Austrian vuelos desde Belgrade (BEG) a Vienna (VIE).

Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:
Mie 11:00 Belgrade (BEG) 2 12:30 Vienna (VIE) 3
Austrian OS 722 Non-stop ATR 72 (AT7) 1:30 Effective 2026-01-21 through 2026-01-28
Diario 11:05 Belgrade (BEG) 2 12:15 Vienna (VIE) 3
Austrian OS 722 Non-stop Embraer EMB 195 (E95) 1:10 Effective 2026-03-29 through 2026-10-24
Diario 11:05 Belgrade (BEG) 2 12:35 Vienna (VIE) 3
Austrian OS 722 Non-stop ATR 72 (AT7) 1:30 Effective from 2026-10-25
Diario 11:10 Belgrade (BEG) 2 12:20 Vienna (VIE) 3
Austrian OS 722 Non-stop Embraer EMB 195 (E95) 1:10 Valid until 2026-01-05
Lun,Mie-Dom 11:10 Belgrade (BEG) 2 12:20 Vienna (VIE) 3
Austrian OS 722 Non-stop Embraer EMB 195 (E95) 1:10 Effective 2026-01-07 through 2026-01-19
Lun,Jue-Dom 11:10 Belgrade (BEG) 2 12:20 Vienna (VIE) 3
Austrian OS 722 Non-stop Embraer EMB 195 (E95) 1:10 Effective 2026-01-22 through 2026-02-02
Diario 11:10 Belgrade (BEG) 2 12:20 Vienna (VIE) 3
Austrian OS 722 Non-stop Embraer EMB 195 (E95) 1:10 Effective 2026-02-03 through 2026-03-28
Dom 18:10 Belgrade (BEG) 2 19:40 Vienna (VIE) 3
Austrian OS 724 Non-stop ATR 72 (AT7) 1:30 Valid until 2026-03-22
Jue 18:15 Belgrade (BEG) 2 19:45 Vienna (VIE) 3
Austrian OS 724 Non-stop Embraer EMB 195 (E95) 1:30 Valid until 2026-01-01
Mar,Mie,Vie 18:15 Belgrade (BEG) 2 19:45 Vienna (VIE) 3
Austrian OS 724 Non-stop ATR 72 (AT7) 1:30 Valid until 2026-01-20
Mar,Mie,Vie 18:15 Belgrade (BEG) 2 19:45 Vienna (VIE) 3
Austrian OS 724 Non-stop ATR 72 (AT7) 1:30 Effective 2026-01-27 through 2026-03-04
Mar-Vie 18:15 Belgrade (BEG) 2 19:45 Vienna (VIE) 3
Austrian OS 724 Non-stop ATR 72 (AT7) 1:30 Effective 2026-03-05 through 2026-03-27
Mar-Vie,Dom 18:15 Belgrade (BEG) 2 19:45 Vienna (VIE) 3
Austrian OS 724 Non-stop ATR 72 (AT7) 1:30 Effective from 2026-10-25
Vie 18:30 Belgrade (BEG) 2 20:00 Vienna (VIE) 3
Austrian OS 724 Non-stop ATR 72 (AT7) 1:30 Operates only on 2026-01-23
Diario 18:30 Belgrade (BEG) 2 20:00 Vienna (VIE) 3
Austrian OS 724 Non-stop ATR 72 (AT7) 1:30 Effective 2026-03-29 through 2026-10-24
Lun-Sab 06:50 Belgrade (BEG) 2 08:05 Vienna (VIE) 3
Austrian OS 726 Non-stop Airbus A320 (320) 1:15 Effective 2026-01-02 through 2026-01-13
Mie,Sab 06:50 Belgrade (BEG) 2 08:05 Vienna (VIE) 3
Austrian OS 726 Non-stop Embraer EMB 195 (E95) 1:15 Effective 2026-01-14 through 2026-01-17
Lun-Vie 06:50 Belgrade (BEG) 2 08:05 Vienna (VIE) 3
Austrian OS 726 Non-stop Airbus A320 (320) 1:15 Effective 2026-01-15 through 2026-01-22
Lun,Jue,Vie 06:50 Belgrade (BEG) 2 08:05 Vienna (VIE) 3
Austrian OS 726 Non-stop Embraer EMB 195 (E95) 1:15 Effective 2026-01-23 through 2026-01-29
Mar,Mie,Vie,Sab 06:50 Belgrade (BEG) 2 08:05 Vienna (VIE) 3
Austrian OS 726 Non-stop Airbus A320 (320) 1:15 Effective 2026-01-24 through 2026-01-31
Lun-Sab 06:50 Belgrade (BEG) 2 08:05 Vienna (VIE) 3
Austrian OS 726 Non-stop Airbus A320 (320) 1:15 Effective 2026-02-02 through 2026-02-28
Lun-Sab 06:50 Belgrade (BEG) 2 08:05 Vienna (VIE) 3
Austrian OS 726 Non-stop Embraer EMB 195 (E95) 1:15 Effective 2026-03-02 through 2026-03-07
Lun,Mie 06:50 Belgrade (BEG) 2 08:05 Vienna (VIE) 3
Austrian OS 726 Non-stop Airbus A320 (320) 1:15 Effective 2026-03-09 through 2026-03-11
Lun,Mar,Jue-Sab 06:50 Belgrade (BEG) 2 08:05 Vienna (VIE) 3
Austrian OS 726 Non-stop Embraer EMB 195 (E95) 1:15 Effective 2026-03-10 through 2026-03-17
Mar-Sab 06:50 Belgrade (BEG) 2 08:05 Vienna (VIE) 3
Austrian OS 726 Non-stop Embraer EMB 195 (E95) 1:15 Effective 2026-03-18 through 2026-03-28
Lun 06:50 Belgrade (BEG) 2 08:05 Vienna (VIE) 3
Austrian OS 726 Non-stop Airbus A320 (320) 1:15 Operates only on 2026-03-23
Lun-Sab 06:50 Belgrade (BEG) 2 08:05 Vienna (VIE) 3
Austrian OS 726 Non-stop Airbus A320 (320) 1:15 Effective from 2026-10-26
Lun 07:00 Belgrade (BEG) 2 08:10 Vienna (VIE) 3
Austrian OS 726 Non-stop Embraer EMB 195 (E95) 1:10 Operates only on 2026-03-30
Diario 07:00 Belgrade (BEG) 2 08:10 Vienna (VIE) 3
Austrian OS 726 Non-stop Airbus A320 (320) 1:10 Effective 2026-03-31 through 2026-07-03
Sab 07:00 Belgrade (BEG) 2 08:10 Vienna (VIE) 3
Austrian OS 726 Non-stop Embraer EMB 195 (E95) 1:10 Effective 2026-07-04 through 2026-09-12
Lun-Vie,Dom 07:00 Belgrade (BEG) 2 08:10 Vienna (VIE) 3
Austrian OS 726 Non-stop Airbus A320 (320) 1:10 Effective 2026-07-05 through 2026-09-18
Diario 07:00 Belgrade (BEG) 2 08:10 Vienna (VIE) 3
Austrian OS 726 Non-stop Airbus A320 (320) 1:10 Effective 2026-09-19 through 2026-10-24


Austrian vuelos desde Belgrade (BEG) a Vienna (VIE).
Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:

11:00

12:30
Effective 2026-01-21 through 2026-01-28
Lun
-
Mar
-
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:30, non-stop
ATR 72 (AT7)

Vuelos directos:

11:05

12:15
Effective 2026-03-29 through 2026-10-24
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Duration: 1:10, non-stop
Embraer EMB 195 (E95)

Vuelos directos:

11:05

12:35
Effective from 2026-10-25
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Duration: 1:30, non-stop
ATR 72 (AT7)

Vuelos directos:

11:10

12:20
Valid until 2026-01-05
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Duration: 1:10, non-stop
Embraer EMB 195 (E95)

Vuelos directos:

11:10

12:20
Effective 2026-01-07 through 2026-01-19
Lun
Mar
-
Mie
Jue
Vie
Sab
Dom
Duration: 1:10, non-stop
Embraer EMB 195 (E95)

Vuelos directos:

11:10

12:20
Effective 2026-01-22 through 2026-02-02
Lun
Mar
-
Mie
-
Jue
Vie
Sab
Dom
Duration: 1:10, non-stop
Embraer EMB 195 (E95)

Vuelos directos:

11:10

12:20
Effective 2026-02-03 through 2026-03-28
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Duration: 1:10, non-stop
Embraer EMB 195 (E95)

Vuelos directos:

18:10

19:40
Valid until 2026-03-22
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:30, non-stop
ATR 72 (AT7)

Vuelos directos:

18:15

19:45
Valid until 2026-01-01
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:30, non-stop
Embraer EMB 195 (E95)

Vuelos directos:

18:15

19:45
Valid until 2026-01-20
Lun
-
Mar
Mie
Jue
-
Vie
Sab
-
Dom
-
Duration: 1:30, non-stop
ATR 72 (AT7)

Vuelos directos:

18:15

19:45
Effective 2026-01-27 through 2026-03-04
Lun
-
Mar
Mie
Jue
-
Vie
Sab
-
Dom
-
Duration: 1:30, non-stop
ATR 72 (AT7)

Vuelos directos:

18:15

19:45
Effective 2026-03-05 through 2026-03-27
Lun
-
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 1:30, non-stop
ATR 72 (AT7)

Vuelos directos:

18:15

19:45
Effective from 2026-10-25
Lun
-
Mar
Mie
Jue
Vie
Sab
-
Dom
Duration: 1:30, non-stop
ATR 72 (AT7)

Vuelos directos:

18:30

20:00
Operates only on 2026-01-23
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 1:30, non-stop
ATR 72 (AT7)

Vuelos directos:

18:30

20:00
Effective 2026-03-29 through 2026-10-24
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Duration: 1:30, non-stop
ATR 72 (AT7)

Vuelos directos:

06:50

08:05
Effective 2026-01-02 through 2026-01-13
Lun
Mar
Mie
Jue
Vie
Sab
Dom
-
Duration: 1:15, non-stop
Airbus A320 (320)

Vuelos directos:

06:50

08:05
Effective 2026-01-14 through 2026-01-17
Lun
-
Mar
-
Mie
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:15, non-stop
Embraer EMB 195 (E95)

Vuelos directos:

06:50

08:05
Effective 2026-01-15 through 2026-01-22
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 1:15, non-stop
Airbus A320 (320)

Vuelos directos:

06:50

08:05
Effective 2026-01-23 through 2026-01-29
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 1:15, non-stop
Embraer EMB 195 (E95)

Vuelos directos:

06:50

08:05
Effective 2026-01-24 through 2026-01-31
Lun
-
Mar
Mie
Jue
-
Vie
Sab
Dom
-
Duration: 1:15, non-stop
Airbus A320 (320)

Vuelos directos:

06:50

08:05
Effective 2026-02-02 through 2026-02-28
Lun
Mar
Mie
Jue
Vie
Sab
Dom
-
Duration: 1:15, non-stop
Airbus A320 (320)

Vuelos directos:

06:50

08:05
Effective 2026-03-02 through 2026-03-07
Lun
Mar
Mie
Jue
Vie
Sab
Dom
-
Duration: 1:15, non-stop
Embraer EMB 195 (E95)

Vuelos directos:

06:50

08:05
Effective 2026-03-09 through 2026-03-11
Lun
Mar
-
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:15, non-stop
Airbus A320 (320)

Vuelos directos:

06:50

08:05
Effective 2026-03-10 through 2026-03-17
Lun
Mar
Mie
-
Jue
Vie
Sab
Dom
-
Duration: 1:15, non-stop
Embraer EMB 195 (E95)

Vuelos directos:

06:50

08:05
Effective 2026-03-18 through 2026-03-28
Lun
-
Mar
Mie
Jue
Vie
Sab
Dom
-
Duration: 1:15, non-stop
Embraer EMB 195 (E95)

Vuelos directos:

06:50

08:05
Operates only on 2026-03-23
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:15, non-stop
Airbus A320 (320)

Vuelos directos:

06:50

08:05
Effective from 2026-10-26
Lun
Mar
Mie
Jue
Vie
Sab
Dom
-
Duration: 1:15, non-stop
Airbus A320 (320)

Vuelos directos:

07:00

08:10
Operates only on 2026-03-30
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:10, non-stop
Embraer EMB 195 (E95)

Vuelos directos:

07:00

08:10
Effective 2026-03-31 through 2026-07-03
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Duration: 1:10, non-stop
Airbus A320 (320)

Vuelos directos:

07:00

08:10
Effective 2026-07-04 through 2026-09-12
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:10, non-stop
Embraer EMB 195 (E95)

Vuelos directos:

07:00

08:10
Effective 2026-07-05 through 2026-09-18
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
Duration: 1:10, non-stop
Airbus A320 (320)

Vuelos directos:

07:00

08:10
Effective 2026-09-19 through 2026-10-24
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Duration: 1:10, non-stop
Airbus A320 (320)
  • Una ruta internacional saliendo desde el aeropuerto Belgrade (BEG) y llegando al aeropuerto Vienna (VIE).
  • El vuelo tiene una distancia de 289 millas, o 464 km.
  • La zona horaria tanto del aeropuerto de salida como del de llegada es UTC+1 . La hora actual en ambos aeropuertos es (loading...).
  • Para vuelos directos, el tiempo de vuelo oscila entre 1:10 y 1:30.