Mar,Vie-Dom 13:55 Brisbane (BNE) D 16:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6904 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-07-24 through 2026-07-28
Codeshare flight, operated by Virgin Australia.(VA 332)
Mar-Vie 13:55 Brisbane (BNE) D 16:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6904 Non-stop Boeing 737-700 (73W) 2:25 Effective 2026-07-31 through 2026-08-06
Codeshare flight, operated by Virgin Australia.(VA 332)
Lun,Vie-Dom 13:55 Brisbane (BNE) D 16:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6904 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-08-01 through 2026-08-09
Codeshare flight, operated by Virgin Australia.(VA 332)
Lun-Vie 13:55 Brisbane (BNE) D 16:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6904 Non-stop Boeing 737-700 (73W) 2:25 Effective 2026-08-10 through 2026-08-24
Codeshare flight, operated by Virgin Australia.(VA 332)
Sab,Dom 13:55 Brisbane (BNE) D 16:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6904 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-08-15 through 2026-08-23
Codeshare flight, operated by Virgin Australia.(VA 332)
Mar,Vie-Dom 13:55 Brisbane (BNE) D 16:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6904 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-08-25 through 2026-08-30
Codeshare flight, operated by Virgin Australia.(VA 332)
Lun-Jue 13:55 Brisbane (BNE) D 16:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6904 Non-stop Boeing 737-700 (73W) 2:25 Effective 2026-08-26 through 2026-09-03
Codeshare flight, operated by Virgin Australia.(VA 332)
Lun-Vie 13:55 Brisbane (BNE) D 16:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6904 Non-stop Boeing 737-700 (73W) 2:25 Effective 2026-09-04 through 2026-09-11
Codeshare flight, operated by Virgin Australia.(VA 332)
Sab,Dom 13:55 Brisbane (BNE) D 16:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6904 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-09-05 through 2026-09-13
Codeshare flight, operated by Virgin Australia.(VA 332)
Diario 13:55 Brisbane (BNE) D 16:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6904 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-09-14 through 2026-10-03
Codeshare flight, operated by Virgin Australia.(VA 332)
Diario 13:55 Brisbane (BNE) D 17:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6904 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-10-04 through 2026-10-24
Codeshare flight, operated by Virgin Australia.(VA 332)
Dom 13:55 Brisbane (BNE) D 17:15 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6904 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Effective from 2026-10-25
Codeshare flight, operated by Virgin Australia.(VA 332)
Lun-Sab 13:55 Brisbane (BNE) D 17:15 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6904 Non-stop Boeing 737-800 (73H) 2:20 Effective from 2026-10-26
Codeshare flight, operated by Virgin Australia.(VA 332)
Lun-Vie,Dom 18:55 Brisbane (BNE) D 22:15 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6906 Non-stop Boeing 737-800 (73H) 2:20 Valid until 2026-01-08
Codeshare flight, operated by Virgin Australia.(VA 352)
Vie 18:55 Brisbane (BNE) D 22:15 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6906 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Effective 2026-01-09 through 2026-01-16
Codeshare flight, operated by Virgin Australia.(VA 352)
Lun,Jue,Dom 18:55 Brisbane (BNE) D 22:15 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6906 Non-stop Boeing 737-800 (73H) 2:20 Effective 2026-01-11 through 2026-01-19
Codeshare flight, operated by Virgin Australia.(VA 352)
Mar,Mie 18:55 Brisbane (BNE) D 22:15 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6906 Non-stop Boeing 737-700 (73W) 2:20 Effective 2026-01-13 through 2026-01-14
Codeshare flight, operated by Virgin Australia.(VA 352)
Lun-Vie 18:55 Brisbane (BNE) D 22:15 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6906 Non-stop Boeing 737-800 (73H) 2:20 Effective 2026-01-20 through 2026-01-30
Codeshare flight, operated by Virgin Australia.(VA 352)
Lun-Vie,Dom 18:55 Brisbane (BNE) D 22:15 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6906 Non-stop Boeing 737-800 (73H) 2:20 Effective 2026-02-01 through 2026-03-26
Codeshare flight, operated by Virgin Australia.(VA 352)
Vie 18:55 Brisbane (BNE) D 22:15 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6906 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Operates only on 2026-03-27
Codeshare flight, operated by Virgin Australia.(VA 352)
Lun-Vie,Dom 18:55 Brisbane (BNE) D 22:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6906 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-03-29 through 2026-04-03
Codeshare flight, operated by Virgin Australia.(VA 352)
Sab 18:55 Brisbane (BNE) D 22:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6906 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Operates only on 2026-04-04
Codeshare flight, operated by Virgin Australia.(VA 352)
Diario 18:55 Brisbane (BNE) D 21:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6906 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-04-05 through 2026-09-11
Codeshare flight, operated by Virgin Australia.(VA 352)
Sab 18:55 Brisbane (BNE) D 21:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6906 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Operates only on 2026-09-12
Codeshare flight, operated by Virgin Australia.(VA 352)
Diario 18:55 Brisbane (BNE) D 21:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6906 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-09-13 through 2026-10-03
Codeshare flight, operated by Virgin Australia.(VA 352)
Sab,Dom 18:55 Brisbane (BNE) D 22:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6906 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2026-10-04 through 2026-10-24
Codeshare flight, operated by Virgin Australia.(VA 352)
Lun-Vie 18:55 Brisbane (BNE) D 22:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6906 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-10-05 through 2026-10-23
Codeshare flight, operated by Virgin Australia.(VA 352)
Dom 18:55 Brisbane (BNE) D 22:15 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6906 Non-stop Boeing 737-700 (73W) 2:20 Effective from 2026-10-25
Codeshare flight, operated by Virgin Australia.(VA 352)
Lun-Vie 18:55 Brisbane (BNE) D 22:15 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6906 Non-stop Boeing 737-800 (73H) 2:20 Effective from 2026-10-26
Codeshare flight, operated by Virgin Australia.(VA 352)
Diario 14:55 Brisbane (BNE) D 18:15 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6908 Non-stop Boeing 737-800 (73H) 2:20 Valid until 2026-01-30
Codeshare flight, operated by Virgin Australia.(VA 334)
Lun-Vie,Dom 14:55 Brisbane (BNE) D 18:15 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6908 Non-stop Boeing 737-800 (73H) 2:20 Effective 2026-02-01 through 2026-03-06
Codeshare flight, operated by Virgin Australia.(VA 334)
Sab 14:55 Brisbane (BNE) D 18:15 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6908 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Effective 2026-02-21 through 2026-02-28
Codeshare flight, operated by Virgin Australia.(VA 334)
Diario 14:55 Brisbane (BNE) D 18:15 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6908 Non-stop Boeing 737-800 (73H) 2:20 Effective 2026-03-07 through 2026-03-28
Codeshare flight, operated by Virgin Australia.(VA 334)
Lun-Vie,Dom 14:55 Brisbane (BNE) D 18:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6908 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-03-29 through 2026-04-03
Codeshare flight, operated by Virgin Australia.(VA 334)
Lun,Vie-Dom 14:55 Brisbane (BNE) D 17:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6908 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-04-05 through 2026-04-24
Codeshare flight, operated by Virgin Australia.(VA 334)
Sab 14:55 Brisbane (BNE) D 17:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6908 Non-stop Boeing 737-700 (73W) 2:25 Effective 2026-04-25 through 2026-05-02
Codeshare flight, operated by Virgin Australia.(VA 334)
Lun,Vie,Dom 14:55 Brisbane (BNE) D 17:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6908 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-04-26 through 2026-05-08
Codeshare flight, operated by Virgin Australia.(VA 334)
Lun,Vie-Dom 14:55 Brisbane (BNE) D 17:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6908 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-05-09 through 2026-05-15
Codeshare flight, operated by Virgin Australia.(VA 334)
Sab 14:55 Brisbane (BNE) D 17:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6908 Non-stop Boeing 737-700 (73W) 2:25 Effective 2026-05-16 through 2026-05-30
Codeshare flight, operated by Virgin Australia.(VA 334)
Lun,Vie,Dom 14:55 Brisbane (BNE) D 17:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6908 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-05-17 through 2026-06-05
Codeshare flight, operated by Virgin Australia.(VA 334)
Lun,Vie-Dom 14:55 Brisbane (BNE) D 17:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6908 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-06-06 through 2026-06-19
Codeshare flight, operated by Virgin Australia.(VA 334)
Sab 14:55 Brisbane (BNE) D 17:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6908 Non-stop Boeing 737-700 (73W) 2:25 Effective 2026-06-20 through 2026-06-27
Codeshare flight, operated by Virgin Australia.(VA 334)
Lun,Vie,Dom 14:55 Brisbane (BNE) D 17:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6908 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-06-21 through 2026-07-03
Codeshare flight, operated by Virgin Australia.(VA 334)
Lun,Vie-Dom 14:55 Brisbane (BNE) D 17:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6908 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-07-04 through 2026-07-24
Codeshare flight, operated by Virgin Australia.(VA 334)
prev   1 2 3 4 5 6 7   next


Singapore Airlines vuelos desde Brisbane (BNE) a Melbourne Tullamarine (MEL).
Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos de código compartido:

Effective 2026-05-20 through 2026-06-19
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 332)
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Vuelos directos de código compartido:

Effective 2026-05-30 through 2026-06-21
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 332)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-06-22 through 2026-06-29
Lun
Mar
-
Mie
-
Jue
Vie
-
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 332)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-06-23 through 2026-06-26
Lun
-
Mar
Mie
Jue
-
Vie
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 332)
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Vuelos directos de código compartido:

Effective 2026-06-30 through 2026-07-21
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 332)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-07-22 through 2026-07-30
Lun
Mar
-
Mie
Jue
Vie
-
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 332)
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Vuelos directos de código compartido:

Effective 2026-07-24 through 2026-07-28
Lun
-
Mar
Mie
-
Jue
-
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 332)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-07-31 through 2026-08-06
Lun
-
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 332)
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Vuelos directos de código compartido:

Effective 2026-08-01 through 2026-08-09
Lun
Mar
-
Mie
-
Jue
-
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 332)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-08-10 through 2026-08-24
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 332)
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Vuelos directos de código compartido:

Effective 2026-08-15 through 2026-08-23
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 332)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-08-25 through 2026-08-30
Lun
-
Mar
Mie
-
Jue
-
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 332)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-08-26 through 2026-09-03
Lun
Mar
Mie
Jue
Vie
-
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 332)
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Vuelos directos de código compartido:

Effective 2026-09-04 through 2026-09-11
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 332)
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Vuelos directos de código compartido:

Effective 2026-09-05 through 2026-09-13
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 332)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-09-14 through 2026-10-03
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 332)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-10-04 through 2026-10-24
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 332)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective from 2026-10-25
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Codeshare flight, operated by Virgin Australia. (VA 332)
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Vuelos directos de código compartido:

Effective from 2026-10-26
Lun
Mar
Mie
Jue
Vie
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 332)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Valid until 2026-01-08
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
Codeshare flight, operated by Virgin Australia. (VA 352)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-01-09 through 2026-01-16
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 352)
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Vuelos directos de código compartido:

Effective 2026-01-11 through 2026-01-19
Lun
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
Codeshare flight, operated by Virgin Australia. (VA 352)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-01-13 through 2026-01-14
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 352)
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Vuelos directos de código compartido:

Effective 2026-01-20 through 2026-01-30
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 352)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-02-01 through 2026-03-26
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
Codeshare flight, operated by Virgin Australia. (VA 352)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Operates only on 2026-03-27
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 352)
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Vuelos directos de código compartido:

Effective 2026-03-29 through 2026-04-03
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
Codeshare flight, operated by Virgin Australia. (VA 352)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Operates only on 2026-04-04
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 352)
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Vuelos directos de código compartido:

Effective 2026-04-05 through 2026-09-11
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 352)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Operates only on 2026-09-12
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 352)
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Vuelos directos de código compartido:

Effective 2026-09-13 through 2026-10-03
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 352)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-10-04 through 2026-10-24
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 352)
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Vuelos directos de código compartido:

Effective 2026-10-05 through 2026-10-23
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 352)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective from 2026-10-25
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Codeshare flight, operated by Virgin Australia. (VA 352)
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Vuelos directos de código compartido:

Effective from 2026-10-26
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 352)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Valid until 2026-01-30
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 334)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-02-01 through 2026-03-06
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
Codeshare flight, operated by Virgin Australia. (VA 334)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-02-21 through 2026-02-28
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 334)
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Vuelos directos de código compartido:

Effective 2026-03-07 through 2026-03-28
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 334)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-03-29 through 2026-04-03
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
Codeshare flight, operated by Virgin Australia. (VA 334)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-04-05 through 2026-04-24
Lun
Mar
-
Mie
-
Jue
-
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 334)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-04-25 through 2026-05-02
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 334)
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Vuelos directos de código compartido:

Effective 2026-04-26 through 2026-05-08
Lun
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
Codeshare flight, operated by Virgin Australia. (VA 334)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-05-09 through 2026-05-15
Lun
Mar
-
Mie
-
Jue
-
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 334)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-05-16 through 2026-05-30
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 334)
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Vuelos directos de código compartido:

Effective 2026-05-17 through 2026-06-05
Lun
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
Codeshare flight, operated by Virgin Australia. (VA 334)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-06-06 through 2026-06-19
Lun
Mar
-
Mie
-
Jue
-
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 334)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-06-20 through 2026-06-27
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 334)
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Vuelos directos de código compartido:

Effective 2026-06-21 through 2026-07-03
Lun
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
Codeshare flight, operated by Virgin Australia. (VA 334)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-07-04 through 2026-07-24
Lun
Mar
-
Mie
-
Jue
-
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 334)
Duration: 2:25, non-stop
Boeing 737-800 (73H)
prev        Page 5 / 7        next
  • Una ruta nacional saliendo desde el aeropuerto Brisbane (BNE) y llegando al aeropuerto Melbourne Tullamarine (MEL).
  • El vuelo tiene una distancia de 854 millas, o 1374 km.
  • La zona horaria tanto del aeropuerto de salida como del de llegada es UTC+10 . La hora actual en ambos aeropuertos es (loading...).
  • Para vuelos directos, el tiempo de vuelo oscila entre 2:20 y 2:25.