Southwest Airlines vuelo WN 4330: Multiple routes

Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:
Mie 08:30 Chicago Midway (MDW) 11:50 Manchester (MHT)
WN 4330 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Effective 2026-08-05 through 2026-09-30
Lun,Jue,Vie 09:30 Denver (DEN) 14:45 Washington Dulles (IAD)
WN 4330 Non-stop Boeing 737 MAX 8 (7M8) 3:15 Effective 2026-02-12 through 2026-02-16
Vie,Dom 09:30 Denver (DEN) 14:45 Washington Dulles (IAD)
WN 4330 Non-stop Boeing 737 MAX 8 (7M8) 3:15 Effective 2026-02-20 through 2026-02-22
Jue,Vie,Dom 09:30 Denver (DEN) 14:45 Washington Dulles (IAD)
WN 4330 Non-stop Boeing 737-800 (73H) 3:15 Effective 2026-02-26 through 2026-03-01
Lun 09:40 San Diego (SAN) 1 11:05 Las Vegas Harry Reid (LAS) 1
WN 4330 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Operates only on 2026-01-05
Lun-Vie 10:35 Denver (DEN) 15:50 Washington Dulles (IAD)
WN 4330 Non-stop Boeing 737-800 (73H) 3:15 Effective 2026-01-06 through 2026-01-14
Mar-Vie,Dom 10:35 Denver (DEN) 15:50 Washington Dulles (IAD)
WN 4330 Non-stop Boeing 737-800 (73H) 3:15 Effective 2026-01-18 through 2026-01-23
Lun-Vie 10:35 Denver (DEN) 15:50 Washington Dulles (IAD)
WN 4330 Non-stop Boeing 737-800 (73H) 3:15 Effective 2026-01-26 through 2026-02-04
Mar,Mie,Dom 10:35 Denver (DEN) 15:50 Washington Dulles (IAD)
WN 4330 Non-stop Boeing 737-800 (73H) 3:15 Effective 2026-02-08 through 2026-02-11
Mar,Mie 10:35 Denver (DEN) 15:50 Washington Dulles (IAD)
WN 4330 Non-stop Boeing 737-800 (73H) 3:15 Effective 2026-02-18 through 2026-03-04
Jue,Vie,Dom 10:45 Denver (DEN) 16:00 Washington Dulles (IAD)
WN 4330 Non-stop Boeing 737-800 (73H) 3:15 Effective 2026-01-11 through 2026-01-16
Lun,Dom 10:45 Denver (DEN) 16:00 Washington Dulles (IAD)
WN 4330 Non-stop Boeing 737-800 (73H) 3:15 Effective 2026-01-19 through 2026-01-25
Jue,Vie,Dom 10:45 Denver (DEN) 16:00 Washington Dulles (IAD)
WN 4330 Non-stop Boeing 737-800 (73H) 3:15 Effective 2026-02-01 through 2026-02-06
Lun,Dom 10:45 Denver (DEN) 16:00 Washington Dulles (IAD)
WN 4330 Non-stop Boeing 737-800 (73H) 3:15 Effective 2026-02-09 through 2026-02-15
Lun,Mar,Jue 10:45 Denver (DEN) 16:00 Washington Dulles (IAD)
WN 4330 Non-stop Boeing 737-800 (73H) 3:15 Effective 2026-02-17 through 2026-02-23
Lun 10:45 Denver (DEN) 16:00 Washington Dulles (IAD)
WN 4330 Non-stop Boeing 737-800 (73H) 3:15 Operates only on 2026-03-02
Lun,Jue,Vie 14:00 Las Vegas Harry Reid (LAS) 1 18:30 Oklahoma City (OKC)
WN 4330 Non-stop Boeing 737-800 (73H) 2:30 Effective 2026-08-06 through 2026-09-28
Lun,Jue,Vie 15:25 Denver (DEN) 19:50 Indianapolis (IND)
WN 4330 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-06-04 through 2026-08-03
Sab 17:00 Dallas Love Field (DAL) 1 18:35 Sacramento (SMF) B
WN 4330 Non-stop Boeing 737 MAX 8 (7M8) 3:35 Effective 2026-08-08 through 2026-09-26
Mar 17:05 Tampa (TPA) 19:25 Baltimore (BWI)
WN 4330 Non-stop Boeing 737-800 (73H) 2:20 Effective 2026-08-04 through 2026-09-29
Sab 18:45 Las Vegas Harry Reid (LAS) 1 23:20 Dallas Love Field (DAL) 1
WN 4330 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Valid until 2026-01-03
Dom 19:05 Las Vegas Harry Reid (LAS) 1 23:30 Oklahoma City (OKC)
WN 4330 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2026-08-09 through 2026-09-27
This flight number is listed as serving the following routes:
Southwest Airlines vuelo WN 4330: Multiple routes
Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:

Southwest Airlines WN4330
Effective 2026-08-05 through 2026-09-30
Lun
-
Mar
-
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Vuelos directos:

Southwest Airlines WN4330
Effective 2026-02-12 through 2026-02-16
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 3:15, non-stop
Boeing 737 MAX 8 (7M8)

Vuelos directos:

Southwest Airlines WN4330
Effective 2026-02-20 through 2026-02-22
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
Duration: 3:15, non-stop
Boeing 737 MAX 8 (7M8)

Vuelos directos:

Southwest Airlines WN4330
Effective 2026-02-26 through 2026-03-01
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 3:15, non-stop
Boeing 737-800 (73H)

Vuelos directos:

Southwest Airlines WN4330
Operates only on 2026-01-05
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:25, non-stop
Boeing 737-700 (Scimitar Winglets)

Vuelos directos:

Southwest Airlines WN4330
Effective 2026-01-06 through 2026-01-14
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 3:15, non-stop
Boeing 737-800 (73H)

Vuelos directos:

Southwest Airlines WN4330
Effective 2026-01-18 through 2026-01-23
Lun
-
Mar
Mie
Jue
Vie
Sab
-
Dom
Duration: 3:15, non-stop
Boeing 737-800 (73H)

Vuelos directos:

Southwest Airlines WN4330
Effective 2026-01-26 through 2026-02-04
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 3:15, non-stop
Boeing 737-800 (73H)

Vuelos directos:

Southwest Airlines WN4330
Effective 2026-02-08 through 2026-02-11
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
Duration: 3:15, non-stop
Boeing 737-800 (73H)

Vuelos directos:

Southwest Airlines WN4330
Effective 2026-02-18 through 2026-03-04
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 3:15, non-stop
Boeing 737-800 (73H)

Vuelos directos:

Southwest Airlines WN4330
Effective 2026-01-11 through 2026-01-16
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 3:15, non-stop
Boeing 737-800 (73H)

Vuelos directos:

Southwest Airlines WN4330
Effective 2026-01-19 through 2026-01-25
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 3:15, non-stop
Boeing 737-800 (73H)

Vuelos directos:

Southwest Airlines WN4330
Effective 2026-02-01 through 2026-02-06
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 3:15, non-stop
Boeing 737-800 (73H)

Vuelos directos:

Southwest Airlines WN4330
Effective 2026-02-09 through 2026-02-15
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 3:15, non-stop
Boeing 737-800 (73H)

Vuelos directos:

Southwest Airlines WN4330
Effective 2026-02-17 through 2026-02-23
Lun
Mar
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 3:15, non-stop
Boeing 737-800 (73H)

Vuelos directos:

Southwest Airlines WN4330
Operates only on 2026-03-02
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 3:15, non-stop
Boeing 737-800 (73H)

Vuelos directos:

Southwest Airlines WN4330
Effective 2026-08-06 through 2026-09-28
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 2:30, non-stop
Boeing 737-800 (73H)

Vuelos directos:

Southwest Airlines WN4330
Effective 2026-06-04 through 2026-08-03
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Vuelos directos:

Southwest Airlines WN4330
Effective 2026-08-08 through 2026-09-26
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 3:35, non-stop
Boeing 737 MAX 8 (7M8)

Vuelos directos:

Southwest Airlines WN4330
Effective 2026-08-04 through 2026-09-29
Lun
-
Mar
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Vuelos directos:

Southwest Airlines WN4330
Valid until 2026-01-03
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:35, non-stop
Boeing 737 MAX 8 (7M8)

Vuelos directos:

Southwest Airlines WN4330
Effective 2026-08-09 through 2026-09-27
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)
This flight number is listed as serving the following routes:
  • Chicago Midway (MDW) - Manchester (MHT)
  • Dallas Love Field (DAL) - Sacramento (SMF)
  • Denver (DEN) - Indianapolis (IND)
  • Denver (DEN) - Washington Dulles (IAD)
  • Las Vegas Harry Reid (LAS) - Dallas Love Field (DAL)
  • Las Vegas Harry Reid (LAS) - Oklahoma City (OKC)
  • San Diego (SAN) - Las Vegas Harry Reid (LAS)
  • Tampa (TPA) - Baltimore (BWI)