Southwest Airlines vuelo WN 417: Multiple routes

Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:
Sab 06:20 Midway, Chicago (MDW) 08:00 Denver (DEN)
WN 417 Non-stop Boeing 737-700 (73W) 2:40 Effective 2024-10-05 through 2024-10-26
Lun,Jue,Vie 06:45 Las Vegas Harry Reid (LAS) 1 11:20 San Antonio (SAT) A
WN 417 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Effective 2024-10-03 through 2024-10-28
Vie 06:45 Las Vegas Harry Reid (LAS) 1 11:20 San Antonio (SAT) A
WN 417 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Operates only on 2024-11-01
Dom 07:00 Las Vegas Harry Reid (LAS) 1 11:40 San Antonio (SAT) A
WN 417 Non-stop Boeing 737-700 (73W) 2:40 Effective 2024-10-06 through 2024-10-27
Jue 08:40 Las Vegas Harry Reid (LAS) 1 13:15 San Antonio (SAT) A
WN 417 Non-stop Boeing 737-800 (73H) 2:35 Operates only on 2024-10-31
Sab 08:45 Denver (DEN) 11:50 San Antonio (SAT) A
WN 417 Non-stop Boeing 737-700 (73W) 2:05 Effective 2024-10-05 through 2024-11-02
Sab 09:55 Love Field, Dallas (DAL) 1 13:10 John Glenn Columbus (CMH)
WN 417 Non-stop Boeing 737-700 (73W) 2:15 Effective 2025-01-11 through 2025-02-08
Dom 10:35 Sacramento (SMF) B 12:05 San Diego (SAN) 1
WN 417 Non-stop Boeing 737-700 (73W) 1:30 Effective 2024-09-08 through 2024-09-29
Sab 10:45 Love Field, Dallas (DAL) 1 14:00 John Glenn Columbus (CMH)
WN 417 Non-stop Boeing 737-800 (73H) 2:15 Effective 2025-02-15 through 2025-03-01
Dom 11:00 Love Field, Dallas (DAL) 1 12:10 Little Rock (LIT)
WN 417 Non-stop Boeing 737-700 (73W) 1:10 Operates only on 2024-12-01
Lun-Mie 11:10 Love Field, Dallas (DAL) 1 12:20 Little Rock (LIT)
WN 417 Non-stop Boeing 737-700 (73W) 1:10 Effective 2024-11-26 through 2024-12-02
Lun,Jue,Vie,Dom 11:10 Love Field, Dallas (DAL) 1 12:20 Little Rock (LIT)
WN 417 Non-stop Boeing 737-700 (73W) 1:10 Effective 2024-12-20 through 2025-01-02
Dom 11:10 Love Field, Dallas (DAL) 1 12:20 Little Rock (LIT)
WN 417 Non-stop Boeing 737-700 (73W) 1:10 Operates only on 2025-01-05
Sab 11:45 Love Field, Dallas (DAL) 1 12:35 Las Vegas Harry Reid (LAS) 1
WN 417 Non-stop Boeing 737-700 (73W) 2:50 Valid until 2024-09-28
Jue 11:55 Love Field, Dallas (DAL) 1 15:10 John Glenn Columbus (CMH)
WN 417 Non-stop Boeing 737-700 (73W) 2:15 Operates only on 2024-11-28
Mar,Mie 12:00 San Antonio (SAT) A 15:20 Tampa (TPA)
WN 417 Non-stop Boeing 737-700 (73W) 2:20 Effective 2024-10-08 through 2024-10-30
Sab 12:30 San Antonio (SAT) A 15:45 Tampa (TPA)
WN 417 Non-stop Boeing 737-700 (73W) 2:15 Effective 2024-10-05 through 2024-11-02
Lun-Vie 12:35 Love Field, Dallas (DAL) 1 15:50 John Glenn Columbus (CMH)
WN 417 Non-stop Boeing 737-800 (73H) 2:15 Effective 2025-01-07 through 2025-01-15
Mar-Vie,Dom 12:35 Love Field, Dallas (DAL) 1 15:50 John Glenn Columbus (CMH)
WN 417 Non-stop Boeing 737-800 (73H) 2:15 Effective 2025-01-19 through 2025-01-24
Lun-Vie 12:35 Love Field, Dallas (DAL) 1 15:50 John Glenn Columbus (CMH)
WN 417 Non-stop Boeing 737-800 (73H) 2:15 Effective 2025-01-27 through 2025-02-05
Mar,Mie,Dom 12:35 Love Field, Dallas (DAL) 1 15:50 John Glenn Columbus (CMH)
WN 417 Non-stop Boeing 737-800 (73H) 2:15 Effective 2025-02-09 through 2025-02-12
Mar,Mie 12:35 Love Field, Dallas (DAL) 1 15:50 John Glenn Columbus (CMH)
WN 417 Non-stop Boeing 737-800 (73H) 2:15 Effective 2025-02-19 through 2025-03-05
Sab 12:40 Love Field, Dallas (DAL) 1 13:50 Little Rock (LIT)
WN 417 Non-stop Boeing 737-800 (73H) 1:10 Effective 2024-11-23 through 2024-11-30
Sab 12:40 Love Field, Dallas (DAL) 1 13:50 Little Rock (LIT)
WN 417 Non-stop Boeing 737-800 (73H) 1:10 Effective 2024-12-21 through 2025-01-04
Dom 12:45 San Diego (SAN) 1 14:05 Las Vegas Harry Reid (LAS) 1
WN 417 Non-stop Boeing 737-700 (73W) 1:20 Effective 2024-09-08 through 2024-09-29
Lun,Jue,Vie 13:05 Long Beach (LGB) 14:25 Sacramento (SMF) B
WN 417 Non-stop Boeing 737-700 (73W) 1:20 Valid until 2024-09-30
Sab 13:15 Las Vegas Harry Reid (LAS) 1 14:50 San Jose (SJC) B
WN 417 Non-stop Boeing 737-700 (73W) 1:35 Valid until 2024-09-28
Lun-Mie 13:45 Love Field, Dallas (DAL) 1 17:00 John Glenn Columbus (CMH)
WN 417 Non-stop Boeing 737 MAX 8 (7M8) 2:15 Effective 2024-11-04 through 2024-11-06
Mar,Mie 13:45 Love Field, Dallas (DAL) 1 17:00 John Glenn Columbus (CMH)
WN 417 Non-stop Boeing 737 MAX 8 (7M8) 2:15 Effective 2024-11-12 through 2024-11-20
Mar-Vie 13:45 Love Field, Dallas (DAL) 1 17:00 John Glenn Columbus (CMH)
WN 417 Non-stop Boeing 737 MAX 8 (7M8) 2:15 Effective 2024-11-29 through 2024-12-06
Lun-Jue 13:45 Love Field, Dallas (DAL) 1 17:00 John Glenn Columbus (CMH)
WN 417 Non-stop Boeing 737 MAX 8 (7M8) 2:15 Effective 2024-12-09 through 2024-12-18
Mar,Mie 13:45 Love Field, Dallas (DAL) 1 17:00 John Glenn Columbus (CMH)
WN 417 Non-stop Boeing 737 MAX 8 (7M8) 2:15 Effective 2024-12-24 through 2025-01-01
Lun 13:45 Love Field, Dallas (DAL) 1 17:00 John Glenn Columbus (CMH)
WN 417 Non-stop Boeing 737 MAX 8 (7M8) 2:15 Operates only on 2025-01-06
Mar,Mie 14:30 Las Vegas Harry Reid (LAS) 1 16:10 San Jose (SJC) B
WN 417 Non-stop Boeing 737-800 (73H) 1:40 Valid until 2024-10-02
Sab 14:35 Little Rock (LIT) 16:45 Phoenix Sky Harbor (PHX) 4
WN 417 Non-stop Boeing 737-800 (73H) 3:10 Effective 2024-11-23 through 2024-11-30
Sab 14:35 Little Rock (LIT) 16:45 Phoenix Sky Harbor (PHX) 4
WN 417 Non-stop Boeing 737-800 (73H) 3:10 Effective 2024-12-21 through 2025-01-04
Dom 14:45 Las Vegas Harry Reid (LAS) 1 16:25 San Jose (SJC) B
WN 417 Non-stop Boeing 737-700 (73W) 1:40 Effective 2024-09-08 through 2024-09-29
Dom 15:40 Las Vegas Harry Reid (LAS) 1 17:15 San Jose (SJC) B
WN 417 Non-stop Boeing 737-700 (73W) 1:35 Operates only on 2024-09-01
Jue,Vie,Dom 15:55 Love Field, Dallas (DAL) 1 19:10 John Glenn Columbus (CMH)
WN 417 Non-stop Boeing 737 MAX 8 (7M8) 2:15 Effective 2025-01-12 through 2025-01-17
Lun,Dom 15:55 Love Field, Dallas (DAL) 1 19:10 John Glenn Columbus (CMH)
WN 417 Non-stop Boeing 737 MAX 8 (7M8) 2:15 Effective 2025-01-20 through 2025-01-26
Jue,Vie,Dom 15:55 Love Field, Dallas (DAL) 1 19:10 John Glenn Columbus (CMH)
WN 417 Non-stop Boeing 737 MAX 8 (7M8) 2:15 Effective 2025-02-02 through 2025-02-07
Lun 15:55 Love Field, Dallas (DAL) 1 19:10 John Glenn Columbus (CMH)
WN 417 Non-stop Boeing 737 MAX 8 (7M8) 2:15 Operates only on 2025-02-10
Lun,Mar,Jue 15:55 Love Field, Dallas (DAL) 1 19:10 John Glenn Columbus (CMH)
WN 417 Non-stop Boeing 737 MAX 8 (7M8) 2:15 Effective 2025-02-18 through 2025-02-24
Lun 15:55 Love Field, Dallas (DAL) 1 19:10 John Glenn Columbus (CMH)
WN 417 Non-stop Boeing 737 MAX 8 (7M8) 2:15 Operates only on 2025-03-03
Lun,Jue,Vie,Dom 17:00 Love Field, Dallas (DAL) 1 20:15 John Glenn Columbus (CMH)
WN 417 Non-stop Boeing 737-800 (73H) 2:15 Effective 2025-02-13 through 2025-02-17
Jue,Vie,Dom 17:00 Love Field, Dallas (DAL) 1 20:15 John Glenn Columbus (CMH)
WN 417 Non-stop Boeing 737-800 (73H) 2:15 Effective 2025-02-21 through 2025-03-02
Jue,Vie,Dom 18:30 Ronald Reagan Washington (DCA) 19:35 Midway, Chicago (MDW)
WN 417 Non-stop Boeing 737-800 (73H) 2:05 Effective 2024-11-03 through 2024-11-10
Lun,Jue,Vie,Dom 18:30 Ronald Reagan Washington (DCA) 19:35 Midway, Chicago (MDW)
WN 417 Non-stop Boeing 737-800 (73H) 2:05 Effective 2024-11-11 through 2024-11-25
Vie,Dom 18:30 Ronald Reagan Washington (DCA) 19:35 Midway, Chicago (MDW)
WN 417 Non-stop Boeing 737-800 (73H) 2:05 Effective 2024-12-08 through 2024-12-15
Jue 18:30 Ronald Reagan Washington (DCA) 19:35 Midway, Chicago (MDW)
WN 417 Non-stop Boeing 737-800 (73H) 2:05 Operates only on 2024-12-19
Vie 18:30 Ronald Reagan Washington (DCA) 19:35 Midway, Chicago (MDW)
WN 417 Non-stop Boeing 737-800 (73H) 2:05 Operates only on 2025-01-03
Vuelos no directos:
Sab 06:20 Midway, Chicago (MDW) 11:50 San Antonio (SAT) A
WN 417 1-stop Boeing 737-700 (73W) 5:30 Effective 2024-10-05 through 2024-10-26
Sab 08:45 Denver (DEN) 15:45 Tampa (TPA)
WN 417 1-stop Boeing 737-700 (73W) 5:00 Effective 2024-10-05 through 2024-11-02
Dom 10:35 Sacramento (SMF) B 14:05 Las Vegas Harry Reid (LAS) 1
WN 417 1-stop Boeing 737-700 (73W) 3:30 Effective 2024-09-08 through 2024-09-29
Sab 11:45 Love Field, Dallas (DAL) 1 14:50 San Jose (SJC) B
WN 417 1-stop Boeing 737-700 (73W) 5:05 Valid until 2024-09-28
Sab 12:40 Love Field, Dallas (DAL) 1 16:45 Phoenix Sky Harbor (PHX) 4
WN 417 1-stop Boeing 737-800 (73H) 5:05 Effective 2024-11-23 through 2024-11-30
Sab 12:40 Love Field, Dallas (DAL) 1 16:45 Phoenix Sky Harbor (PHX) 4
WN 417 1-stop Boeing 737-800 (73H) 5:05 Effective 2024-12-21 through 2025-01-04
Dom 12:45 San Diego (SAN) 1 16:25 San Jose (SJC) B
WN 417 1-stop Boeing 737-700 (73W) 3:40 Effective 2024-09-08 through 2024-09-29
Sab 06:20 Midway, Chicago (MDW) 15:45 Tampa (TPA)
WN 417 2-stop Boeing 737-700 (73W) 8:25 Effective 2024-10-05 through 2024-10-26
Dom 10:35 Sacramento (SMF) B 16:25 San Jose (SJC) B
WN 417 2-stop Boeing 737-700 (73W) 5:50 Effective 2024-09-08 through 2024-09-29
This flight number is listed as serving the following routes:
Southwest Airlines vuelo WN 417: Multiple routes
Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:

Southwest Airlines WN417
Effective 2024-10-05 through 2024-10-26
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN417
Effective 2024-10-03 through 2024-10-28
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 2:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN417
Operates only on 2024-11-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 2:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN417
Effective 2024-10-06 through 2024-10-27
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN417
Operates only on 2024-10-31
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 2:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN417
Effective 2024-10-05 through 2024-11-02
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:05, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN417
Effective 2025-01-11 through 2025-02-08
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN417
Effective 2024-09-08 through 2024-09-29
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN417
Effective 2025-02-15 through 2025-03-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:15, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN417
Operates only on 2024-12-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN417
Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN417
Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN417
Operates only on 2025-01-05
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN417
Valid until 2024-09-28
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN417
Operates only on 2024-11-28
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 2:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN417
Effective 2024-10-08 through 2024-10-30
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN417
Effective 2024-10-05 through 2024-11-02
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN417
Effective 2025-01-07 through 2025-01-15
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 2:15, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN417
Effective 2025-01-19 through 2025-01-24
Lun
-
Mar
Mie
Jue
Vie
Sab
-
Dom
Duration: 2:15, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN417
Effective 2025-01-27 through 2025-02-05
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 2:15, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN417
Effective 2025-02-09 through 2025-02-12
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:15, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN417
Effective 2025-02-19 through 2025-03-05
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:15, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN417
Effective 2024-11-23 through 2024-11-30
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN417
Effective 2024-12-21 through 2025-01-04
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN417
Effective 2024-09-08 through 2024-09-29
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN417
Valid until 2024-09-30
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN417
Valid until 2024-09-28
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN417
Effective 2024-11-04 through 2024-11-06
Lun
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN417
Effective 2024-11-12 through 2024-11-20
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN417
Effective 2024-11-29 through 2024-12-06
Lun
-
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 2:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN417
Effective 2024-12-09 through 2024-12-18
Lun
Mar
Mie
Jue
Vie
-
Sab
-
Dom
-
Duration: 2:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN417
Effective 2024-12-24 through 2025-01-01
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN417
Operates only on 2025-01-06
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN417
Valid until 2024-10-02
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:40, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN417
Effective 2024-11-23 through 2024-11-30
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 3:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN417
Effective 2024-12-21 through 2025-01-04
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 3:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN417
Effective 2024-09-08 through 2024-09-29
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN417
Operates only on 2024-09-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN417
Effective 2025-01-12 through 2025-01-17
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN417
Effective 2025-01-20 through 2025-01-26
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN417
Effective 2025-02-02 through 2025-02-07
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN417
Operates only on 2025-02-10
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN417
Effective 2025-02-18 through 2025-02-24
Lun
Mar
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 2:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN417
Operates only on 2025-03-03
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN417
Effective 2025-02-13 through 2025-02-17
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:15, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN417
Effective 2025-02-21 through 2025-03-02
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:15, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN417
Effective 2024-11-03 through 2024-11-10
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN417
Effective 2024-11-11 through 2024-11-25
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN417
Effective 2024-12-08 through 2024-12-15
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN417
Operates only on 2024-12-19
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN417
Operates only on 2025-01-03
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Vuelos no directos:

Southwest Airlines WN417
Effective 2024-10-05 through 2024-10-26
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 5:30, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN417
Effective 2024-10-05 through 2024-11-02
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 5:00, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN417
Effective 2024-09-08 through 2024-09-29
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 3:30, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN417
Valid until 2024-09-28
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 5:05, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN417
Effective 2024-11-23 through 2024-11-30
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 5:05, 1-stop
Boeing 737-800 (73H)

Southwest Airlines WN417
Effective 2024-12-21 through 2025-01-04
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 5:05, 1-stop
Boeing 737-800 (73H)

Southwest Airlines WN417
Effective 2024-09-08 through 2024-09-29
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 3:40, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN417
Effective 2024-10-05 through 2024-10-26
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 8:25, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN417
Effective 2024-09-08 through 2024-09-29
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 5:50, 2-stop
Boeing 737-700 (73W)
This flight number is listed as serving the following routes:
  • Denver (DEN) - San Antonio (SAT)
  • Denver (DEN) - Tampa (TPA)
  • Las Vegas Harry Reid (LAS) - San Antonio (SAT)
  • Las Vegas Harry Reid (LAS) - San Jose (SJC)
  • Little Rock (LIT) - Phoenix Sky Harbor (PHX)
  • Long Beach (LGB) - Sacramento (SMF)
  • Love Field, Dallas (DAL) - John Glenn Columbus (CMH)
  • Love Field, Dallas (DAL) - Las Vegas Harry Reid (LAS)
  • Love Field, Dallas (DAL) - Little Rock (LIT)
  • Love Field, Dallas (DAL) - Phoenix Sky Harbor (PHX)
  • Love Field, Dallas (DAL) - San Jose (SJC)
  • Midway, Chicago (MDW) - Denver (DEN)
  • Midway, Chicago (MDW) - San Antonio (SAT)
  • Midway, Chicago (MDW) - Tampa (TPA)
  • Ronald Reagan Washington (DCA) - Midway, Chicago (MDW)
  • Sacramento (SMF) - Las Vegas Harry Reid (LAS)
  • Sacramento (SMF) - San Diego (SAN)
  • Sacramento (SMF) - San Jose (SJC)
  • San Antonio (SAT) - Tampa (TPA)
  • San Diego (SAN) - Las Vegas Harry Reid (LAS)
  • San Diego (SAN) - San Jose (SJC)