Air China vuelos desde Shenzhen (SZX) a Chongqing (CKG).

Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:
Diario 10:25 Shenzhen (SZX) 12:40 Chongqing (CKG) 3
Air China CA 4344 Non-stop Boeing 737-800 (738) 2:15 Effective 2024-10-27 through 2025-03-29
Mar,Jue-Dom 10:40 Shenzhen (SZX) 13:00 Chongqing (CKG) 3
Air China CA 4344 Non-stop Boeing 737-800 (738) 2:20 Valid until 2024-09-01
Lun-Jue,Sab 10:40 Shenzhen (SZX) 12:55 Chongqing (CKG) 3
Air China CA 4344 Non-stop Boeing 737-800 (738) 2:15 Effective 2024-09-02 through 2024-10-26
Vie,Dom 10:40 Shenzhen (SZX) 13:00 Chongqing (CKG) 3
Air China CA 4344 Non-stop Boeing 737-800 (738) 2:20 Effective 2024-09-06 through 2024-10-25
Vie,Dom 10:40 Shenzhen (SZX) 13:00 Chongqing (CKG) 3
Air China CA 4344 Non-stop Boeing 737-800 (738) 2:20 Effective from 2025-03-30
Lun-Jue,Sab 10:40 Shenzhen (SZX) 12:55 Chongqing (CKG) 3
Air China CA 4344 Non-stop Boeing 737-800 (738) 2:15 Effective from 2025-03-31
Lun,Mie 20:40 Shenzhen (SZX) 22:55 Chongqing (CKG) 3
Air China CA 4346 Non-stop Boeing 737-800 (738) 2:15 Valid until 2024-10-23
Mar,Vie,Dom 20:40 Shenzhen (SZX) 23:00 Chongqing (CKG) 3
Air China CA 4346 Non-stop Boeing 787-9 (789) 2:20 Valid until 2024-10-25
Jue 20:40 Shenzhen (SZX) 23:00 Chongqing (CKG) 3
Air China CA 4346 Non-stop Boeing 737-800 (738) 2:20 Effective 2024-09-05 through 2024-10-24
Sab 20:40 Shenzhen (SZX) 23:05 Chongqing (CKG) 3
Air China CA 4346 Non-stop Boeing 737-800 (738) 2:25 Effective 2024-09-07 through 2024-10-26
Mar,Vie,Dom 20:40 Shenzhen (SZX) 23:00 Chongqing (CKG) 3
Air China CA 4346 Non-stop Boeing 787-9 (789) 2:20 Effective from 2025-03-30
Lun,Jue 20:40 Shenzhen (SZX) 23:00 Chongqing (CKG) 3
Air China CA 4346 Non-stop Boeing 737-800 (738) 2:20 Effective from 2025-03-31
Mie,Sab 20:40 Shenzhen (SZX) 23:05 Chongqing (CKG) 3
Air China CA 4346 Non-stop Boeing 737-800 (738) 2:25 Effective from 2025-04-02
Lun,Mie,Vie,Dom 20:50 Shenzhen (SZX) 23:15 Chongqing (CKG) 3
Air China CA 4346 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-10-27 through 2025-03-28
Mar,Jue,Sab 20:50 Shenzhen (SZX) 23:10 Chongqing (CKG) 3
Air China CA 4346 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Effective 2024-10-29 through 2025-03-29
Mie-Vie,Dom 07:25 Shenzhen (SZX) 10:00 Chongqing (CKG) 3
Air China CA 4368 Non-stop Boeing 737-800 (738) 2:35 Valid until 2024-09-04
Lun,Mar,Sab 07:25 Shenzhen (SZX) 09:50 Chongqing (CKG) 3
Air China CA 4368 Non-stop Boeing 737-800 (738) 2:25 Effective 2024-09-02 through 2024-10-26
Jue,Vie 07:25 Shenzhen (SZX) 09:55 Chongqing (CKG) 3
Air China CA 4368 Non-stop Boeing 737-800 (738) 2:30 Effective 2024-09-05 through 2024-10-25
Mie,Dom 07:25 Shenzhen (SZX) 10:00 Chongqing (CKG) 3
Air China CA 4368 Non-stop Boeing 737-800 (738) 2:35 Effective 2024-09-08 through 2024-10-23
Diario 07:25 Shenzhen (SZX) 09:40 Chongqing (CKG) 3
Air China CA 4368 Non-stop Boeing 737-800 (738) 2:15 Effective 2024-10-27 through 2025-03-29
Mie,Dom 07:45 Shenzhen (SZX) 10:00 Chongqing (CKG) 3
Air China CA 4368 Non-stop Boeing 737-800 (738) 2:15 Effective from 2025-03-30
Lun,Mar,Jue-Sab 07:45 Shenzhen (SZX) 09:55 Chongqing (CKG) 3
Air China CA 4368 Non-stop Boeing 737-800 (738) 2:10 Effective from 2025-03-31
Vuelos directos de código compartido:
Diario 10:45 Shenzhen (SZX) 13:05 Chongqing (CKG) 3
Air China CA 3559 Non-stop Boeing 737-800 (738) 2:20 Effective 2024-10-27 through 2025-03-29
Codeshare flight, operated by Shenzhen Airlines.(ZH 9425)
Diario 17:05 Shenzhen (SZX) 19:15 Chongqing (CKG) 3
Air China CA 3559 Non-stop Boeing 737-800 (738) 2:10 Valid until 2024-10-26
Codeshare flight, operated by Shenzhen Airlines.(ZH 9425)
Diario 20:25 Shenzhen (SZX) 22:50 Chongqing (CKG) 3
Air China CA 3571 Non-stop Boeing 737-800 (738) 2:25 Effective 2024-10-27 through 2025-03-29
Codeshare flight, operated by Shenzhen Airlines.(ZH 9431)
Diario 21:10 Shenzhen (SZX) 23:15 Chongqing (CKG) 3
Air China CA 3571 Non-stop Boeing 737-800 (738) 2:05 Valid until 2024-10-26
Codeshare flight, operated by Shenzhen Airlines.(ZH 9431)
Diario 11:25 Shenzhen (SZX) 14:15 Chongqing (CKG) 3
Air China CA 3601 Non-stop Boeing 737-800 (738) 2:50 Effective 2024-10-09 through 2024-10-26
Codeshare flight, operated by Shenzhen Airlines.(ZH 9423)
Diario 12:20 Shenzhen (SZX) 14:40 Chongqing (CKG) 3
Air China CA 3601 Non-stop Boeing 737-800 (738) 2:20 Valid until 2024-10-08
Codeshare flight, operated by Shenzhen Airlines.(ZH 9423)
Diario 07:00 Shenzhen (SZX) 08:50 Chongqing (CKG) 3
Air China CA 3721 Non-stop Boeing 737-800 (738) 1:50 Valid until 2024-10-08
Codeshare flight, operated by Shenzhen Airlines.(ZH 9421)
Diario 07:35 Shenzhen (SZX) 10:00 Chongqing (CKG) 3
Air China CA 3721 Non-stop Boeing 737-800 (738) 2:25 Effective 2024-10-27 through 2025-03-29
Codeshare flight, operated by Shenzhen Airlines.(ZH 9421)
Diario 08:20 Shenzhen (SZX) 10:45 Chongqing (CKG) 3
Air China CA 3721 Non-stop Boeing 737-800 (738) 2:25 Effective 2024-10-09 through 2024-10-26
Codeshare flight, operated by Shenzhen Airlines.(ZH 9421)
Diario 15:55 Shenzhen (SZX) 18:30 Chongqing (CKG) 3
Air China CA 3727 Non-stop Boeing 737-800 (738) 2:35 Effective 2024-10-27 through 2025-03-29
Codeshare flight, operated by Shenzhen Airlines.(ZH 9427)
Diario 19:05 Shenzhen (SZX) 21:10 Chongqing (CKG) 3
Air China CA 3727 Non-stop Boeing 737-800 (738) 2:05 Effective 2024-10-09 through 2024-10-26
Codeshare flight, operated by Shenzhen Airlines.(ZH 9427)
Diario 08:20 Shenzhen (SZX) 10:45 Chongqing (CKG) 3
Air China CA 7907 Non-stop Airbus A320 (320) 2:25 Valid until 2024-10-08
Codeshare flight, operated by Shenzhen Airlines.(ZH 8113)


Air China vuelos desde Shenzhen (SZX) a Chongqing (CKG).
Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:

Effective 2024-10-27 through 2025-03-29
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Duration: 2:15, non-stop
Boeing 737-800 (738)

Valid until 2024-09-01
Lun
-
Mar
Mie
-
Jue
Vie
Sab
Dom
Duration: 2:20, non-stop
Boeing 737-800 (738)

Effective 2024-09-02 through 2024-10-26
Lun
Mar
Mie
Jue
Vie
-
Sab
Dom
-
Duration: 2:15, non-stop
Boeing 737-800 (738)

Effective 2024-09-06 through 2024-10-25
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
Duration: 2:20, non-stop
Boeing 737-800 (738)

Effective from 2025-03-30
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
Duration: 2:20, non-stop
Boeing 737-800 (738)

Effective from 2025-03-31
Lun
Mar
Mie
Jue
Vie
-
Sab
Dom
-
Duration: 2:15, non-stop
Boeing 737-800 (738)

Valid until 2024-10-23
Lun
Mar
-
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:15, non-stop
Boeing 737-800 (738)

Valid until 2024-10-25
Lun
-
Mar
Mie
-
Jue
-
Vie
Sab
-
Dom
Duration: 2:20, non-stop
Boeing 787-9 (789)

Effective 2024-09-05 through 2024-10-24
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 2:20, non-stop
Boeing 737-800 (738)

Effective 2024-09-07 through 2024-10-26
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:25, non-stop
Boeing 737-800 (738)

Effective from 2025-03-30
Lun
-
Mar
Mie
-
Jue
-
Vie
Sab
-
Dom
Duration: 2:20, non-stop
Boeing 787-9 (789)

Effective from 2025-03-31
Lun
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 2:20, non-stop
Boeing 737-800 (738)

Effective from 2025-04-02
Lun
-
Mar
-
Mie
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:25, non-stop
Boeing 737-800 (738)

Effective 2024-10-27 through 2025-03-28
Lun
Mar
-
Mie
Jue
-
Vie
Sab
-
Dom
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-10-29 through 2025-03-29
Lun
-
Mar
Mie
-
Jue
Vie
-
Sab
Dom
-
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Valid until 2024-09-04
Lun
-
Mar
-
Mie
Jue
Vie
Sab
-
Dom
Duration: 2:35, non-stop
Boeing 737-800 (738)

Effective 2024-09-02 through 2024-10-26
Lun
Mar
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:25, non-stop
Boeing 737-800 (738)

Effective 2024-09-05 through 2024-10-25
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 2:30, non-stop
Boeing 737-800 (738)

Effective 2024-09-08 through 2024-10-23
Lun
-
Mar
-
Mie
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:35, non-stop
Boeing 737-800 (738)

Effective 2024-10-27 through 2025-03-29
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Duration: 2:15, non-stop
Boeing 737-800 (738)

Effective from 2025-03-30
Lun
-
Mar
-
Mie
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:15, non-stop
Boeing 737-800 (738)

Effective from 2025-03-31
Lun
Mar
Mie
-
Jue
Vie
Sab
Dom
-
Duration: 2:10, non-stop
Boeing 737-800 (738)

Vuelos directos de código compartido:

Effective 2024-10-27 through 2025-03-29
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Shenzhen Airlines. (ZH 9425)
Duration: 2:20, non-stop
Boeing 737-800 (738)

Valid until 2024-10-26
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Shenzhen Airlines. (ZH 9425)
Duration: 2:10, non-stop
Boeing 737-800 (738)

Effective 2024-10-27 through 2025-03-29
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Shenzhen Airlines. (ZH 9431)
Duration: 2:25, non-stop
Boeing 737-800 (738)

Valid until 2024-10-26
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Shenzhen Airlines. (ZH 9431)
Duration: 2:05, non-stop
Boeing 737-800 (738)

Effective 2024-10-09 through 2024-10-26
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Shenzhen Airlines. (ZH 9423)
Duration: 2:50, non-stop
Boeing 737-800 (738)

Valid until 2024-10-08
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Shenzhen Airlines. (ZH 9423)
Duration: 2:20, non-stop
Boeing 737-800 (738)

Valid until 2024-10-08
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Shenzhen Airlines. (ZH 9421)
Duration: 1:50, non-stop
Boeing 737-800 (738)

Effective 2024-10-27 through 2025-03-29
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Shenzhen Airlines. (ZH 9421)
Duration: 2:25, non-stop
Boeing 737-800 (738)

Effective 2024-10-09 through 2024-10-26
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Shenzhen Airlines. (ZH 9421)
Duration: 2:25, non-stop
Boeing 737-800 (738)

Effective 2024-10-27 through 2025-03-29
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Shenzhen Airlines. (ZH 9427)
Duration: 2:35, non-stop
Boeing 737-800 (738)

Effective 2024-10-09 through 2024-10-26
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Shenzhen Airlines. (ZH 9427)
Duration: 2:05, non-stop
Boeing 737-800 (738)

Valid until 2024-10-08
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Shenzhen Airlines. (ZH 8113)
Duration: 2:25, non-stop
Airbus A320 (320)
  • Una ruta nacional saliendo desde el aeropuerto Shenzhen (SZX) y llegando al aeropuerto Chongqing (CKG).
  • El vuelo tiene una distancia de 660 millas, o 1063 km.
  • La zona horaria tanto del aeropuerto de salida como del de llegada es UTC+8 . La hora actual en ambos aeropuertos es (loading...).
  • Para vuelos directos, el tiempo de vuelo oscila entre 1:50 y 2:50.