Southwest Airlines vuelo WN 5008: Multiple routes

Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:
Jue,Vie,Dom 05:30 Las Vegas Harry Reid (LAS) 1 08:15 Denver (DEN)
WN 5008 Non-stop Boeing 737 MAX 8 (7M8) 1:45 Effective 2025-01-12 through 2025-01-17
Lun,Dom 05:30 Las Vegas Harry Reid (LAS) 1 08:15 Denver (DEN)
WN 5008 Non-stop Boeing 737 MAX 8 (7M8) 1:45 Effective 2025-01-20 through 2025-01-26
Jue,Vie,Dom 05:30 Las Vegas Harry Reid (LAS) 1 08:15 Denver (DEN)
WN 5008 Non-stop Boeing 737 MAX 8 (7M8) 1:45 Effective 2025-02-02 through 2025-02-07
Lun 05:30 Las Vegas Harry Reid (LAS) 1 08:15 Denver (DEN)
WN 5008 Non-stop Boeing 737 MAX 8 (7M8) 1:45 Operates only on 2025-02-10
Lun,Mar,Jue 05:30 Las Vegas Harry Reid (LAS) 1 08:15 Denver (DEN)
WN 5008 Non-stop Boeing 737 MAX 8 (7M8) 1:45 Effective 2025-02-18 through 2025-02-24
Lun 05:30 Las Vegas Harry Reid (LAS) 1 08:15 Denver (DEN)
WN 5008 Non-stop Boeing 737 MAX 8 (7M8) 1:45 Operates only on 2025-03-03
Lun,Jue,Vie,Dom 10:20 Las Vegas Harry Reid (LAS) 1 13:15 Denver (DEN)
WN 5008 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2025-02-13 through 2025-02-17
Jue,Vie,Dom 10:20 Las Vegas Harry Reid (LAS) 1 13:15 Denver (DEN)
WN 5008 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2025-02-21 through 2025-03-02
Lun-Vie 10:45 Las Vegas Harry Reid (LAS) 1 13:40 Denver (DEN)
WN 5008 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2025-01-07 through 2025-01-15
Mar-Vie,Dom 10:45 Las Vegas Harry Reid (LAS) 1 13:40 Denver (DEN)
WN 5008 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2025-01-19 through 2025-01-24
Lun-Vie 10:45 Las Vegas Harry Reid (LAS) 1 13:40 Denver (DEN)
WN 5008 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2025-01-27 through 2025-02-05
Mar,Mie,Dom 10:45 Las Vegas Harry Reid (LAS) 1 13:40 Denver (DEN)
WN 5008 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2025-02-09 through 2025-02-12
Mar,Mie 10:45 Las Vegas Harry Reid (LAS) 1 13:40 Denver (DEN)
WN 5008 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2025-02-19 through 2025-03-05
Sab 11:20 Las Vegas Harry Reid (LAS) 1 14:15 Denver (DEN)
WN 5008 Non-stop Boeing 737-700 (73W) 1:55 Effective 2025-02-15 through 2025-03-01
Lun-Mie 11:25 Las Vegas Harry Reid (LAS) 1 14:20 Denver (DEN)
WN 5008 Non-stop Boeing 737-700 (73W) 1:55 Effective 2024-11-04 through 2024-11-06
Mar,Mie 11:25 Las Vegas Harry Reid (LAS) 1 14:20 Denver (DEN)
WN 5008 Non-stop Boeing 737-700 (73W) 1:55 Effective 2024-11-12 through 2024-11-20
Mar-Vie 11:25 Las Vegas Harry Reid (LAS) 1 14:20 Denver (DEN)
WN 5008 Non-stop Boeing 737-700 (73W) 1:55 Effective 2024-11-29 through 2024-12-06
Lun-Jue 11:25 Las Vegas Harry Reid (LAS) 1 14:20 Denver (DEN)
WN 5008 Non-stop Boeing 737-700 (73W) 1:55 Effective 2024-12-09 through 2024-12-18
Mar,Mie 11:25 Las Vegas Harry Reid (LAS) 1 14:20 Denver (DEN)
WN 5008 Non-stop Boeing 737-700 (73W) 1:55 Effective 2024-12-24 through 2025-01-01
Lun 11:25 Las Vegas Harry Reid (LAS) 1 14:20 Denver (DEN)
WN 5008 Non-stop Boeing 737-700 (73W) 1:55 Operates only on 2025-01-06
Jue,Vie,Dom 11:30 Las Vegas Harry Reid (LAS) 1 14:25 Denver (DEN)
WN 5008 Non-stop Boeing 737-800 (73H) 1:55 Effective 2024-11-03 through 2024-11-10
Lun,Jue,Vie,Dom 11:30 Las Vegas Harry Reid (LAS) 1 14:25 Denver (DEN)
WN 5008 Non-stop Boeing 737-800 (73H) 1:55 Effective 2024-11-11 through 2024-11-25
Vie,Dom 11:30 Las Vegas Harry Reid (LAS) 1 14:25 Denver (DEN)
WN 5008 Non-stop Boeing 737-800 (73H) 1:55 Effective 2024-12-08 through 2024-12-15
Jue 11:30 Las Vegas Harry Reid (LAS) 1 14:25 Denver (DEN)
WN 5008 Non-stop Boeing 737-800 (73H) 1:55 Operates only on 2024-12-19
Vie 11:30 Las Vegas Harry Reid (LAS) 1 14:25 Denver (DEN)
WN 5008 Non-stop Boeing 737-800 (73H) 1:55 Operates only on 2025-01-03
Dom 13:05 Norfolk (ORF) 15:15 Orlando (MCO)
WN 5008 Non-stop Boeing 737-800 (73H) 2:10 Operates only on 2024-12-01
Dom 14:10 Love Field, Dallas (DAL) 1 15:55 Destin/Fort Walton Beach (VPS)
WN 5008 Non-stop Boeing 737-700 (73W) 1:45 Effective 2024-10-06 through 2024-10-20
Dom 14:10 Love Field, Dallas (DAL) 1 15:55 Destin/Fort Walton Beach (VPS)
WN 5008 Non-stop Boeing 737 MAX 8 (7M8) 1:45 Operates only on 2024-10-27
Sab 14:55 Denver (DEN) 19:15 Grand Rapids (GRR)
WN 5008 Non-stop Boeing 737-700 (73W) 2:20 Effective 2025-02-15 through 2025-03-01
Dom 16:00 Orlando (MCO) 16:40 Birmingham (BHM)
WN 5008 Non-stop Boeing 737-800 (73H) 1:40 Operates only on 2024-12-01
Vuelos no directos:
Sab 11:20 Las Vegas Harry Reid (LAS) 1 19:15 Grand Rapids (GRR)
WN 5008 1-stop Boeing 737-700 (73W) 4:55 Effective 2025-02-15 through 2025-03-01
Dom 13:05 Norfolk (ORF) 16:40 Birmingham (BHM)
WN 5008 1-stop Boeing 737-800 (73H) 4:35 Operates only on 2024-12-01
This flight number is listed as serving the following routes:
Southwest Airlines vuelo WN 5008: Multiple routes
Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:

Southwest Airlines WN5008
Effective 2025-01-12 through 2025-01-17
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:45, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN5008
Effective 2025-01-20 through 2025-01-26
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:45, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN5008
Effective 2025-02-02 through 2025-02-07
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:45, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN5008
Operates only on 2025-02-10
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:45, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN5008
Effective 2025-02-18 through 2025-02-24
Lun
Mar
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:45, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN5008
Operates only on 2025-03-03
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:45, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN5008
Effective 2025-02-13 through 2025-02-17
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN5008
Effective 2025-02-21 through 2025-03-02
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN5008
Effective 2025-01-07 through 2025-01-15
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN5008
Effective 2025-01-19 through 2025-01-24
Lun
-
Mar
Mie
Jue
Vie
Sab
-
Dom
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN5008
Effective 2025-01-27 through 2025-02-05
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN5008
Effective 2025-02-09 through 2025-02-12
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN5008
Effective 2025-02-19 through 2025-03-05
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN5008
Effective 2025-02-15 through 2025-03-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN5008
Effective 2024-11-04 through 2024-11-06
Lun
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN5008
Effective 2024-11-12 through 2024-11-20
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN5008
Effective 2024-11-29 through 2024-12-06
Lun
-
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN5008
Effective 2024-12-09 through 2024-12-18
Lun
Mar
Mie
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN5008
Effective 2024-12-24 through 2025-01-01
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN5008
Operates only on 2025-01-06
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN5008
Effective 2024-11-03 through 2024-11-10
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:55, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN5008
Effective 2024-11-11 through 2024-11-25
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:55, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN5008
Effective 2024-12-08 through 2024-12-15
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
Duration: 1:55, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN5008
Operates only on 2024-12-19
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:55, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN5008
Operates only on 2025-01-03
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 1:55, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN5008
Operates only on 2024-12-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN5008
Effective 2024-10-06 through 2024-10-20
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:45, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN5008
Operates only on 2024-10-27
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:45, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN5008
Effective 2025-02-15 through 2025-03-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN5008
Operates only on 2024-12-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:40, non-stop
Boeing 737-800 (73H)

Vuelos no directos:

Southwest Airlines WN5008
Effective 2025-02-15 through 2025-03-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 4:55, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN5008
Operates only on 2024-12-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 4:35, 1-stop
Boeing 737-800 (73H)
This flight number is listed as serving the following routes:
  • Denver (DEN) - Grand Rapids (GRR)
  • Las Vegas Harry Reid (LAS) - Denver (DEN)
  • Las Vegas Harry Reid (LAS) - Grand Rapids (GRR)
  • Love Field, Dallas (DAL) - Destin/Fort Walton Beach (VPS)
  • Norfolk (ORF) - Birmingham (BHM)
  • Norfolk (ORF) - Orlando (MCO)
  • Orlando (MCO) - Birmingham (BHM)