Virgin Atlantic vuelo VS 5716: Jeddah - London Heathrow

Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos de código compartido:
Lun-Mie,Vie 08:10 Jeddah (JED) 1 12:40 London Heathrow (LHR) 4
VS 5716 Non-stop Boeing 787-9 (789) 6:30 Valid until 2025-05-06
Codeshare flight, operated by Saudia.(SV 119)
Mie,Jue,Sab,Dom 08:10 Jeddah (JED) 1 12:40 London Heathrow (LHR) 4
VS 5716 Non-stop Boeing 787 (787) 6:30 Valid until 2025-05-11
Codeshare flight, operated by Saudia.(SV 119)
Lun-Vie 08:10 Jeddah (JED) 1 12:40 London Heathrow (LHR) 4
VS 5716 Non-stop Boeing 787-9 (789) 6:30 Effective 2025-05-09 through 2025-05-20
Codeshare flight, operated by Saudia.(SV 119)
Mie,Jue,Sab,Dom 08:10 Jeddah (JED) 1 12:40 London Heathrow (LHR) 4
VS 5716 Non-stop Boeing 787 (787) 6:30 Effective 2025-05-17 through 2025-05-25
Codeshare flight, operated by Saudia.(SV 119)
Lun-Mie,Vie 08:10 Jeddah (JED) 1 12:40 London Heathrow (LHR) 4
VS 5716 Non-stop Boeing 787-9 (789) 6:30 Effective 2025-05-23 through 2025-05-30
Codeshare flight, operated by Saudia.(SV 119)
Jue,Dom 08:10 Jeddah (JED) 1 12:40 London Heathrow (LHR) 4
VS 5716 Non-stop Boeing 787 (787) 6:30 Effective 2025-05-29 through 2025-06-01
Codeshare flight, operated by Saudia.(SV 119)
Lun-Sab 08:10 Jeddah (JED) 1 12:40 London Heathrow (LHR) 4
VS 5716 Non-stop Boeing 787-9 (789) 6:30 Effective 2025-05-31 through 2025-06-06
Codeshare flight, operated by Saudia.(SV 119)
Lun,Mie-Sab 08:10 Jeddah (JED) 1 12:40 London Heathrow (LHR) 4
VS 5716 Non-stop Boeing 787 (787) 6:30 Effective 2025-06-07 through 2025-06-14
Codeshare flight, operated by Saudia.(SV 119)
Mar,Dom 08:10 Jeddah (JED) 1 12:40 London Heathrow (LHR) 4
VS 5716 Non-stop Boeing 787-9 (789) 6:30 Effective 2025-06-08 through 2025-06-10
Codeshare flight, operated by Saudia.(SV 119)
Vie,Dom 08:10 Jeddah (JED) 1 12:40 London Heathrow (LHR) 4
VS 5716 Non-stop Boeing 787 (787) 6:30 Effective 2025-06-15 through 2025-06-20
Codeshare flight, operated by Saudia.(SV 119)
Lun-Jue,Sab,Dom 08:10 Jeddah (JED) 1 12:40 London Heathrow (LHR) 4
VS 5716 Non-stop Boeing 787-9 (789) 6:30 Effective 2025-06-16 through 2025-06-22
Codeshare flight, operated by Saudia.(SV 119)
Lun,Mar,Jue,Sab,Dom 08:10 Jeddah (JED) 1 12:40 London Heathrow (LHR) 4
VS 5716 Non-stop Boeing 787 (787) 6:30 Effective 2025-06-23 through 2025-06-29
Codeshare flight, operated by Saudia.(SV 119)
Lun-Mie,Vie 08:10 Jeddah (JED) 1 12:40 London Heathrow (LHR) 4
VS 5716 Non-stop Boeing 787-9 (789) 6:30 Effective 2025-06-25 through 2025-07-01
Codeshare flight, operated by Saudia.(SV 119)
Mie,Vie,Dom 08:10 Jeddah (JED) 1 12:40 London Heathrow (LHR) 4
VS 5716 Non-stop Boeing 787 (787) 6:30 Effective 2025-07-02 through 2025-07-09
Codeshare flight, operated by Saudia.(SV 119)
Lun,Mar,Jue,Sab 08:10 Jeddah (JED) 1 12:40 London Heathrow (LHR) 4
VS 5716 Non-stop Boeing 787-9 (789) 6:30 Effective 2025-07-03 through 2025-07-08
Codeshare flight, operated by Saudia.(SV 119)
Mie-Vie,Dom 08:10 Jeddah (JED) 1 12:40 London Heathrow (LHR) 4
VS 5716 Non-stop Boeing 787 (787) 6:30 Effective 2025-07-10 through 2025-07-17
Codeshare flight, operated by Saudia.(SV 119)
Lun,Mar,Vie,Sab 08:10 Jeddah (JED) 1 12:40 London Heathrow (LHR) 4
VS 5716 Non-stop Boeing 787-9 (789) 6:30 Effective 2025-07-12 through 2025-07-18
Codeshare flight, operated by Saudia.(SV 119)
Mie-Dom 08:10 Jeddah (JED) 1 12:40 London Heathrow (LHR) 4
VS 5716 Non-stop Boeing 787 (787) 6:30 Effective 2025-07-19 through 2025-07-25
Codeshare flight, operated by Saudia.(SV 119)
Lun,Mar,Sab 08:10 Jeddah (JED) 1 12:40 London Heathrow (LHR) 4
VS 5716 Non-stop Boeing 787-9 (789) 6:30 Effective 2025-07-21 through 2025-07-29
Codeshare flight, operated by Saudia.(SV 119)
Mie,Jue,Sab,Dom 08:10 Jeddah (JED) 1 12:40 London Heathrow (LHR) 4
VS 5716 Non-stop Boeing 787 (787) 6:30 Effective 2025-07-27 through 2025-08-07
Codeshare flight, operated by Saudia.(SV 119)
Lun,Mar,Vie 08:10 Jeddah (JED) 1 12:40 London Heathrow (LHR) 4
VS 5716 Non-stop Boeing 787-9 (789) 6:30 Effective 2025-08-01 through 2025-08-05
Codeshare flight, operated by Saudia.(SV 119)
Mie,Vie-Dom 08:10 Jeddah (JED) 1 12:40 London Heathrow (LHR) 4
VS 5716 Non-stop Boeing 787 (787) 6:30 Effective 2025-08-08 through 2025-08-13
Codeshare flight, operated by Saudia.(SV 119)
Lun,Mar,Jue,Vie 08:10 Jeddah (JED) 1 12:40 London Heathrow (LHR) 4
VS 5716 Non-stop Boeing 787-9 (789) 6:30 Effective 2025-08-11 through 2025-08-19
Codeshare flight, operated by Saudia.(SV 119)
Mie,Jue,Sab,Dom 08:10 Jeddah (JED) 1 12:40 London Heathrow (LHR) 4
VS 5716 Non-stop Boeing 787 (787) 6:30 Effective 2025-08-16 through 2025-08-21
Codeshare flight, operated by Saudia.(SV 119)
Lun,Mar,Vie,Sab 08:10 Jeddah (JED) 1 12:40 London Heathrow (LHR) 4
VS 5716 Non-stop Boeing 787-9 (789) 6:30 Effective 2025-08-22 through 2025-08-29
Codeshare flight, operated by Saudia.(SV 119)
Mie,Jue,Sab,Dom 08:10 Jeddah (JED) 1 12:40 London Heathrow (LHR) 4
VS 5716 Non-stop Boeing 787 (787) 6:30 Effective 2025-08-24 through 2025-09-04
Codeshare flight, operated by Saudia.(SV 119)
Lun,Mar,Vie,Sab 08:10 Jeddah (JED) 1 12:40 London Heathrow (LHR) 4
VS 5716 Non-stop Boeing 787-9 (789) 6:30 Effective 2025-09-01 through 2025-09-09
Codeshare flight, operated by Saudia.(SV 119)
Jue,Dom 08:10 Jeddah (JED) 1 12:40 London Heathrow (LHR) 4
VS 5716 Non-stop Boeing 787 (787) 6:30 Effective 2025-09-07 through 2025-09-14
Codeshare flight, operated by Saudia.(SV 119)
Lun-Mie,Vie,Sab 08:10 Jeddah (JED) 1 12:40 London Heathrow (LHR) 4
VS 5716 Non-stop Boeing 787-9 (789) 6:30 Effective 2025-09-10 through 2025-09-17
Codeshare flight, operated by Saudia.(SV 119)
Lun-Vie 08:10 Jeddah (JED) 1 12:40 London Heathrow (LHR) 4
VS 5716 Non-stop Boeing 787-9 (789) 6:30 Effective 2025-09-18 through 2025-09-24
Codeshare flight, operated by Saudia.(SV 119)
Jue,Sab,Dom 08:10 Jeddah (JED) 1 12:40 London Heathrow (LHR) 4
VS 5716 Non-stop Boeing 787 (787) 6:30 Effective 2025-09-20 through 2025-10-02
Codeshare flight, operated by Saudia.(SV 119)
Lun-Mie,Vie 08:10 Jeddah (JED) 1 12:40 London Heathrow (LHR) 4
VS 5716 Non-stop Boeing 787-9 (789) 6:30 Effective 2025-09-26 through 2025-10-03
Codeshare flight, operated by Saudia.(SV 119)
Lun-Mie,Vie,Sab 08:10 Jeddah (JED) 1 12:40 London Heathrow (LHR) 4
VS 5716 Non-stop Boeing 787-9 (789) 6:30 Effective 2025-10-04 through 2025-10-10
Codeshare flight, operated by Saudia.(SV 119)
Jue,Sab,Dom 08:10 Jeddah (JED) 1 12:40 London Heathrow (LHR) 4
VS 5716 Non-stop Boeing 787 (787) 6:30 Effective 2025-10-05 through 2025-10-19
Codeshare flight, operated by Saudia.(SV 119)
Lun-Mie,Vie 08:10 Jeddah (JED) 1 12:40 London Heathrow (LHR) 4
VS 5716 Non-stop Boeing 787-9 (789) 6:30 Effective 2025-10-13 through 2025-10-21
Codeshare flight, operated by Saudia.(SV 119)
Mie,Jue 08:10 Jeddah (JED) 1 12:40 London Heathrow (LHR) 4
VS 5716 Non-stop Boeing 787 (787) 6:30 Effective 2025-10-22 through 2025-10-23
Codeshare flight, operated by Saudia.(SV 119)
Vie,Sab 08:10 Jeddah (JED) 1 12:40 London Heathrow (LHR) 4
VS 5716 Non-stop Boeing 787-9 (789) 6:30 Effective 2025-10-24 through 2025-10-25
Codeshare flight, operated by Saudia.(SV 119)
Diario 08:25 Jeddah (JED) 1 12:15 London Heathrow (LHR) 4
VS 5716 Non-stop Boeing 787-9 (789) 6:50 Effective from 2025-10-26
Codeshare flight, operated by Saudia.(SV 119)
Virgin Atlantic vuelo VS 5716:
Jeddah - London Heathrow
Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos de código compartido:

Virgin Atlantic VS5716
Valid until 2025-05-06
Lun
Mar
Mie
Jue
-
Vie
Sab
-
Dom
-
Codeshare flight, operated by Saudia. (SV 119)
Duration: 6:30, non-stop
Boeing 787-9 (789)

Virgin Atlantic VS5716
Valid until 2025-05-11
Lun
-
Mar
-
Mie
Jue
Vie
-
Sab
Dom
Codeshare flight, operated by Saudia. (SV 119)
Duration: 6:30, non-stop
Boeing 787 (787)

Virgin Atlantic VS5716
Effective 2025-05-09 through 2025-05-20
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Codeshare flight, operated by Saudia. (SV 119)
Duration: 6:30, non-stop
Boeing 787-9 (789)

Virgin Atlantic VS5716
Effective 2025-05-17 through 2025-05-25
Lun
-
Mar
-
Mie
Jue
Vie
-
Sab
Dom
Codeshare flight, operated by Saudia. (SV 119)
Duration: 6:30, non-stop
Boeing 787 (787)

Virgin Atlantic VS5716
Effective 2025-05-23 through 2025-05-30
Lun
Mar
Mie
Jue
-
Vie
Sab
-
Dom
-
Codeshare flight, operated by Saudia. (SV 119)
Duration: 6:30, non-stop
Boeing 787-9 (789)

Virgin Atlantic VS5716
Effective 2025-05-29 through 2025-06-01
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
Codeshare flight, operated by Saudia. (SV 119)
Duration: 6:30, non-stop
Boeing 787 (787)

Virgin Atlantic VS5716
Effective 2025-05-31 through 2025-06-06
Lun
Mar
Mie
Jue
Vie
Sab
Dom
-
Codeshare flight, operated by Saudia. (SV 119)
Duration: 6:30, non-stop
Boeing 787-9 (789)

Virgin Atlantic VS5716
Effective 2025-06-07 through 2025-06-14
Lun
Mar
-
Mie
Jue
Vie
Sab
Dom
-
Codeshare flight, operated by Saudia. (SV 119)
Duration: 6:30, non-stop
Boeing 787 (787)

Virgin Atlantic VS5716
Effective 2025-06-08 through 2025-06-10
Lun
-
Mar
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Codeshare flight, operated by Saudia. (SV 119)
Duration: 6:30, non-stop
Boeing 787-9 (789)

Virgin Atlantic VS5716
Effective 2025-06-15 through 2025-06-20
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
Codeshare flight, operated by Saudia. (SV 119)
Duration: 6:30, non-stop
Boeing 787 (787)

Virgin Atlantic VS5716
Effective 2025-06-16 through 2025-06-22
Lun
Mar
Mie
Jue
Vie
-
Sab
Dom
Codeshare flight, operated by Saudia. (SV 119)
Duration: 6:30, non-stop
Boeing 787-9 (789)

Virgin Atlantic VS5716
Effective 2025-06-23 through 2025-06-29
Lun
Mar
Mie
-
Jue
Vie
-
Sab
Dom
Codeshare flight, operated by Saudia. (SV 119)
Duration: 6:30, non-stop
Boeing 787 (787)

Virgin Atlantic VS5716
Effective 2025-06-25 through 2025-07-01
Lun
Mar
Mie
Jue
-
Vie
Sab
-
Dom
-
Codeshare flight, operated by Saudia. (SV 119)
Duration: 6:30, non-stop
Boeing 787-9 (789)

Virgin Atlantic VS5716
Effective 2025-07-02 through 2025-07-09
Lun
-
Mar
-
Mie
Jue
-
Vie
Sab
-
Dom
Codeshare flight, operated by Saudia. (SV 119)
Duration: 6:30, non-stop
Boeing 787 (787)

Virgin Atlantic VS5716
Effective 2025-07-03 through 2025-07-08
Lun
Mar
Mie
-
Jue
Vie
-
Sab
Dom
-
Codeshare flight, operated by Saudia. (SV 119)
Duration: 6:30, non-stop
Boeing 787-9 (789)

Virgin Atlantic VS5716
Effective 2025-07-10 through 2025-07-17
Lun
-
Mar
-
Mie
Jue
Vie
Sab
-
Dom
Codeshare flight, operated by Saudia. (SV 119)
Duration: 6:30, non-stop
Boeing 787 (787)

Virgin Atlantic VS5716
Effective 2025-07-12 through 2025-07-18
Lun
Mar
Mie
-
Jue
-
Vie
Sab
Dom
-
Codeshare flight, operated by Saudia. (SV 119)
Duration: 6:30, non-stop
Boeing 787-9 (789)

Virgin Atlantic VS5716
Effective 2025-07-19 through 2025-07-25
Lun
-
Mar
-
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Saudia. (SV 119)
Duration: 6:30, non-stop
Boeing 787 (787)

Virgin Atlantic VS5716
Effective 2025-07-21 through 2025-07-29
Lun
Mar
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Codeshare flight, operated by Saudia. (SV 119)
Duration: 6:30, non-stop
Boeing 787-9 (789)

Virgin Atlantic VS5716
Effective 2025-07-27 through 2025-08-07
Lun
-
Mar
-
Mie
Jue
Vie
-
Sab
Dom
Codeshare flight, operated by Saudia. (SV 119)
Duration: 6:30, non-stop
Boeing 787 (787)

Virgin Atlantic VS5716
Effective 2025-08-01 through 2025-08-05
Lun
Mar
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Codeshare flight, operated by Saudia. (SV 119)
Duration: 6:30, non-stop
Boeing 787-9 (789)

Virgin Atlantic VS5716
Effective 2025-08-08 through 2025-08-13
Lun
-
Mar
-
Mie
Jue
-
Vie
Sab
Dom
Codeshare flight, operated by Saudia. (SV 119)
Duration: 6:30, non-stop
Boeing 787 (787)

Virgin Atlantic VS5716
Effective 2025-08-11 through 2025-08-19
Lun
Mar
Mie
-
Jue
Vie
Sab
-
Dom
-
Codeshare flight, operated by Saudia. (SV 119)
Duration: 6:30, non-stop
Boeing 787-9 (789)

Virgin Atlantic VS5716
Effective 2025-08-16 through 2025-08-21
Lun
-
Mar
-
Mie
Jue
Vie
-
Sab
Dom
Codeshare flight, operated by Saudia. (SV 119)
Duration: 6:30, non-stop
Boeing 787 (787)

Virgin Atlantic VS5716
Effective 2025-08-22 through 2025-08-29
Lun
Mar
Mie
-
Jue
-
Vie
Sab
Dom
-
Codeshare flight, operated by Saudia. (SV 119)
Duration: 6:30, non-stop
Boeing 787-9 (789)

Virgin Atlantic VS5716
Effective 2025-08-24 through 2025-09-04
Lun
-
Mar
-
Mie
Jue
Vie
-
Sab
Dom
Codeshare flight, operated by Saudia. (SV 119)
Duration: 6:30, non-stop
Boeing 787 (787)

Virgin Atlantic VS5716
Effective 2025-09-01 through 2025-09-09
Lun
Mar
Mie
-
Jue
-
Vie
Sab
Dom
-
Codeshare flight, operated by Saudia. (SV 119)
Duration: 6:30, non-stop
Boeing 787-9 (789)

Virgin Atlantic VS5716
Effective 2025-09-07 through 2025-09-14
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
Codeshare flight, operated by Saudia. (SV 119)
Duration: 6:30, non-stop
Boeing 787 (787)

Virgin Atlantic VS5716
Effective 2025-09-10 through 2025-09-17
Lun
Mar
Mie
Jue
-
Vie
Sab
Dom
-
Codeshare flight, operated by Saudia. (SV 119)
Duration: 6:30, non-stop
Boeing 787-9 (789)

Virgin Atlantic VS5716
Effective 2025-09-18 through 2025-09-24
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Codeshare flight, operated by Saudia. (SV 119)
Duration: 6:30, non-stop
Boeing 787-9 (789)

Virgin Atlantic VS5716
Effective 2025-09-20 through 2025-10-02
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
Dom
Codeshare flight, operated by Saudia. (SV 119)
Duration: 6:30, non-stop
Boeing 787 (787)

Virgin Atlantic VS5716
Effective 2025-09-26 through 2025-10-03
Lun
Mar
Mie
Jue
-
Vie
Sab
-
Dom
-
Codeshare flight, operated by Saudia. (SV 119)
Duration: 6:30, non-stop
Boeing 787-9 (789)

Virgin Atlantic VS5716
Effective 2025-10-04 through 2025-10-10
Lun
Mar
Mie
Jue
-
Vie
Sab
Dom
-
Codeshare flight, operated by Saudia. (SV 119)
Duration: 6:30, non-stop
Boeing 787-9 (789)

Virgin Atlantic VS5716
Effective 2025-10-05 through 2025-10-19
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
Dom
Codeshare flight, operated by Saudia. (SV 119)
Duration: 6:30, non-stop
Boeing 787 (787)

Virgin Atlantic VS5716
Effective 2025-10-13 through 2025-10-21
Lun
Mar
Mie
Jue
-
Vie
Sab
-
Dom
-
Codeshare flight, operated by Saudia. (SV 119)
Duration: 6:30, non-stop
Boeing 787-9 (789)

Virgin Atlantic VS5716
Effective 2025-10-22 through 2025-10-23
Lun
-
Mar
-
Mie
Jue
Vie
-
Sab
-
Dom
-
Codeshare flight, operated by Saudia. (SV 119)
Duration: 6:30, non-stop
Boeing 787 (787)

Virgin Atlantic VS5716
Effective 2025-10-24 through 2025-10-25
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
Dom
-
Codeshare flight, operated by Saudia. (SV 119)
Duration: 6:30, non-stop
Boeing 787-9 (789)

Virgin Atlantic VS5716
Effective from 2025-10-26
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Saudia. (SV 119)
Duration: 6:50, non-stop
Boeing 787-9 (789)
  • VS 5716 es un vuelo internacional saliendo desde el aeropuerto Jeddah (JED) y llegando al aeropuerto London Heathrow (LHR).
  • El vuelo tiene una distancia de 2948 millas, o 4744 km.
  • La zona horaria del aeropuerto de salida es UTC+3 , y la zona horario del aeropuerto de llegada es UTC+0 . La hora actual en el punto de salida es (loading...), y (loading...) en el punto de llegada. Hay una diferencia de tiempo de (loading...) hora/s entre los aeropuertos.
  • Para vuelos directos, el tiempo de vuelo oscila entre 6:30 y 6:50.